已閱讀5頁(yè),還剩2頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
英文原文TheInjectionMolding1.TheinjectionmoldingInjectionmoldingisprincipallyusedfortheproductionofthethermoplasticparts,althoughsomeprogresshasbeenmadeindevelopingamethodforinjectionmoldingsomethermosettingmaterials.Theproblemofinjectionamethodplasticintoamoldcavityfromareservoirinjectionmoldingisquitesimilartothatofdie-casting.Theprocessconsistsoffeedingaplasticcompoundinpoweredorgranularformfromahopperthroughmeteringandmeltingstagesandtheninjectionitintoamold.Afterabriefcoolingperiod,themoldisopenedandthesolidifiedpartejected.Injection-moldingmachineoperation.Theadvantageofinjectionmoldingare:(i)ahighmoldingspeedadapterformassproductionispossible;(ii)thereisawidechoiceofthermoplasticmaterialsprovidingavarietyofusefulproperties;(iii)itispossibletomoldthreads,undercuts,sideholes,andlargethinsection.2.Theinjection-moldingmachineSeveralmethodsareusedtoforceorinjectionthemeltedplasticintothemold.Themostcommonlyusedsysteminthein-linereciprocatingscrew,asshowninFigure2-1.Thescrewactsasacombinationinjectionandplasticizingunit.Astheplasticisfedtorotatingscrew,itpassesthroughthreezonesasshown:feed,compression,andmetering.Afterthefeedzone,thescrew-flightdepthisgraduallyreduced.forcetheplastictocompress.Theworkisconvertedtoheatbyconductionfromthebarrelsurface.Asthechamberinfrontofthescrewbecomesfilled,itforcesthescrewback,trippingalimitswitchthatactivatesahydrauliccylinderthatforcesthescrewforwardandinjectsthefluidplasticintotheclosedmold.Anantiflowbackvavlepresentsplasticunderpressurefromescapingbackintothescrewflight.Theclampingforcethatamachineiscapableofexertingispartofthesizedesignationandismeasuredintons.Arule-ofthumbcanbeusedtodeterminethetonnagerequiredforaparticularjob.Itisbasedontwotonsofclampforcepersquareinchofprojectedarea.Iftheflowpatternisdifficultandthepartsarethin,thismayhavetogotothreeorfourtons.Manyreciprocating-screwmachinesarecapableofhandingthermosettingplasticmaterials.Previouslythesematerialswerehandledbycompressiongortransfermolding.Thermosettingmaterialscureorpolymerizeinthemoldandareejectedhotintherangeof375410.Thermosettingpartsmustbeallowedtocoolinthemoldinorderorremovethemwithoutdistortion.Thusthermosettingcyclescanbefaster.Ofcoursethemoldmustbeheatedratherthanchilled,aswiththermoplastics.3.BasicUnderfeedMouldThedescriptionofthedesignandtheopeningsequencefollows.Themouldconsistsofthreebasicparts,namely:themovinghalf,thefloatingcavityplateandthefeedplaterespectively.ThemovinghalfconsistsofThemovingmouldplateassembly,supportblock,backingplate,ejectorassemblyandthepinejectiongsystem.Thusthemovinghalfinthisdesignisidenticalwiththemovinghalfofbasicmoulds.Thefloatingcavityplate,whichmaybetheintegerorinsert-bolsterdesign,islocatedonsubstantialguidepillars(notshown)fittedinthefeedplate.Theseguidepillarsmustbeofsufficientlengthtosupportthefloatingcavityplateoveritsfullmovementandstillprojecttoperformthefunctionofalignmentbetweenthecavityandcorewhenthemouldisbeingclosed.Guidebushesarefittedintothemovingmouldplateandthefloatingcavityplaterespectively.Themaximummovementofthefloatingcavityplateiscontrolledbystoporsimilardevice.Themovingmouldplateissuitablyboredtoprovidesufficientaclearanceforthestopboltassembly.Thestopboltsmustbelongenoughtoprovidesufficientspacebetweenthefeedplateandthefloatingcavityplateforeasyremovalofthefeedsystem.Theminimumspaceprovideforshouldbe65mmjustsufficientforanoperatortoremovethefeedsystembyhandifnecessary.Thedesireoperatingsequenceisforthefirstdaylighttooccurbetweenthefloatingcavityplate.Thisensuresthesprueispulledfromthespruebushimmediatelythemouldisopened.Toachievethissequence,springsmaybeincorporatedbetweenthefeedplateandthefloatingcavityplate.Thespringsshouldbeenoughtogiveaninitialimpetustothefloatingcavityplatetoensureitmovesawaywiththemovinghalf.Itisnormalpracticetomountthespringsontheguidepillarsandaccommodatetheminsuitablepocketinthecavityplate.Themajorpartofthefeedsystem(runnerandsprue)isaccmmodatedinthefeedplatetofacilitateautomaticoperation,therunnershouldbeofatrapezoidalformsothatonceitispulledfromthefeedplateiscaneasilybeextracted.Notethatifaroundrunnerisused,halftherunnerisformedinthefloatingcavityplate,whereitwouldremain,andbepreventedfromfallingorbeingwipedclearwhenthemouldisopened.Nowthatwehaveconsideredthemouldassemblyinthesomedetail,welookatthecycleofoperationforthistypeofmould.Theimpressionsarefilledviathefeedsystemandafterasuitabledwellperiod,themachineplatenscommencetoopen.Aforceisimmediatelyexertedbythecompressionsprings,whichcausethefloatingcavityplatetomoveawaywiththemovinghalfaspreviouslydiscussed.Thesprueispulledfromthespruebushbythespruepuller.Afterthefloatingcavityplatehasmovedapredetermineddistance,itisarrestedbythestopbolts.Themovinghalfcontinuedtomovebackandthemoldings,havingshrunkontothecores,arewithdrawnfromthecavitities.Thepingatebreaksatitsjunctionwiththerunner.Thespruepuller,beingattachedtothemovinghalf,ispulledthroughthefloatingcavityplateandtherebyreleasethefeedsystemwhichthenfreetofallbetweenthefloatingcavityplateandthemoldingsareejected.Whenthemouldisclosed,therespectiveplatesarereturnedtotheirmoldingpositionandthecycleisrepeated.4.FeedSystemItisnecessarytoprovideaflow-wayintheinjectionmouldtoconnectthenozzle(oftheinjectionmachine)toeachimpression.Thisflow-wayistermedthefeedsystem.Normallythefeedsystemcomprisesasprue,runnerandgate.Thesetermsapplyequallytotheflow-wayitself,andtothemoldedmaterialwhichisremovefromtheflow-wayitselfintheprocessofextractedmolding.Atypicalfeedsystemforafour-impression,twoplate-typemould.Itisseenthatthematerialpassesthroughthesprue,mainrunner,branchrunnerandgatebeforeenteringtheimpression.Asthetemperatureofmoltenplasticisloweredwhichgoingthroughthesprueandrunner,theviscositywillrise;however,theviscosityisloweredbysheargeneratedwhengoingthroughthegatetofillthecavity.Tiisdesirabletokeepthedistancethatthematerialhastotraveldowntoaminimumtoreducepressureandheatlosses.Itisforthereasonthatcarefulconsiderationmustbegiventotheimpressionlayoutgatesdesign.4.1SprueAsprueisachannelthroughwhichtotransfermoltenplasticinjectedfromthenozzleoftheinjectorintothemold.Itisapartofspruebush,whichisaseparatepartfromthemold.4.2RunnerArunnerisachannelthatguidesmoltenplasticintothecavityofamold.4.3GateAgateisanentrancethroughwhichmoltenplasticentersthecavity.Thegatehasthefollowingfunction:restrictstheflowandthedirectionofmoltenplastic;simplifiescuttingofarunnerandmoldingstosimplifyfinishingofparts;quicklycoolsandsolidifiestoavoidbackflowaftermoltenplastichasfilledupinthecavity.4.4ColdslugwellThepurposeofthecoldslugwell,shownoppositethesprue,istheoreticallytoreceivethematerialthathaschilledatthefrontofnozzleduringthecoolingandejectionphase.Perhapsofgreaterimportanceisthefactthatitprovidespositionmeanswherebythespruebushforejectionpurposes.Thesprue,therunnerandthegatewillbediscardedafterapartiscomplete.However,therunnerandthegateareimportantitemsthataffectthequalityorthecostofparts.5.EjectionAmoldingisformedinmouldbyinjectingaplasticmelt,underpressure,intoanimpressionviaafeedsystem.Itmustthereforeberemovedmanually.Furthermore,allthermoplasticmaterialscontractastheysolidify,whichmeansthatthemoldingwillshrinkontothecorewhichformsit.Thisshrinkagemakesthemoldingdifficulttoremove.Facilitiesareprovidedontheinjectionmachineforautomaticactuationofanejectorsystem,andthisissituatedbehindthemovingplaten.Becauseofthis.Themouldsejectorsystemwillbemosteffectivelyoperatedifplacedinthemorninghalfofthemould,i.e.Thehalfattachedtothemovingplaten.Wehavestatedpreviouslythatweneedtoejectthe,molding,fromthescoreanditthereforefollowsthatthecore,too,willmostsatisfactorilybelocatedinthemovinghalf.Theejectorsysteminamouldwillbediscussedunderthreeheadings,namely:(i)theejectorgird;(ii)theejectorplateassembly;and(iii)themethodofejection.5.1EjectorgirdTheejectorgirdisthatpartofthemouldwhichsupportsthemouldplateandprovidesaspaceintowhichtheejectorplateassemblycanbefittedandoperated.Thegirdnormallyconsistsofabackplateontowhichismountedanumberofconvenientlyshaped“supportblocks”.Theejectorplateassemblyisthatpartofthemouldtowhichtheejectorelementisattached.Theassemblyconsistsofanejectorplate,aretainingplateandanejectorrod.Oneendofthislettermembe
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026年初級(jí)經(jīng)濟(jì)師之初級(jí)經(jīng)濟(jì)師基礎(chǔ)知識(shí)考試題庫(kù)300道完整答案
- 2026年教師招聘之中學(xué)教師招聘考試題庫(kù)附答案【培優(yōu)b卷】
- 2026年注冊(cè)土木工程師考試題庫(kù)500道及答案(考點(diǎn)梳理)
- 2026年國(guó)家電網(wǎng)招聘之電網(wǎng)計(jì)算機(jī)考試題庫(kù)500道帶答案(培優(yōu)a卷)
- 2026年咨詢工程師之宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃考試題庫(kù)500道含完整答案(全優(yōu))
- 2026年國(guó)家電網(wǎng)招聘之文學(xué)哲學(xué)類考試題庫(kù)300道及答案【全優(yōu)】
- 2026年一級(jí)造價(jià)師之建設(shè)工程造價(jià)管理考試題庫(kù)500道帶答案(完整版)
- 2026年公安機(jī)關(guān)理論考試題庫(kù)300道附答案(輕巧奪冠)
- 2026年國(guó)家電網(wǎng)招聘之人力資源類考試題庫(kù)300道及完整答案(網(wǎng)校專用)
- 2026年國(guó)家電網(wǎng)招聘之電網(wǎng)計(jì)算機(jī)考試題庫(kù)500道及參考答案一套
- 2025年蘇州市吳中區(qū)保安員考試真題附答案解析
- 底料采購(gòu)協(xié)議書(shū)
- (2025年)初級(jí)電工證考試試題附答案
- 星巴克門店運(yùn)營(yíng)管理標(biāo)準(zhǔn)流程手冊(cè)
- 2025山西大地環(huán)境投資控股有限公司社會(huì)招聘116人參考筆試題庫(kù)及答案解析
- 2025版32375電石生產(chǎn)安全技術(shù)規(guī)范
- 供熱管網(wǎng)施工技術(shù)規(guī)范
- 提高約束帶使用規(guī)范率
- 阿扎胞苷課件
- 沈陽(yáng)市行道樹(shù)栽植現(xiàn)狀分析與發(fā)展對(duì)策
- 建筑工程智能防火系統(tǒng)設(shè)計(jì)與應(yīng)用考核試卷
評(píng)論
0/150
提交評(píng)論