《建筑工程專業(yè)英語》教學(xué)資源包期末試卷及答案期末試卷(B)_第1頁
《建筑工程專業(yè)英語》教學(xué)資源包期末試卷及答案期末試卷(B)_第2頁
《建筑工程專業(yè)英語》教學(xué)資源包期末試卷及答案期末試卷(B)_第3頁
《建筑工程專業(yè)英語》教學(xué)資源包期末試卷及答案期末試卷(B)_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、題號一二三四總分得分建筑工程專業(yè)英語期末試卷 B()9.construction organizationi.安裝工程()10. intelligent buildingj.建筑設(shè)備Match the English in Column A withColumn B (每題2分,共20分)Column A()1.installation engineeringtheir Chinese equivalents inColumn Ba.成本控制()2. project budgetb.工程管理()3.waterproofing works()4.cost control()5. project

2、supervision()6. building structure()7.construction management()8. building equipmentc.建筑結(jié)構(gòu)d.施工組織設(shè)計(jì)e.智能建筑f.防水工程g.項(xiàng)目預(yù)算h.工程管理II Translate the following sentences.(每題 5分,共 50分)Quality control in constructiontypically involves insuring compliancewith minimum standards of material and workmanship in order

3、 to insure the performance of the facility according to the design.Several naturally occurring materials, such as clsyones, mud and wood, leaves and so o nhave already been used to build houses.Green building materials are composed of renew aiblther than nonrenewable resources.There are a lot of dif

4、ferent professionals to participate in the construction of a big project. Therefore how to organize the construction is the key to solving the third stage this is a very important system engineering.Electrical wiring in general refers to insulated conductors used to carry electricity and associated

5、devicesThe i-Home Enabler integrates your Microsott Windows Vista MediaCenter Edition (MCE) with your TV seamlessly, enables you to enjoy yourself with some exciting movies, TV programs or comfortable music through the easy-to-follow on-screen-display (OSD) menu on TV screen interface.第1頁,共2頁 These

6、allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.Project budget is a prediction of the costs associated with a particular company project. These costs include labor, materials, and other related expenses.The first interior power wiring system

7、s used conductors that were bare or covered with cloth tape, which were secured by staples to the framing of the building or on running boards.Tendering and bidding is an international practice and the product- of highly developed commodity economy, which applies to technical and economical method a

8、s well as the competition of market economy, organizes to carry out a best selection to deal.III Translate the following paragraphs into Chinese.(每小題 15 分, 共30分)If a material with high strength in tens icsuch as ste elis placed in concrete then the composite materiateinforced concreteresists compres

9、sion bending and other direct tensile actions. A reinforced concrete section where the concrete resists the compression and steel resists the tension can be made into almost any shape and size for the construction industry.第2頁,共2頁The contractor s chief executive must be the organization terms s of safety, first by issuing a policy statement that conveys the idea that safety is the workplace s highest priority, states who has authority and accountability f providing a safe work environment and requires

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論