版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、頂管法施工方案(英文版)頂管法施工方案(英文版)頂管法施工方案(英文版)V:1.0精細整理,僅供參考 頂管法施工方案(英文版)日期:20 xx年X月 Method Statement for Pipe JackingConstruction of PitsThe jacking pit with a dimension of 6mx5 clear opening with depth of 250mm below invert level of the steel pipe.The floor will be leveled by 100mm thick concrete blinding f
2、ixing tow I beams in the center of the pit for fixing jacking frame.Installation of Jacking FrameAfter the construction of drive, the jacking rig will be lowered into the pit and adjust to the control line and level. The rig will be used on this contract consist of two number of hydraulic cylinders
3、with a capacity of 150 ton each to give a total jacking force of 300 tons. The rig will have guided rails, pushing plate and base plate to hydraulic power back with control unit. The hydraulic system will run through a diesel engine installed the top of the pit.The rig will installed to the correct
4、line and level and check by the consultant in respect to level and alignment.Thrust WallConstructing a concrete block behind the base plate of the rig to a dimension of will be provided to take and distribute the jacking load.Pipe Jacking OperationA steel shield is used at the front of the pipe to a
5、ccommodate the miner and to allow for steering of the pipe jack. The soil within the shield is manually excavated and loaded into a wheel skip for transport to the pit bottom. The miner does not dig outside the shield (both in front and radically) and the front, or cutting edge, of the shield is alw
6、ays kept buried in the face, so stability is maintained. The shield is thus used to trim the excavation to the size of the pipe thus minimizing the potential for settlement of the ground above the pipe jack.In the pit bottom, the skip is hoisted to the surface, emptied and returned to the used to lo
7、osen it prior to digging. The exact diameter of shield will be selected to suit the pushing pipes.As excavation continues, the shield is jacking forward using two hydraulic jacks thrusting from the back wall. When the shield is buried, the jacks are retracted and the first sleeve pipe lowered on to
8、the rails. This in then pushed up to the shield and excavation can then continue.When the sleeve pipe is pushed home, the hydraulic jacks are retracted and the services (lighting& ventilation) disconnected. The next sleeve pipe is lowered on to the rails and the services reconnected and the cycle re
9、peated until the shield is pushed into the receiving pit and the pipeline pushed into final position.Maintaining Line and LevelIn order to maintain the correct line and level, a graduated target plate is located within the shield. The site engineer notes the position of the visible sport on the targ
10、et, this initial position is used as reference value to locate the relative position of the shield at all times during the drive. At each push, the site engineer monitors the position reference value with the help of level instrument and theodalite, thus giving a shield position (high or low, right
11、or left) relative to the design position. Based on this information, the operator manipulates a correct course.Extending or retracting a combination of steering rams causing the front of the shield to articulate in the required direction carries out the steering. As the pipe follows the shield, the
12、correct line and level will be maintained. At all times, the amount steering applied is kept to minimum.Fixing Carrier PipesAfter completion of the pipe jacking , we check the line and level for the steel pipe and we take the exact line and level for the carrier pipe with the help of survey instrume
13、nts.A 3 steel angle bar fixed by welding in the correct bottom level of the carrier pipe, then 3mm thick flat bar half moon claps will fixed through wielding in the correct line after that we put neoprene rubber 3mm thick in the clamp to avoid the scratches of the carrier pipes.Then we start laying
14、the carrier pipe one by one and fix the clamps through nuts and bolts. After fixing the nuts and bolts we make angle support in between the top of the clamp and top of the pipe. Then we fix the other pipe in the same manner. The same procedure will continues up to the requirement.GroutingUpon comple
15、tion of pipe jacking we make 4 2 holes like ventilation in every meter, it helps the concrete fill the gap between the steel pipe and ground. Then we fixed six inch grouting pipe vertically one meter height in the top of the pipe both end jacking and receiving. One side will keep ventilation and the
16、 other side for connection and the concrete pump.After that we lay the carrier pipe in the correct line and level then check with the consultant and make the test required from the consultant then we close the both end between steel and carrier pipe by m/s plate welding or masonry, the gap between steel sleeve and ground in the both end we c
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026年江西單招語文應用文寫作專項含答案通知啟事求職信經典題
- 2026年廈門社會考生單招文化素質補基礎專用試卷含答案
- 2026年廈門單招學前教育專業(yè)技能面試實操配套試題含答案
- 2026年河南單招醫(yī)藥衛(wèi)生類省卷模擬卷含答案文化技能
- 物業(yè)防汛應急
- 2026年山東單招財經商貿類中職生專業(yè)基礎必刷題含答案
- 2026年深圳單招補錄文化素質沖刺卷含答案基礎提升雙模塊
- 游樂場消防安全監(jiān)管
- 2026年重慶單招電子信息類信息技術專項模擬題含答案辦公軟件網絡應用
- 2026廣東清遠市英德市兵役登記(圖文版)考試參考題庫及答案解析
- 一級建造師考試機電工程管理與實務試卷及答案(2025年)
- 2026年濰坊護理職業(yè)學院單招職業(yè)傾向性考試必刷測試卷及答案1套
- 醫(yī)保政策學習課件
- 雨課堂學堂在線學堂云《科學研究方法與論文寫作(復大)》單元測試考核答案
- 2025浙江省自由貿易發(fā)展中心招聘工作人員5人(第二批)參考筆試試題及答案解析
- 老公情人簽約協議書
- 4、藍恒達QC小組活動基礎知識與實務培訓課件
- 小學六年級科學上冊2025年期末檢測卷(含答案)
- 現場清潔度培訓課件
- 豪華轉馬應急預案
- 2025年信用報告征信報告詳版?zhèn)€人版模板樣板(可編輯)
評論
0/150
提交評論