塑膠地板施工工藝流程

PlasticFlooringBeforeConstructionPreparationRequirements:1.SurfaceMoisture:Themoistureofthesurfaceshouldbebelow4.5%,andthegroundshouldbedriedfor14-28daysbeforeflooringconstruction.2.SurfaceHardness:Useasharpchiseltoquicklycross-cutthesurface,andthereshouldbenocracksattheintersections.3.SurfaceFlatness:Usea2-meterstraightedgeandawedgetochecktheflatness,andtheallowabledeviationofthesurfaceflatnessis≤3mm.4.SurfaceDensity:Thesurfaceshouldnotbetooroughorhavetoomanypores.Forslightlysandysurfaces,surfacehardeningtreatmentshouldbecarriedout.5.SurfaceCracks:Thereshouldbenocrackswiderthan3mm,andthesurfacelayershouldnothavehollows.6.SurfaceCleanliness:Residualsubstancessuchasoil,wax,paint,andpigmentmustberemoved.7.SurfaceTemperature:Theon-siteairtemperatureshouldbeabove18degreesCelsius,andthesurfacetemperatureshouldbeabove15degreesCelsius.ConstructionStepsforSelf-Leveling:1.FloorTreatment:Useashovelandavacuumcleanertoremovesmalllumps,dust,debris,andresidualmaterialsfromthepreviousconstructionontheground.Check,clean,andrepairsmallareasofloose,hollow,cracked,raised,andsunkenpartsofthesurface.2.AccurateMeasurementoftheFloor:Useafloordetectortodetecttheunevennessofany2-meterrangeonthefloortobeconstructed.Ifthethicknessoftheself-levelingconstructionis2mm,theunevennessofthefloorcannotbegreaterthan3mm.Ifitisgreaterthan3mm,agrindingmachineshouldbeusedforprocessing.3.ApplyPrimer:Rolltheprimeroneverypartofthefloor,anddonotmissanyareas.4.Self-LevelingBaseMud:Pourwaterintothemixingbucketaccordingtotheproportion,andthenpourintheself-levelingcement.Mixevenlywithanelectricdrillandamixer.5.OfficialConstruction:Pourtheself-levelinginbatchesontothefloor,useaspecialscrapertoscrapeitevenly,anduseaventingrollertoventit.6.FineProcessing:After24hoursofself-levelingdrying,useasandingmachinetopolishandtrimthesurface,removesmallparticlesonthesurface,andmaketheself-levelingsurfacemoreflatandsmooth.ConstructionStepsforMaterial:1.ConfirmationofConstructionMaterialsandDirection:Theconstructionmaterialsshouldbeofthesamebatchnumber,andthematerialsshouldbeadaptedtotheroomtemperature(absorptionoperation).2.BenchmarkConstruction:Itisbesttostartconstructionfromtheentranceoftheroomtoavoidtheflooringbeingsplicedatthedoorway.Theconstructionmaterialshouldbecut5cmlongerthantheactuallengthandlaidontheground.Whencutting,thematerialshouldbeadaptedtotheroomtemperature(adsorptionoperation).Forpatternedcolors,trytoalignthepatternsduringconstruction.Thematerialscoveringthewallsandcornersshouldbepressedfirmlybyhand("V"shape)andcutaccordingtothecurveofthewall(witha5cmmargin).Whencutting,leaveacertaindistancefromthewallandconnectittothekickline.Whencuttingthesecondfloorboard,consideraligningitwiththefirstfloorboard'spattern(asmuchaspossibleforthefloorboardthatneedspatternalignment).Whencuttingthesecondfloorboard,placeitonthefirstone,andmarkthemiddleandbothendswitha"V.Scraper"pattern,leavingapartforconstructionatbothendsofthefloorboardandthewall.Forlarge-scaleconstruction,thesamestepscanalsobeused.3.GlueCoating:Usegluethatmatchestheselectedflooring.Waitforacertainperiodbeforegluingthefloortoreducethemoisturecontentoftheadhesiveandincreasethebondingstrength.Thewaitingtimedependsonthesurroundingenvironment,time,andgroundconditions.該產(chǎn)品需要使用配套的黏合劑、刮板和全面涂布,將連接部和墻角充分涂抹,以避免地板移動(dòng)或翹起等現(xiàn)象。對(duì)裁剪過(guò)的地板進(jìn)行涂抹后,進(jìn)行地板鋪設(shè)和壓緊。等待黏合劑涂抹完成后,將地板輕輕放置,并用滾輪壓緊地板連接處,從中間到墻角和連接部移動(dòng)。連接處處理是施工中最重要的部分之一,使用施工刀將連接處兩張地板切掉。在施工結(jié)束24小時(shí)后,進(jìn)行地板清掃,可以使用吸塵器,但禁止使用抹布清掃。如果黏合劑痕跡或其他異物粘在表面上,應(yīng)使用抹布粘上

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論