1、Company ABC Copy Exact Training,What is Copy Exact?,“Copy Exact” is the system developed by Intel in which: A single plant develops the methods and processes for making a certain type of chip. That plant perfects those methods and processes, with high output and minimal lost effort. Those exact meth
2、ods and processes are then replicated in plants around the world. Intel maintains high quality while producing chips in huge volumes. “Copy Exact” is important because Intel handled via Applied approval (SPS and/or ECO). That is there is no change for FFF changes. Process changes are effected by the
3、 revised criteria. The differences are shown on the next few slides. Remember: The rules vary depending on whether Applied defines the part as critical or non-critical. If you are unsure whether or not the product is defined critical, check with your local Product Manager, Applied Sales Account Team
4、 representative or directly on the web site.,Changes Not Requiring Approval,The following types of changes do not require any Approval or Notification to Applied; not even on critical parts: CNC Program Changes (assuming no impact to FFF). Process Improvement Changes (e.g. combining Ops). Change of
5、Material Manufacturer (assuming no material specification changes). Test Fixture and/or Test Software Changes (assuming no impact to FFF). When the types of changes listed above are required, Company ABC can make these changes in accordance with existing internal Company ABC ECO procedures and appro
6、vals.,Machine/Jig/Fixture Changes,Changes to the above items that affect form, fit or function of our product require Applied approval. Remember - Implementation of this change must await customer approval. Changes to the above items that do NOT affect form, fit or function of our product require on
7、ly notification to Applied. Implementation of this change may proceed at Company ABC schedule.,Change of Special Process Supplier,Special Process suppliers provide unique services - like welding, brazing, plating, cleaning, painting, non-destructive testing, etc. Change of Special Process Supplier R
8、equires customer notification when: The “Special Process” is specified on the Applied drawing and/or specification either: By unique supplier name or By reference to the Applied “Special Process Supplier” List. Implementation of this change may proceed at Company ABC schedule. If a process shown abo
9、ve is specified only on an Company ABC drawing (i.e. there is no Applied drawing/spec involved), then notification to Applied is not required.,Change of Sub-Tier Supplier,Change of “sub-tier supplier” is defined as: An entirely “new” AVL add. Note: Moves between previously approved suppliers (i.e. t
10、hose suppliers that already on the AVL and have proven capability) are not considered “changes”. Changes to a component are handled as follows: Functional component changes require some communication to Applied. Non-functional components (e.g. labels, packaging material, hardware, etc.) require no s
11、pecial action unless these items are explicitly specified by the customer in a drawing and/or specification. Action Conditions: If the “change of supplier” is between two previously approved suppliers (for the same commodity), then no action is required. For a “Non-Critical” product, if a totally ne
12、w supplier is added to the existing AVL listing, then an SNF notification to Applied is required. For a “Critical” product, if a totally new supplier is added to the existing AVL listing, then Applied approval is required prior to making the change.,Location change is defined as either: Moving the m
13、anufacture of a product from one Company ABC facility to another. Moving the manufacture of a product from an Company ABC facility to an external supplier. Location change is not defined as: Moving the manufacture of a product from one area of an Company ABC facility to another - within the same fac
14、ility. “Lift Out” move see later slide. When moving the manufacture of an end-item product family, you must get Applied approval (using the SNF form) prior to changing the location . Approval allows Company ABC to move any remaining family members with notification only - at Company ABC schedule. Wh
15、en moving the manufacture of a sub-assembly (e.g. a PC Assy.) you must contact the customer. Proceed using rules for “sub-tier” supplier changes (see previous slide).,Company ABC Location Change Policy,Location change approval is done on a “product family” basis. See following page for examples of C
16、ompany ABC product families. Company ABC Actions: Develop a list of product family “members”. Identify a specific model as the “parent” product which is the one that best represents the features/functions of that product group. Petition Applied (via SNF) to approve the move of the parent product to
17、the new location. The remaining members of the family must be documented and submitted to Applied (at the time of the initial SNF submittal). To expand the list of family members, submit another SNF. After approval of the “parent”, moves of remaining family members requires an SNF (notification only
18、) to Applied when production of the product is moving to the new location. NOTE: If a Product Qualification Plan (PQP) for the product family exists (customer input may be required to confirm), review and/or update may be required.,Company ABC Location Change Actions,A “Lift Out” change is defined a
19、s: The relocation of the same people, processes, material, documentation, equipment, etc. to a new site. The new location could be another Company ABC site or a completely different 3rd party facility. Since the key elements of the production and the quality processes are no different, this kind of
20、move is not considered a change in processing the product. When “l(fā)ifting out” the manufacture of an end-item product (or product family), you must notify Applied - using the SNF form - prior to changing the location .,Company ABC “Lift Out” Change,Applied Change Control Summary,Follow-On Requirement
21、s,Employee Requirements,All key employees must know these “Copy Exact” requirements. Key employees include: All managers & supervisors (except Finance, IT, HR or Administration), all purchasing, all quality, all development personnel (engineers, designers, product management) and all manufacturing e
22、ngineering personnel. All key employees must complete the training within the prescribed period. By either: Classroom training or. Automated training Everyone who completes the training must pass a test to assure (certify) comprehension of these requirements. All key employees must retrain & recerti
23、fy annually to ensure awareness and learning of any policy changes since prior certification.,Company ABC Requirements,All new “key” employees will complete training & certification upon arrival at Company ABC to ensure awareness and learn this critical policy. This process is the responsibility of the area Supervisor (facilitated by HR) and is done at the time of hire. Company ABC may randomly audit: The internal
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 生物標(biāo)志物與藥物不良反應(yīng)預(yù)測(cè)模型
- 生物墨水的生物安全性評(píng)價(jià)方法
- 生活質(zhì)量評(píng)估在再程放療方案選擇中的作用
- 電子商務(wù)專家認(rèn)證考試內(nèi)容解析
- 產(chǎn)品經(jīng)理面試題及產(chǎn)品思維訓(xùn)練
- 深度解析(2026)《GBT 19496-2004鉆芯檢測(cè)離心高強(qiáng)混凝土抗壓強(qiáng)度試驗(yàn)方法》
- 保潔綠化領(lǐng)班工作創(chuàng)新與問題解決方法含答案
- 電子工程師技術(shù)支持崗位的常見問題與答案
- 信息錄入員崗位面試題及答案
- 環(huán)境噪聲污染的統(tǒng)計(jì)心血管效應(yīng)與結(jié)果防護(hù)策略
- 2025年廣西繼續(xù)教育公需科目考試試題和答案
- 俄烏之戰(zhàn)課件
- 2026年鐵嶺衛(wèi)生職業(yè)學(xué)院?jiǎn)握新殬I(yè)傾向性考試題庫(kù)及參考答案詳解一套
- 2025年廚房燃?xì)鈭?bào)警器安裝合同
- 環(huán)孢素的臨床應(yīng)用
- 國(guó)開電大《11837行政法與行政訴訟法》期末答題庫(kù)(機(jī)考字紙考)排序版 - 稻殼閱讀器2025年12月13日12時(shí)58分54秒
- 2025河北廊坊市工會(huì)社會(huì)工作公開招聘崗位服務(wù)人員19名考試筆試備考試題及答案解析
- 2025國(guó)家電投集團(tuán)中國(guó)重燃招聘18人筆試歷年參考題庫(kù)附帶答案詳解
- 框架日常維修協(xié)議書
- 智研咨詢發(fā)布-2025年中國(guó)電子變壓器件行業(yè)市場(chǎng)運(yùn)行態(tài)勢(shì)及發(fā)展趨勢(shì)預(yù)測(cè)報(bào)告
- 創(chuàng)傷后成長(zhǎng)(PTG)視角下敘事護(hù)理技術(shù)的臨床應(yīng)用
評(píng)論
0/150
提交評(píng)論