水利樞紐土建工程施工組織設(shè)計(jì)方案范本_第1頁(yè)
水利樞紐土建工程施工組織設(shè)計(jì)方案范本_第2頁(yè)
水利樞紐土建工程施工組織設(shè)計(jì)方案范本_第3頁(yè)
水利樞紐土建工程施工組織設(shè)計(jì)方案范本_第4頁(yè)
水利樞紐土建工程施工組織設(shè)計(jì)方案范本_第5頁(yè)
已閱讀5頁(yè),還剩174頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、目 錄 TOC o 1-2 h z t 標(biāo)題 3,2 HYPERLINK l _Toc70004608 第一章 工程概況 PAGEREF _Toc70004608 h 6 HYPERLINK l _Toc70004609 1.1 工程概況 PAGEREF _Toc70004609 h 6 HYPERLINK l _Toc70004610 1.2 水文氣象和工程地質(zhì) PAGEREF _Toc70004610 h 8 HYPERLINK l _Toc70004611 1.3 對(duì)外交通條件 PAGEREF _Toc70004611 h 23 HYPERLINK l _Toc70004612 第二章

2、施工總平面布置 PAGEREF _Toc70004612 h 24 HYPERLINK l _Toc70004613 2.1 施工總平面布置原則 PAGEREF _Toc70004613 h 24 HYPERLINK l _Toc70004614 2.2 風(fēng)水電及通訊系統(tǒng) PAGEREF _Toc70004614 h 24 HYPERLINK l _Toc70004615 2.3 場(chǎng)內(nèi)施工道路 PAGEREF _Toc70004615 h 26 HYPERLINK l _Toc70004616 2.4 砂石料系統(tǒng) PAGEREF _Toc70004616 h 26 HYPERLINK l _T

3、oc70004617 2.5 砼系統(tǒng) PAGEREF _Toc70004617 h 28 HYPERLINK l _Toc70004618 2.6 其它臨建系統(tǒng)布置 PAGEREF _Toc70004618 h 30 HYPERLINK l _Toc70004619 第三章 施工導(dǎo)流 PAGEREF _Toc70004619 h 33 HYPERLINK l _Toc70004620 3.1 導(dǎo)流標(biāo)準(zhǔn)和設(shè)計(jì)流量 PAGEREF _Toc70004620 h 33 HYPERLINK l _Toc70004621 3.2 導(dǎo)流方式及導(dǎo)流方案 PAGEREF _Toc70004621 h 33 H

4、YPERLINK l _Toc70004622 3.3 導(dǎo)流建筑物設(shè)計(jì) PAGEREF _Toc70004622 h 34 HYPERLINK l _Toc70004623 3.4 導(dǎo)流建筑物施工 PAGEREF _Toc70004623 h 37 HYPERLINK l _Toc70004624 3.5 截流 PAGEREF _Toc70004624 h 38 HYPERLINK l _Toc70004625 3.6 基坑排水 PAGEREF _Toc70004625 h 39 HYPERLINK l _Toc70004626 3.7 圍堰拆除 PAGEREF _Toc70004626 h

5、40 HYPERLINK l _Toc70004627 3.8 臨時(shí)渡汛與安全 PAGEREF _Toc70004627 h 40 HYPERLINK l _Toc70004628 第四章 壩基及廠基開(kāi)挖施工 PAGEREF _Toc70004628 h 42 HYPERLINK l _Toc70004629 4.1 概況 PAGEREF _Toc70004629 h 42 HYPERLINK l _Toc70004630 4.2 施工布置 PAGEREF _Toc70004630 h 42 HYPERLINK l _Toc70004631 4.3 施工布署 PAGEREF _Toc70004

6、631 h 43 HYPERLINK l _Toc70004632 4.4 施工程序、施工方法 PAGEREF _Toc70004632 h 43 HYPERLINK l _Toc70004633 4.5 施工進(jìn)度 PAGEREF _Toc70004633 h 49 HYPERLINK l _Toc70004634 4.6 主要施工機(jī)械設(shè)備 PAGEREF _Toc70004634 h 50 HYPERLINK l _Toc70004635 第五章 擋水壩、溢流壩及廠房混凝土澆筑施工 PAGEREF _Toc70004635 h 51 HYPERLINK l _Toc70004636 5.1

7、概況 PAGEREF _Toc70004636 h 51 HYPERLINK l _Toc70004637 5.2 施工布署 PAGEREF _Toc70004637 h 51 HYPERLINK l _Toc70004638 5.3 施工布置 PAGEREF _Toc70004638 h 52 HYPERLINK l _Toc70004639 5.4 施工程序、施工方法 PAGEREF _Toc70004639 h 52 HYPERLINK l _Toc70004640 5.4.1 基礎(chǔ)處理 PAGEREF _Toc70004640 h 52 HYPERLINK l _Toc70004641

8、 5.4.2 砼施工 PAGEREF _Toc70004641 h 53 HYPERLINK l _Toc70004642 5.4.3 預(yù)制砼制作與安裝 PAGEREF _Toc70004642 h 57 HYPERLINK l _Toc70004643 5.4.4 預(yù)應(yīng)力砼軌道梁的施工 PAGEREF _Toc70004643 h 58 HYPERLINK l _Toc70004644 5.5 施工進(jìn)度 PAGEREF _Toc70004644 h 61 HYPERLINK l _Toc70004645 5.6 主要施工機(jī)械設(shè)備 PAGEREF _Toc70004645 h 61 HYPER

9、LINK l _Toc70004646 第六章 砌體工程施工 PAGEREF _Toc70004646 h 62 HYPERLINK l _Toc70004647 6.1 概況 PAGEREF _Toc70004647 h 62 HYPERLINK l _Toc70004648 6.2 灌砌塊石護(hù)岸(坡)施工 PAGEREF _Toc70004648 h 62 HYPERLINK l _Toc70004649 6.3 漿砌塊石護(hù)坡施工 PAGEREF _Toc70004649 h 64 HYPERLINK l _Toc70004650 第七章 金屬結(jié)構(gòu)制作與安裝 PAGEREF _Toc700

10、04650 h 66 HYPERLINK l _Toc70004651 7.1 概況 PAGEREF _Toc70004651 h 66 HYPERLINK l _Toc70004652 7.2 制作與安裝 PAGEREF _Toc70004652 h 66 HYPERLINK l _Toc70004653 第八章 灌漿工程施工 PAGEREF _Toc70004653 h 68 HYPERLINK l _Toc70004654 8.1 概況 PAGEREF _Toc70004654 h 68 HYPERLINK l _Toc70004655 8.2 施工布置 PAGEREF _Toc7000

11、4655 h 68 HYPERLINK l _Toc70004656 8.3 施工程序、施工方法 PAGEREF _Toc70004656 h 68 HYPERLINK l _Toc70004657 8.4 施工進(jìn)度 PAGEREF _Toc70004657 h 71 HYPERLINK l _Toc70004658 7.5 主要灌漿設(shè)備 PAGEREF _Toc70004658 h 71 HYPERLINK l _Toc70004659 第九章 原型觀測(cè)施工 PAGEREF _Toc70004659 h 72 HYPERLINK l _Toc70004660 9.1 概況 PAGEREF _

12、Toc70004660 h 72 HYPERLINK l _Toc70004661 9.2 組織機(jī)構(gòu)及設(shè)施 PAGEREF _Toc70004661 h 72 HYPERLINK l _Toc70004662 9.3 準(zhǔn)備工作 PAGEREF _Toc70004662 h 73 HYPERLINK l _Toc70004663 9.4 觀測(cè)、資料計(jì)算、分析 PAGEREF _Toc70004663 h 74 HYPERLINK l _Toc70004664 9.5 質(zhì)量保證措施 PAGEREF _Toc70004664 h 75 HYPERLINK l _Toc70004665 第十章 施工總

13、進(jìn)度計(jì)劃 PAGEREF _Toc70004665 h 76 HYPERLINK l _Toc70004666 10.1 編制說(shuō)明 PAGEREF _Toc70004666 h 76 HYPERLINK l _Toc70004667 10.2 工期 PAGEREF _Toc70004667 h 76 HYPERLINK l _Toc70004668 10.3 控制性進(jìn)度 PAGEREF _Toc70004668 h 76 HYPERLINK l _Toc70004669 10.4 工期保證措施 PAGEREF _Toc70004669 h 78 HYPERLINK l _Toc70004670

14、 第十一章 質(zhì)量目標(biāo)、質(zhì)量保證體系及技術(shù)組織措施 PAGEREF _Toc70004670 h 81 HYPERLINK l _Toc70004671 11.1 質(zhì)量目標(biāo) PAGEREF _Toc70004671 h 81 HYPERLINK l _Toc70004672 11.2 質(zhì)量保證體系 PAGEREF _Toc70004672 h 81 HYPERLINK l _Toc70004673 11.3 技術(shù)組織措施 PAGEREF _Toc70004673 h 83 HYPERLINK l _Toc70004674 11.4 工程質(zhì)量技術(shù)保證措施 PAGEREF _Toc70004674

15、h 86 HYPERLINK l _Toc70004675 第十二章 安全目標(biāo)、安全保證體系及技術(shù)組織措施 PAGEREF _Toc70004675 h 98 HYPERLINK l _Toc70004676 12.1 確定安全管理目標(biāo)和安全防范要點(diǎn) PAGEREF _Toc70004676 h 98 HYPERLINK l _Toc70004677 12.2 安全保證體系 PAGEREF _Toc70004677 h 98 HYPERLINK l _Toc70004678 12.3 技術(shù)組織措施 PAGEREF _Toc70004678 h 100 HYPERLINK l _Toc70004

16、679 12.4 技術(shù)保證措施 PAGEREF _Toc70004679 h 101 HYPERLINK l _Toc70004680 第十三章 文明施工及環(huán)境保護(hù)措施 PAGEREF _Toc70004680 h 106 HYPERLINK l _Toc70004681 13.1 文明施工措施 PAGEREF _Toc70004681 h 106 HYPERLINK l _Toc70004682 13.2 施工期環(huán)境保護(hù)措施 PAGEREF _Toc70004682 h 108 HYPERLINK l _Toc70004683 第十四章 特殊天氣施工保證措施 PAGEREF _Toc7000

17、4683 h 117 HYPERLINK l _Toc70004684 14.1 雨季施工保證措施 PAGEREF _Toc70004684 h 117 HYPERLINK l _Toc70004685 14.2 高溫天氣施工保證措施 PAGEREF _Toc70004685 h 117 HYPERLINK l _Toc70004686 14.3 低溫天氣施工保證措施 PAGEREF _Toc70004686 h 118 HYPERLINK l _Toc70004687 第十五章 計(jì)量管理 PAGEREF _Toc70004687 h 119 HYPERLINK l _Toc70004688

18、15.1 組織機(jī)構(gòu) PAGEREF _Toc70004688 h 119 HYPERLINK l _Toc70004689 15.2 建立項(xiàng)目計(jì)量管理制度 PAGEREF _Toc70004689 h 120 HYPERLINK l _Toc70004690 第十六章 施工組織 PAGEREF _Toc70004690 h 122 HYPERLINK l _Toc70004691 16.1 施工組織機(jī)構(gòu) PAGEREF _Toc70004691 h 122 HYPERLINK l _Toc70004692 15.2 擬投入施工設(shè)備 PAGEREF _Toc70004692 h 125 HYPE

19、RLINK l _Toc70004693 15.3 擬投入主要人員及勞動(dòng)力計(jì)劃 PAGEREF _Toc70004693 h 127第一章 工程概況1.1 工程概況江水利樞紐工程位于江干流中游河段,壩址在浙江省桐廬縣鎮(zhèn)上游2.5km的五里亭,距桐廬縣城約37km,距杭州市約105km。江水利樞紐屬等大(2)型工程,工程任務(wù)是以防洪為主,結(jié)合發(fā)電,兼顧灌溉、供水和旅游等綜合開(kāi)發(fā)利用。江位于浙江省西北部,是錢塘江下游左岸的最大支流,屬山溪性河流,洪水暴漲暴落。主流上游稱昌化江,與支流天目溪匯合后稱江。壩址以上集水面積2630km2,主流長(zhǎng)122.7km。水庫(kù)總庫(kù)容19260萬(wàn)m3,電站裝機(jī)容量21

20、5MW,多年平均發(fā)電量6837萬(wàn)kw.h.壩址以上建有中型水庫(kù)2座。一為天目溪支流六都溪上的英公水庫(kù),集水面積81.3km2,總庫(kù)容3210萬(wàn)m3;二為昌化溪上的青山殿水利樞紐,壩址以上集水面積1420km2,總庫(kù)容5600萬(wàn)m3,防洪庫(kù)容890萬(wàn)m3,水電站裝機(jī)容量為40MW,于1998年1月開(kāi)始蓄水,同年6月投產(chǎn)發(fā)電。樞紐采用河床式電站布置型式,主要建筑物包括攔河壩、泄洪閘、發(fā)電廠及升壓站等。(1)攔河壩、泄洪閘:攔河壩采用混凝土重力壩,壩頂高程52.2m,攔河壩壩頂長(zhǎng)度268.5m,壩頂寬度9.0m。溢流壩段長(zhǎng)138.0m,最大壩高34.7m,壩基寬度33.0m;兩岸非溢流壩段長(zhǎng)76.0

21、m,上游面鉛直,下游壩坡1:0.7;電站廠房壩段長(zhǎng)54.5m。壩體采用C15混凝土,溢流面為C25混凝土,上游面為C20混凝土,壩體橫縫設(shè)止水。 泄洪閘布置在溢流壩段壩頂,共9孔,每孔凈寬12m,長(zhǎng)33.0m,閘墩厚3.0m。溢流堰面采用WES型實(shí)用堰型,堰頂高程35.0m。堰頂設(shè)有9扇12m16.2m的露頂式弧形鋼閘門,由液壓?jiǎn)㈤]機(jī)啟閉,9孔泄洪閘共用一扇檢修鋼閘門。下游采用戽式消力池戽流消能,戽池長(zhǎng)30.0m,池深3.5m,坎高1.5m,底板采用C30鋼筋混凝土現(xiàn)澆結(jié)構(gòu),厚2.0m。戽后接C20鋼筋混凝土護(hù)坦,長(zhǎng)30.0m,護(hù)坦末端設(shè)拋石防沖槽與河道相接。消力池和護(hù)坦兩側(cè)分別設(shè)有導(dǎo)墻,長(zhǎng)6

22、2.0m。(2)發(fā)電廠房主廠房全長(zhǎng)54.5m,主機(jī)房布置在主廠房右端,長(zhǎng)32.0m,安裝215MW燈炮貫流式水輪發(fā)電機(jī)組,機(jī)組間距14.5m,水輪發(fā)電機(jī)中心軸高程19.6m,主機(jī)房運(yùn)行層高程29.7m。裝配場(chǎng)布置在主廠房左端,長(zhǎng)22.5m,地坪高程39.6m。主廠房?jī)?nèi)安裝1臺(tái)63/20t電動(dòng)雙梁橋式起重機(jī),行車跨度15.0m。機(jī)組間及主機(jī)房段間均設(shè)有永久性伸縮縫。 副廠房長(zhǎng)19.87m,寬12.48m,布置有中控室、開(kāi)關(guān)室、電工實(shí)驗(yàn)室、通訊室、電纜層等。 升壓站地坪高程39.45m,占地面積40.0 m17.1m,內(nèi)設(shè)1臺(tái)主變壓器、110KV出線構(gòu)架及戶外配電設(shè)備。 電站進(jìn)水口進(jìn)口底高程18.

23、0m。進(jìn)水口設(shè)檢修門和攔污柵各一道,分別配有壩頂門機(jī)和清污機(jī)。進(jìn)水口前設(shè)有攔沙坎,坎頂高程33.0m。機(jī)組尾水管出口設(shè)事故檢修門,配固定式啟閉機(jī),尾水管出口底高程16.9m,經(jīng)1:5的倒坡與下游河道銜接。 樞紐施工分三期,一期圍靠左岸3孔泄洪閘、廠房段和左岸重力壩段,右岸束窄河床導(dǎo)流,汛期允許基坑過(guò)水;二期圍靠右岸6孔泄洪閘和右岸重力壩段,左岸溢流壩段缺口泄流,汛期允許基坑過(guò)水;三期圍缺口段,右岸導(dǎo)流底孔導(dǎo)流??v向圍堰一、二、三期相結(jié)合,采用砼重力式,其中心線與泄洪閘靠左岸第4個(gè)閘墩中心線重合,長(zhǎng)285m,頂寬2.53m,上部為2.53m寬的矩形,下部為9.5m或15m寬的矩形??v向圍堰頂高程

24、:上游段35.5m,與壩體結(jié)合段高程為35.5m,下游戽式消力池與護(hù)坦段為35.5m,護(hù)坦出口至縱向圍堰末端由34.0m降至33.2m??v向混凝土圍堰已于2001年11月開(kāi)工,2002年6月完成。本合同主要工程量有:砂礫石開(kāi)挖7.71萬(wàn)m3,石方開(kāi)挖13.3萬(wàn)m3,砼澆筑15.4萬(wàn)m3,固結(jié)灌漿1.02萬(wàn)m,帷幕灌漿0.32萬(wàn)m,漿(灌)砌塊石0.65萬(wàn)m3,石渣(砂礫石)回填3.41萬(wàn)m3,鋼筋制安3180t,鋼結(jié)構(gòu)制安136 t。1.2 水文氣象和工程地質(zhì)水文氣象條件江流域?qū)賮啛釒Ъ撅L(fēng)氣候區(qū),雨量豐沛,四季變化明顯。34月初春季節(jié),地面盛行東南風(fēng),多降連綿細(xì)雨。57月春末夏初,暖濕太平洋高

25、壓氣團(tuán)漸向大陸推進(jìn),鋒面常在流域上空停滯或擺動(dòng),造成連續(xù)降水,降水強(qiáng)度大且量多,俗稱梅雨。79月盛夏季節(jié),天氣炎熱,盛行偏南風(fēng),多雷陣雨和臺(tái)風(fēng)雨。1011月秋季,天氣以晴朗少雨為主。122月寒冬季節(jié),地面盛行偏北風(fēng),氣溫低,會(huì)出現(xiàn)雨雪天氣。設(shè)計(jì)流域多年平均降水量1654mm。其年內(nèi)分配不均且年際變化明顯,最豐年(1954年)2596.2mm,最枯年(1978年)1106.6mm。豐枯之比2.35倍。氣象特征值見(jiàn)表1-1.表1-1 桐廬站地面氣象特征值表項(xiàng)目份月一二三四五 六七八九十十一十二全年平 均 氣 溫( )4.35.49.916.120.924.528.828.223.417.912.1

26、6.316.5極 端 最 高 氣 溫()26.128.533.834.737.337.641.041.739.335.029.524.341.7極 端 最 低 氣 溫( )-9.4-9.5-2.7-1.28.012.417.817.210.22.0-3.7-8.7-9.5平 均 相 對(duì) 濕 度( )76787878798277788381797578.7平 均 降 水量( mm )62.499.8135.8154.4184.8212.3135.7117.7149.492.863.147.61654最大一日降水量(mm)47.363.649.392.686.1153.4109.0141.8151

27、.8143.575.445.0153.4日 降 雨 量 1 0 mm天 數(shù)1.93.44.75.46.56.44.23.84.62.82.01.63.9日 降 雨 量2 5 mm天數(shù)0.20.81.21.52.22.71.61.31.91.00.50.11.3日 降 雨 量5 0 mm天 數(shù)0000.20.30.70.30.30.40.2000.2壩址區(qū)分期洪水不同設(shè)計(jì)頻率成果見(jiàn)表1-2.(上游青山殿水庫(kù)對(duì)非汛期洪水基本無(wú)調(diào)洪作用,臺(tái)汛期、梅雨期洪水則考慮青山殿水庫(kù)的調(diào)洪作用)。表1-2 壩址分期不同頻率設(shè)計(jì)洪峰流量表 單位:m3/s時(shí) 段頻 率P=2%P=5%P=10%P=20%P=33.3

28、%非汛期 (9月1日11月30日)1070非汛期 (11月1日次年1月31日)494非汛期 (10月1日次年2月28日)20101480962非汛期 (10月1日次年3月31日)265021401610非汛期 (10月1日次年4月30日)348026302030梅雨期 (5月1日7月31日)711554224220臺(tái)風(fēng)期 (8月1日9月30日)6300486037702670水庫(kù)壩址水位流量關(guān)系、廠址(廠房尾水出口處)水位流量關(guān)系、水庫(kù)水位與庫(kù)容關(guān)系表、壩址歷年各月平均流量分別見(jiàn)表1-3、表1-4、表1-5 、表1-6。表1-3 壩址水位流量關(guān)系表水位 (m) 流量 (m3/s) 水位 (m)

29、 流量 (m3/s) 27.53235.0485028.09435.5541028.520436.0600029.035136.5663029.553337.0729030.077337.5798030.5104038.0869031.0136038.5952031.5171039.01050032.0209039.51150032.5248040.01255033.0290040.51360033.5335041.01470034.0382041.51585034.5432042.017050表1-4 廠址水位與流量關(guān)系表水位 (m)流量 (m3/s)水位 (m)流量 (m3/s)27.44

30、128.4247.527.664.828.630127.898.428.835528.0141.829.041028.2193.429.2470表1-5 水庫(kù)水位與庫(kù)容關(guān)系表水位(m)面積(萬(wàn)m2)庫(kù)容(萬(wàn)m3)水位(m)面積(萬(wàn)m2)庫(kù)容(萬(wàn)m3)3177.3519842944.0341733295.8728443108939389441236.26635434132.91513451375.68765935174.52666461510.64910236233.22869471632.441067337308.991139481755.581236638401.8

31、41494491880.051418439535.101960502005.861612740669.882562512133.01819641806.193299522261.4720393表1-6 壩址歷年各月平均流量表 單位:m3/s年份1月2月3月4月5月6月7月8月9月10月11月12月年195230.013814142.117914516058.224930.217.411.4100195317.880.011836.322.527034.822.873.791.713947.679.0195418089.757.813448952927610318.27.1810.722.716

32、0195527.258.711113394.828386.035.425.05.817.945.5372.519568.678.3916458.320912138.119620334.47.914.1488.1195738.869.379.296.3196.224.696.855.845.433.215.630.465.3195811.523.991.711418533.57.2916.278.771.817.27.5355.019598.9015248.716215720847.715.373.56.8326.531.077.1196038.315.217211919418233.32046

33、9.214.938.519.091.9196125.565.111556.610319911.073.715014421.710.481.1196217.718.229.375.010716051.311212066.429.319.567.319639.146.9015.669.020415436.553.115414.130.616.863.7196460.359.973.110860.711921.919.922.862.616.68.2852.619655.5567.463.712666.858.720.977.727.551.425.755.553.8196634.749.792.8

34、22568.491.41606.6524.14.246.9723.365.5196718.556.512613423837.729.44.652.492.8113.46.5855.819684.8415.128.779.219726.894.215.027.715.55.6533.745.5196952.055.590.864.368.694.335120711228.010.06.9695.6197011.233.215775.512916616157.319139.832.429.890.4197121.043.175.491.687.927211.913.41091108.527.157

35、0.619726.5012042.041.377.737.317.719528.591.781.527.263.8197348.121212416533527865.713.824534.67.473.4112619747.7344.542.075.096.676.022712110.624.937.852.468.3197531.611961.510912512199.015876.912078.578.098.0197614.627.312810611912370.117.043.423.622.618.759.4197754.353.541.217128228969.049.723624

36、.713.112.9108197832.849.549.297.092.954.429.18.6217.110.58.517.0637.9197911.918.048.310581.862.664.656.380.510.95.615.7346.019807.7412.917990.164.317714930775.631.512.68.9893.5198113.741.912311347.334.817310310512018825.990.8198215.669.213170.744.510711568.926.714.472.528.463.6198317.615.445.0175262

37、40829718.238.715922.012.1123198417.485.810112762.033412857.312526.119.517.791.1198522.878.320441.665.810795.275.611339.949.322.776.2198612.522.957.016768.212888.132.079.246.724.711.561.4198722.328.518117278.680.219393.271.633.860.916.486.3198811.195.813542.596.119119.192.974.113.53.971.7864.4198929.

38、459.769.313420912218159.014222.319.311.688.3199027.810480.210711314767.829.218532.476.319.381.7199157.665.114419415219522032.358.711.48.277.4895.5199214.219.819959.369.487.510441.911616.710.110.762.6199345.630.911353.913115023822033.730.254.827.294.7199424.084.864.484.534.536816.837.020.518.28.5541.

39、466.1199558.633.977.914915335815712.98.8246.65.303.8988.7199612.711.016784.625.140645546.625.626.414.79.2110719977.3225.727.539.035.921.823517234.214.671.673.763.8199813511015912311118598.939.828.527.07.729.5886.1多年 平均29.458.498.910413016611574.682.440.531.220.579.3(2)工程地質(zhì)地形一貌壩址位于鎮(zhèn)以北2.5km的江干流峽谷段上,河流

40、流向自北向南,橫切巖層走向,河谷呈寬“U”字形,五里亭以上和吳家山以下河谷呈喇叭形逐漸擴(kuò)大。壩址區(qū)河床高程25-28m,寬約170-190m;河床左岸為漫灘和級(jí)階地;右岸為深水槽,水深約2m。兩岸山脊高程:左岸250m,右岸350m。兩岸谷坡基本對(duì)稱,山坡坡度約為40。地層巖性樞紐區(qū)出露基巖有:奧陶系上統(tǒng)長(zhǎng)塢組(O3c)的青灰色泥巖間夾粉砂巖、砂巖組成的韻律層,巖性軟弱,易風(fēng)化,風(fēng)化后呈黃綠色,分布于壩址下游約500m處;奧陶系上統(tǒng)文昌組(O3w)的青灰色中厚層狀石英砂巖,夾薄層狀粉砂質(zhì)泥巖,局部含有砂質(zhì)、泥質(zhì)結(jié)核,砂巖中細(xì)粒結(jié)構(gòu),礦物成分主要有石英、斜長(zhǎng)石、云母等,巖石堅(jiān)硬致密,抗風(fēng)化能力較

41、強(qiáng),為壩基主要地層。覆蓋層有:第四系中更新統(tǒng)沖洪積(al-plQ2)含泥砂礫卵石層,密實(shí),厚度2-3m。礫石粒徑一般2-5m,大者50cm,呈次棱角次圓狀,礫卵石表面風(fēng)化嚴(yán)重,含量70,泥質(zhì)含量5-10,分布于水文站附近,組成級(jí)基座階地;上更新統(tǒng)沖積洪積(al-plQ3)砂質(zhì)粘土和含泥砂礫石層,密實(shí),其中上部砂質(zhì)粘土,黃色,厚度約1.5m,下部含泥砂礫石,厚度0.5m,礫石表面已局部風(fēng)化,分布于壩址左岸,組成級(jí)隱伏堆積階地。全新統(tǒng)坡積(dl Q4)粉質(zhì)粘土夾碎石層,稍密,厚度4-6m,主要分布于左岸坡麓,覆蓋于左岸級(jí)階地之上;坡洪積(dl-pl Q4)粉質(zhì)粘土夾碎塊石、礫石層,分布于兩岸溝谷中

42、,厚度一般不大。沖洪積(al-pl Q4)砂礫卵石層,松散稍密,厚度1-4m,礫石粒徑以2-8cm為主,局部大于15cm,呈次圓-滾圓狀,成分以砂巖、泥巖及火山巖為主,含量70-75,砂以中粗粒為主,含量25-30,分布于河床和漫灘;人工堆積塊石層(rQ),厚度2-4m,分布于壩址右岸,為公路開(kāi)挖棄渣。地質(zhì)構(gòu)造樞紐區(qū)斷層發(fā)育,主要以北東向、北北東向的高傾角逆斷層為主。受構(gòu)造剪應(yīng)力影響,巖層層間擠壓破碎帶發(fā)育,主要位于泥巖與砂巖交界面附近,擦痕通常非常明顯,破碎帶寬度10-80cm不等,局部大于1m,除壓碎巖外,大多有泥質(zhì)充填(系泥巖和砂巖的磨碎物質(zhì)),延伸長(zhǎng)度大多在10-20m以上,主要分布于

43、地表25m深度范圍內(nèi),在向斜軸部和斷層帶附近最為發(fā)育。區(qū)內(nèi)地震活動(dòng)主要受大斷裂控制,據(jù)文獻(xiàn)記載,共發(fā)生有感地震40余次,其中最大震級(jí)為發(fā)生1855年富陽(yáng)城北一次5級(jí)地震,震中處于昌化普陀深大斷裂與球川蕭山深大斷裂交匯之銳角三角形的端點(diǎn);另外,據(jù)地震臺(tái)資料,目前僅在1971年3月16日于浙皖交界處的寧國(guó)墩一桐坑斷層上發(fā)生一次3.3級(jí)的地震外,其余均為微震。上述地震對(duì)工程場(chǎng)地的影響烈度均小于度。d水文地質(zhì)條件地下水賦存類型有基巖裂隙水和第四系松散層的孔隙潛水兩種,未見(jiàn)承壓水,前者富水性主要受巖體風(fēng)化和構(gòu)造控制,透水性差,水位埋深壩址區(qū)一般13.026.0m,局部大于30.0m。后者主要賦存于沖洪積

44、和坡麓地帶的松散堆積層中,一般埋藏淺,水量豐富,透水性大,沖洪積砂礫卵石層滲透系K=0.03-0.11cm/s,屬?gòu)?qiáng)透水層,水位隨季節(jié)變化。本區(qū)地下水與地表水水化學(xué)類型均為HCO3CaMg型,PH值6.96,對(duì)砼無(wú)侵蝕。e.壩址工程地質(zhì)評(píng)價(jià)壩址基巖為中厚層狀石英砂巖夾薄層狀粉砂質(zhì)泥巖組成,新鮮砂巖堅(jiān)硬致密。干極限抗壓強(qiáng)度Rc=151.6MPa,軟化系數(shù)Kd=0.96。壩基巖石物理力學(xué)性質(zhì)及本階段巖體現(xiàn)場(chǎng)力學(xué)試驗(yàn)成果匯總見(jiàn)表1-7、1-8。表1-7 壩基巖石物理力學(xué)性質(zhì)(1959年資料)項(xiàng) 目新鮮砂巖弱風(fēng)化砂巖新鮮泥巖風(fēng)化泥巖容重(KN/m3)干燥27.026.227.125.2飽合27.126

45、.527.425.9比重2.742.752.762.78吸水率()0.301.080.732.46孔隙率()2.263.991.619.06抗壓強(qiáng)度(Mpa)干燥151.689.057.832.5飽合145.186.324.8軟化系數(shù)0.960.970.76抗剪試驗(yàn)Tg0.7450.745C(MPa)0.07表1-8 本階段巖體現(xiàn)場(chǎng)力學(xué)試驗(yàn)成果匯總表試驗(yàn)位置巖性及風(fēng)化程度抗剪(斷)強(qiáng)度抗剪強(qiáng)度峰 值峰 值屈服值f,c,(Mp)fc(Mp)fc(Mp)PD303 (5.5-10.0m)弱風(fēng)化中部石英砂巖1.040.940.820.840.700.63PD303 (10.8-16.7m)弱風(fēng)化中下

46、部石英砂巖1.080.940.870.76.0.760.70PD303 (5.0-10.0m)弱風(fēng)化粉砂質(zhì)泥巖0.760.640.630.600.540.56PD303 (10.0-19.0m)微風(fēng)化-新鮮粉砂質(zhì)泥巖0.880.880.740.840.630.74壩址左岸桐千公路以上弱風(fēng)化基巖出露,以下分布有第四系全新統(tǒng)坡積粉質(zhì)粘土夾碎石層,厚度46m(垂直厚度,下同)和級(jí)階地的上更新統(tǒng)沖洪積砂質(zhì)粘土和含泥砂礫石層,可見(jiàn)厚度2m。弱風(fēng)化巖石厚度5.0-12m,巖石質(zhì)量指標(biāo)值RQD=33-44,新鮮巖石質(zhì)量指標(biāo)RQD=56-91;河床段上部為第四系全新統(tǒng)砂礫卵石層,松散-稍密,厚度2-4m。弱風(fēng)

47、化厚度0-11.8m,巖石質(zhì)量指標(biāo)RQD=16-46,新鮮巖石質(zhì)量指標(biāo)RQD=52-91。右岸分老公路以下為人工堆積碎塊石層厚度2-4m,公路以上基巖出露,其中強(qiáng)風(fēng)化厚度1.5-5.0m,弱風(fēng)化厚度9-11m,弱風(fēng)化巖石質(zhì)量指標(biāo)RQD=16-45,新鮮巖石質(zhì)量指標(biāo)RQD=78-90。根據(jù)上述鉆孔R(shí)QD值統(tǒng)計(jì),可見(jiàn)壩基弱風(fēng)化巖石以類巖體為主,微風(fēng)化-新鮮巖石一般為-類巖體,局部為類巖體。壩體位于外塔向斜的軸部及南東翼,主要發(fā)育斷層走向以北東和北北東向?yàn)橹?,其中F5和F9斷層規(guī)模相對(duì)較大。在向斜軸部通過(guò)處和斷層附近,層間擠壓破碎帶發(fā)育,破碎帶寬度10-80cm為主,由壓碎巖和泥組成,延伸長(zhǎng)度大多在

48、10-20m以上,主要分布于地表25m深度范圍內(nèi)。節(jié)理發(fā)育,以陡傾角為主,緩傾角主要為層面節(jié)理。壩基的基巖地基中,主要因巖體節(jié)理裂隙發(fā)育形成基巖表層的不規(guī)則透水層,其下為相對(duì)隔水層,根據(jù)壩址鉆孔地質(zhì)資料統(tǒng)計(jì):壩基相對(duì)隔水層(25.5(KN/m3)26.626.326.4/堆積密度15.0(KN/m3)15.412.813.3/孔隙率40(%)42.351.250.0/含泥量3(%)3.250.30.60.5云母含量2(%)痕跡0.01/硫酸鹽及硫化物含量26.0(KN/m3)25.8堆積密度16.0(KN/m3)18.1孔隙率45()30.0含泥量2.5()吸水率25()0.99針扁狀顆粒含量

49、15()4.74軟弱顆粒含量10()0.76粒度模數(shù)6.25-8.30有機(jī)質(zhì)含量淺于標(biāo)準(zhǔn)色淡塊石料塊石料場(chǎng)有4個(gè),壩址上游和下游各2 個(gè),運(yùn)距1.0-7.0km,總儲(chǔ)量大于220萬(wàn)m3。其中1號(hào)料場(chǎng)位于印渚電站進(jìn)水口一帶,巖性為條帶狀灰?guī)r,巖石堅(jiān)硬致密,儲(chǔ)量大于150萬(wàn)m3,運(yùn)距7.0km;2號(hào)料場(chǎng)位于壩址上游右岸排塢口村里側(cè)山凹里,巖性均為中厚層石英砂巖夾薄層狀粉砂質(zhì)泥巖,儲(chǔ)量大于10萬(wàn)m3,運(yùn)距為1km;3號(hào)料場(chǎng)位于壩址下游 中塘塢衛(wèi)星水庫(kù)下游,巖性為粉砂質(zhì)泥巖,儲(chǔ)量大于10萬(wàn)m3,運(yùn)距為2.0km;4號(hào)料場(chǎng)位于原桐廬衛(wèi)生學(xué)校里側(cè)的山凹中,巖性為粉砂質(zhì)泥巖,運(yùn)距2.0km,儲(chǔ)量大于50萬(wàn)m

50、3,四個(gè)料場(chǎng)表層覆蓋均較薄,約0.5-1.0m,全部風(fēng)化原度2-3m,一般剝除無(wú)用層厚度3.0-5.0m。本合同工程取用2 號(hào)料場(chǎng),塊石儲(chǔ)量及質(zhì)量均能滿足工程需要。巖石物理力學(xué)指標(biāo)見(jiàn)表1-12。表1-12 塊石料物理力學(xué)指標(biāo)巖性干容重(kN/cm3)飽合容重(kN/cm3)干抗壓強(qiáng)度(Mpa)飽合抗壓強(qiáng)度(Mpa)軟化系數(shù)塊石采取率砂巖27.027.11521450.9645-50灰?guī)r26.5-27.080-1000.85-0.90泥巖25.5-26.060-700.65-0.70土料粘土料場(chǎng)由2處(橋東和南堡),橋東料場(chǎng)位于壩址左岸下游約500m,南堡料場(chǎng)位于壩址右岸上游約2.0km.1.3

51、 對(duì)外交通條件江水利樞紐工程位于浙江省桐廬縣鎮(zhèn)上游 2.5km的五里亭,距桐廬縣城約37km,距杭州約105km,對(duì)外交通便利。公路:320國(guó)道經(jīng)過(guò)桐廬縣城,桐廬縣城至為三級(jí)公路,至壩址左、右岸分別為二級(jí)、三級(jí)公路。距壩址下游約2km處有大橋(汽-20)溝通兩岸交通。鐵路:杭州火車站可卸貨100t以下的單件重物,能滿足工程的轉(zhuǎn)運(yùn)要求。水路:上海港、寧波北侖港均可作為本工程的轉(zhuǎn)運(yùn)站。第二章 施工總平面布置2.1 施工總平面布置原則本標(biāo)的施工場(chǎng)地布置原則上按招標(biāo)文件、設(shè)計(jì)圖紙劃定的施工區(qū)域或征地范圍內(nèi)。在具體布置中、根據(jù)本標(biāo)的工程特點(diǎn)和施工地段的地形、地質(zhì)條件及現(xiàn)場(chǎng)實(shí)際條件,合理布局,統(tǒng)籌安排,力

52、求合理、緊湊、厲行節(jié)約、經(jīng)濟(jì)實(shí)用、方便管理,確保各施工時(shí)段內(nèi)的施工均能正常有序和安全高效地進(jìn)行。同時(shí),盡量少占耕地,對(duì)施工區(qū)及周圍環(huán)境進(jìn)行有效的保護(hù)。詳見(jiàn)施工總平面布置圖。2.2 風(fēng)水電及通訊系統(tǒng)(1)、施工供風(fēng)在壩址上游左岸設(shè)置一處壓風(fēng)站,配備四臺(tái)10m3/min電動(dòng)壓風(fēng)機(jī),供攔河壩、泄洪閘基礎(chǔ)石方開(kāi)挖和發(fā)電廠房基礎(chǔ)石方開(kāi)挖使用。并配備二臺(tái)9m3/min柴動(dòng)壓風(fēng)機(jī)(移動(dòng)式)作為機(jī)動(dòng)。 壓風(fēng)機(jī)在壓風(fēng)站集中供風(fēng)運(yùn)行,通過(guò)壓風(fēng)管向各工作面供風(fēng),共鋪設(shè)6管500m,3-4管500m。(2)、施工供水在大壩上游圍堰前左、右岸的位置,各設(shè)一處取水泵站,采用一臺(tái)IS100-65-250型離心式清水泵(Q=

53、100m3/h,H=80m,N=37kw)在堰前的江中提水,并在左岸90m高程處各設(shè)分別為300m3和200m3蓄水池,用自來(lái)水管向場(chǎng)內(nèi)的各施工工作面供水,蓄水池土建工程量和自來(lái)水管工程量如下:土方開(kāi)挖 300m3石方開(kāi)挖 500m3M10砂漿砌塊石 200m3砼 50m3鋼筋 2T自來(lái)水管 (4-2)2500m生活區(qū)內(nèi)設(shè)一處30T生活水處理廠,采用一臺(tái)IS80-65-200型清水泵(Q=50m3/h,H=50m,N=15kw)提水,經(jīng)過(guò)濾沉淀后加氯消毒后,進(jìn)入生活區(qū)的供水網(wǎng)。(3)、施工供電本標(biāo)的施工用電從業(yè)主提供在場(chǎng)內(nèi)的10KV高壓輸電線路設(shè)置的二臺(tái)500KVA和一臺(tái)320KVA變壓器接引

54、,供壩區(qū)、發(fā)電廠房、泄洪閘各施工點(diǎn)以及輔助企業(yè)、生活區(qū)用電。砂石料場(chǎng)電源在料場(chǎng)附近村莊接引。共架設(shè)低壓動(dòng)力線:5000m。另配120KW柴油發(fā)電機(jī)組1臺(tái),作為備用電源。(4)、通訊系統(tǒng)項(xiàng)目經(jīng)理部安裝一臺(tái)程控電話機(jī),作為對(duì)外聯(lián)絡(luò)通訊工具。項(xiàng)目經(jīng)理、項(xiàng)目副經(jīng)理、項(xiàng)目技術(shù)負(fù)責(zé)及質(zhì)檢負(fù)責(zé)等主要管理人員均配備手機(jī),方便聯(lián)絡(luò)。另外配備對(duì)講機(jī),便于場(chǎng)內(nèi)施工管理和指揮調(diào)度。2.3 場(chǎng)內(nèi)施工道路場(chǎng)內(nèi)施工道路可以利用左右岸現(xiàn)有的公路以及上壩公路,另外還需分別修建左右岸上下游的下基坑的施工道路共約計(jì)1000m,道路為泥結(jié)碎石路面,路面寬度7.0m,平均坡度為%。砂石料場(chǎng)內(nèi)需修建約1000m長(zhǎng)的運(yùn)輸?shù)缆?,并與附近公路

55、溝通,采用推土機(jī)集碴填筑路基,泥結(jié)石路面,路面寬為7.0m。另外還需修建溝通輔企、生活區(qū)、棄碴場(chǎng)等設(shè)施的施工道路約500m。2.4 砂石料系統(tǒng)(1)、料場(chǎng)選擇本標(biāo)工程的砼總量約為15.4萬(wàn)m3,需砼骨料約26.2萬(wàn)m3,根據(jù)設(shè)計(jì)提供的料場(chǎng)分布圖資料分析,擬選取壩址上游印渚1#料場(chǎng)、印渚2#料場(chǎng)為砼骨料料場(chǎng),砂石料篩分系統(tǒng)布置在印渚2#料場(chǎng)。印渚1#料場(chǎng)面積2.25km2,運(yùn)距為3.6km,其儲(chǔ)量為6.76萬(wàn)m3,黃砂儲(chǔ)量為4.82萬(wàn)m3。印渚2#料場(chǎng)面積5.1km2,運(yùn)距為3.5km,其儲(chǔ)量為15.81萬(wàn)m3,黃砂儲(chǔ)量為2.66萬(wàn)m3。另外選取南堡料場(chǎng)作為上二料場(chǎng)不足補(bǔ)充料場(chǎng)。能夠滿足砼澆筑需

56、用量的要求。(2)、篩分設(shè)備選擇:根據(jù)工期進(jìn)度安排,需建砂石篩分能力為100T/h的篩分系統(tǒng),計(jì)算如下:月采運(yùn)能力:Q月=(QmA+Q0)Ks式中:Qm:高峰期的月砼澆筑強(qiáng)度,取8500m3/月 A:每立方米砼的骨料用量,選取2.20T Q0:其他砂石料月需用量(T),取5000T Ks:損耗補(bǔ)償系數(shù):選取1.27得Q月=(85002.20+5000)1.27=30100T按每天二班開(kāi)采計(jì)算,則小時(shí)開(kāi)采能力為:Qh= Q月(1425)= 30100(1425)= 86 T/h根據(jù)以上計(jì)算分析,選擇一臺(tái)SSZ215005500吊式直線振動(dòng)篩,篩分機(jī)設(shè)4層篩網(wǎng),分別為8080mm篩網(wǎng)、4040mm

57、篩網(wǎng)、2020mm篩網(wǎng)和55mm篩網(wǎng),篩分能力大于100T/h,電機(jī)動(dòng)率10kw。能夠滿足最大月強(qiáng)度的開(kāi)采能力。(3)、骨料篩分篩分系統(tǒng)擬布置在印渚2#料場(chǎng)。首先采用推土機(jī)清除料場(chǎng)地表的植被,浮石、表土等無(wú)用層,然后根據(jù)開(kāi)采方案做好開(kāi)采準(zhǔn)備工作和平面布置,包括開(kāi)采區(qū)周圍布置排水溝、沉淀池、水泵等?;旌狭喜捎?.0m3液壓反鏟開(kāi)挖裝5-8T自卸汽車運(yùn)至篩分機(jī)地壟卸料處,經(jīng)料口120120mm篩網(wǎng)預(yù)篩,大于120mm料運(yùn)到規(guī)定的棄料場(chǎng)地棄之。小于120mm的過(guò)篩料由皮帶機(jī)運(yùn)送至篩分機(jī)進(jìn)行篩分,篩分后的40-80mm、20-40mm、5-20mm及黃砂分別由皮帶機(jī)運(yùn)送至儲(chǔ)料倉(cāng)內(nèi),按不同規(guī)格分別堆放。

58、砂石料的清洗采用清水離心泵IS50-32-125(Q=12.5m3/h,H=20,N=2.2KW)直供水方式從河中提水,形成壓力水配合篩分機(jī)進(jìn)行沖洗。2.5 砼系統(tǒng)(1)、拌和能力本標(biāo)工程砼用量為15.4萬(wàn)m3,最大月砼澆筑強(qiáng)度為(8500m3/月)考慮到高峰期各澆筑塊臺(tái)班澆筑強(qiáng)度不均勻性等因素,小時(shí)生產(chǎn)能力Qh按下式計(jì)算: KhQmQh= = 25.5 m3/h 2025Qm:最大月砼澆筑強(qiáng)度 ?。?500 m3/月Qh:小時(shí)不均勻系數(shù) ?。?.5則小時(shí)生產(chǎn)能力Qh:25.5m3/h砼拌和系統(tǒng)選擇根據(jù)以上計(jì)算,并充分考慮砼澆筑高峰期倉(cāng)面大小等不均衡性,擬采用31.0 m3砼微機(jī)自控拌和系統(tǒng),

59、生產(chǎn)能力為48m3/h。砼拌和系統(tǒng)布置在左岸下游原公路旁,利用開(kāi)挖整平修建。(2)、工藝流程砼拌和工藝流程如下頁(yè)圖所示:砂石料皮帶機(jī)送料儲(chǔ)料斗自動(dòng)稱量斗水泥水泥罐螺旋輸送機(jī)自動(dòng)稱量外加劑外加劑池酸堿泵稱量桶水流量泵程控給水31拌和樓砼罐配門機(jī)或履帶吊機(jī)澆筑點(diǎn)1)、砂石料 砂石料篩分場(chǎng)的砂石料成品料,用ZL-50裝載機(jī)裝15T自卸汽車運(yùn)到拌和站的堆料隔倉(cāng)內(nèi)堆料隔倉(cāng)共分5檔(黃砂,5-20mm,20-40mm,40-80mm,80-120mm)每檔寬10m,高8m。由各種料由料倉(cāng)下地壟皮帶機(jī)運(yùn)送到拌和樓儲(chǔ)料倉(cāng),再由自動(dòng)稱量斗自動(dòng)送入到砼攪拌機(jī)。2)、水泥 拌和站設(shè)3只125T水泥罐,采用1臺(tái)GX-

60、300型螺旋輸送機(jī)輸送水泥到自動(dòng)稱量斗,再送到配料斗后進(jìn)入砼攪拌機(jī)。3)、外加劑 所有外加劑均應(yīng)根據(jù)說(shuō)明書(shū)和現(xiàn)場(chǎng)試驗(yàn)確定摻量,通過(guò)外加劑池稀釋到要求濃度,由酸堿泵送到儲(chǔ)箱(桶),再經(jīng)稱量裝置送到砼拌和機(jī)內(nèi)。4)、水 根據(jù)砼試驗(yàn)及現(xiàn)場(chǎng)調(diào)整配合比確定的拌和加水量,由程控系統(tǒng)控制流量泵進(jìn)行加水。2.6 其它臨建系統(tǒng)布置(1)、停車場(chǎng) 布置在下游灘地上,利用壩基開(kāi)挖的棄碴平整停車場(chǎng)。(2)、棄碴場(chǎng) 本標(biāo)工程基礎(chǔ)覆蓋層等開(kāi)挖出來(lái)的棄碴料,部分利用于施工場(chǎng)地平整和圍堰堰體填筑用料,其余棄碴堆放在下游業(yè)主指定的棄碴場(chǎng)地。(3)、輔助企業(yè):各種輔助企業(yè)及生活設(shè)施根據(jù)現(xiàn)場(chǎng)地形條件布置在下游業(yè)主指定的臨設(shè)場(chǎng)地及沿

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論