版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
WATERTANKCONSTRUCTIONMETHODSTATEMENT(CIVILWORK)TABLEOFCONTENTTOC\o"1-2"\h\z\uHYPERLINK3HYPERLINK3HYPERLINK6HYPERLINK15HYPERLINK18HYPERLINKvalueofnotlessthan5tonneswhentestedinaccordancewithB.S.812Part111andmaybedepositedbelowwaterwithouttheassociateduseofcompactionplant.SeiveanalysisasperBS1377:P2methodshouldbe9.2or9.3latestedition.TABLE1FREEDRAININGMATERIALB.S.SIEEVESIIZE%BYWEIIGHTPPASSINNG10mmUpto10005mmNotmoreethann850.600mmmNotemorrethaan450.075mmmNotemorrethaan52.3PLACINGANDCOMPACTIONREQUIREMENTSOnlyapprovedmaterialsshallbeusedintheconstructionofembankmentsfoundationstandingwater.Intheformationoftheembankmentfoundationitisstrictlyforbiddentopushtheexcavatedmaterialsfromthesideoftheroadtotheembankmentfoundationbymeansofbulldozers.Thefillmaterialshallbedeliveredandspreadinlayersnotexceeding25cmcompactedthickness.Thelayersoffillshallbegraded,leveled,pulverizedandmixed,withwateraddedasnecessary,toensurehomogeneousconditionsthroughthefulldepthoftheuncompactedlayer.Forfielddensitytestingrefertospecificationsubsection2/19.Thecompacteddensityofthefillshallbeequaltoorgreaterthan95(ninetyfive)percentoftheMaximumDryDensityasdeterminedbyBS1377Part4(method3.5or3.6).Allslopes,linesandgradesshallbetrue,correct,andaccurateandaccordingtothosedirectedandapprovedbytheEngineer.The"earthworksformationlevel"inembankmentsshallbeaccuratetotheauthorisedprofilegradetoplusone(1)cmorminustwo(2)centimetresand,the'topofimprovedsubgrade'level,plusorminusone(1)centimetrefor3locationsmaximumeach100minterval.Selectedmaterialshallbeplacedwhereverrequired.WherediscrepanciesarefoundintheworkCHECshallmakenecessarycorrectionsinamannerapprovedbytheEngineer.2.4MOISTURECONTROLREQUIREMENTSWhenthemoisturecontentoftheembankmentsoildoesnotfallwithin+3%oftheoptimummoisturecontent,watershallbeaddedandthoroughlymixedintothesoil,byapprovedmethodsorthematerialshallbeaerated,whicheverisneededtoadjustthesoiltothepropermoisturecontent.Theamountofwatertobeaddedshallbeonlythatamountthatwill,asdeterminedbytheEngineerbyfieldtests,provideamoisturecontentinthesoilwithintherequiredrangeplusareasonableamounttocompensateforevaporationandotherunavoidablelosses.WateraddedinexcessofthisamountshallbeconsideredasexcesswaterandmustberemovedbyaerationorothersuitablemeansasdirectedbytheEngineer.Satisfactorymethodsandsufficientequipmentshallbeusedforthefurnishingandhandlingofthewatersothattherewillbenounduelossduetoevaporationorwaste.Ifwaterisaddedtocutareasorborrowpits,thesurfaceoftheareasorpitsshallbemaintainedinsuchamannerthatwillpreventunduelossofmoistureandsegregation.Useofsalinewaterforearthworkswillonlybepermittedifthepercentageofwatersolublesaltsinthecompactedfilldoesnotexceed3%byweightofdrysoil.Forsubgradematerialmoisturerangerefertosubclause2/ROCKFILLWhereembankmentstobecompactedareformedofmaterialconsistingpredominantlyofrockfragmentsofsuchsizethatthematerialcannotbeplacedinlayersofthethicknessprescribedwithoutcrushing,pulverisingorfurtherbreakingdownthepiecesresultingfromnormalexcavationmethods,thematerialmaybeplacedintheembankmentinlayersnotexceedingathicknesstwicetheaveragesizeofthelargerrocks,exceptthatnolayershallexceed600mmofloosemeasurement.Materialsshallbecarefullyplacedsothatalllargestoneswillbewelldistributedandthevoidscompletelyfilledwithsmallerearth,sandorgraveltoformasolidembankment.Eachlayershallbebladedorlevelledwithmotorgrader,bulldozerorsimilarequipmentcapableofshiftingandformingthelayerintoaneatandorderlycondition.No.rockslargerthaneighty(80)mminanydimensionshallbeplacedinthetoponehundredandfifty(150)mmoftheembankmentunlessotherwisenotedonthedrawings.ConformancetotheseprovisionsandcompactioninamannerandtoapointofconsolidationapprovedbytheEngineerwillbeconsideredasfulfilmentoftherequirementsforthetypeofcompactionshownonthedrawings.Normally,compactiontestswillnotbeperformedintheseareasbuttheEngineerreservestherighttocompactioninsomeothermannerifhedeemsatestnecessarytoensureconsolidation.EachlayermustbeapprovedbytheEngineerbeforethenextlayerisplaced.Embankments,whichareformedofmaterialsthatcontainrockbutalsosufficientcompatiblematerialotherthanrockorotherhardmaterialtomakerollingfeasible,shallbeplacedandcompactedinthemannerandtothepointofconsolidationapprovedbytheEngineer.MoistureshallbeaddedasdirectedbytheEngineer.CompactiontestswillbemadewherevertheEngineerdeterminestheyarefeasibleandnecessary.EachlayermustbeapprovedbytheEngineerbeforethenextlayerisplaced.2.6TESTINGTESTINGMETHODSAmoisturedensitytestinaccordancewithBS1377Part4(method3.5or3.6)willbemadeforeachtypeofsoiltobeusedintheconstructionoftheworktodeterminetheMaximumDryDensity,theOptimumMoistureContentandtheMoistureRangerequiredofthesoilforsatisfactorycompaction.TheFieldDensityandactualMoistureContentofthecompactedembankmentshallbedeterminedbyfieldtestsaccordingtoBS1377Part9(method2.1or2.2)MINIMUMTESTREQUIREMENTSForCHEC'sgeneralguidance,thefollowingtestswillberequiredpriortouse,andduringtheconstructionoftheembankmentandofthesubgrade.3.1GeneralConcreteworkwillconsistoffurnishingallmaterialsandconstructingstructuresoftheforms,shapesanddimensionsshownontheDrawingsorasdirectedinaccordancewiththedetailsshownontheDrawings.3.2MATERIALS3.2.1 CementSULPHATERESISTINGCEMENTSulphateResistingCementwillcomplywithBS4027orASTMC150Type5.Inadditionthecementwillcomplywiththefollowing:Theacidsolublealkalilevelmeasuredas(Na20+0.658K20)willnotexceed0.6%byweightdeterminedinaccordancewithBSEN196
P2(95).Theheatofhydrationwillnotexceed290KJ/Kgat7dayswhentestedinaccordancewithBS4550:Part3Section3.8.Thespecificsurfacewillbenotgreaterthan375m2/kgandnotlessthan280m2/kgwhentestedinaccordancewithBSEN196:Part6.a.Cementwillbedeliveredtositeinbulk,orwiththeEngineer'sapproval,maybesuppliedinsealedbags,whichwillbearthemanufacturer’snameandthedateofmanufacture.Acopyofthemanufacturer’sbatchtestcertificateandcertificateofguaranteewillaccompanyeachconsignment.b.Eachconsignmentofcementwillbekeptseparate,identifiedandusedinorderofdelivery.c.Anyconsignmentnotusedwithin2monthsfromthedateofmanufacturewillnotbeallowedtobeusedintheworks.d.OnebrandonlyofcementasapprovedbytheEngineerwillbeusedthroughouttheworksunlessotherwiseauthorisedbytheEngineerinwriting.FineAggregateforConcreteandMortarThegradationoffineaggregatewillbeinaccordancewithBS882latesteditionexcludinggradingdesignationF.FineAggregatewillbecleansharpnaturaland/orcrushedsandandwillbewithinBS882zonescandmonly.CHECwillmechanicallywashaggregatetoremovesaltsandotherimpuritiesinordertomeettherequirementspecified.CoarseAggregateforConcreteCoarseaggregatewillbepreparedassinglesizedaggregateandblendedtoproducenormalsizegrading.ThecombinedgradingwillbewithintheappropriategradinglimitsgiveninBS882.Aggregatesthataredeleteriouslyreactivewiththealkalisinthecementinanamountsufficienttocauseexcessiveexpansionofconcretewillnotbeused.CHECwillmechanicallywashaggregatetoremovesaltsandotherimpuritiesinordertomeettherequirementspecified.3.2.4 COMBINEDAGGREGATEApprovedcoarseaggregateandfineaggregateineachbatchwillbecombinedinproportionsasspecifiedinBS882andasapprovedbytheEngineer.However,innocasewillmaterialspassingthe0.075mm,sieveexceedthree(3)percentbyweightofthecombinedaggregate.Thecombinedaggregategradationusedintheworkwillbeasspecified,exceptwhenotherwiseapprovedordirectedbytheEngineer.ChangesfromgradationtoanotherwillnotbemadeduringprogressoftheworkunlessapprovedbytheEngineer.WATERCHECwillmakehisownarrangementandobtainapprovalforthesupplyofwater.Themixingwatershouldbeclear,apparentlycleanandfreefrommatterharmfultoconcreteinitsfreshorhardenedstate.Potablewatercanbeused.Thetemperatureofwaterforconcreteshouldnotbelessthan5degreeCelsiusnormore25degreeCelsius.Watermaybecooledtonotlessthan5degreeCelsiusbythegradualadditionofchilledwateroricebutonmixing,noiceparticlesshouldbepresentinthemix.Alternatively,flakedicemaybeused.Waterforcuringconcretewillnotcontainimpuritiesinsufficientamountstocausediscolourationoftheconcrete.SourcesofWaterwillbemaintainedatsuchdepthandthewaterwillbewithdrawninsuchamannerastoexcludesilt,mud,grassandotherforeignmatter.TESTINGAllconcrete,aggregate,cementandwaterwillbesampledandtestedduringconstructionasfrequentlyasdeemednecessarybytheEngineer.AlltestsampleswillbesuppliedbyCHECathisexpense.SampleswillbeobtainedinaccordancewithBS812,BS3148,BS1881andBSEN196.TestingwillbeatthefrequenciesstatedintheSpecificationsorrelevantstandards.AllsamplingwillbecarriedoutbytheEngineer.TRIALMIXESNostructuralconcreteshallbeplacedintheworksuntiltherelevantmixhasbeenapprovedbytheengineer.CHECwill,atleast35daysbeforethecommencementofconcreting,havetrialmixesprepareandtestedinalaboratorytobeapprovedbytheengineer.Whenthemixhasbeenapproved,novariationsshallbemadeintheproportions,theoriginalsourceofthelatterwithouttheconsentoftheengineerwhomayrequirefurtherteststobemade.Theengineermayalsorequirefieldtrialstobemadeonthesitebyfillingtrialmouldstoconfirmthesuitabilityofthemixfortheworks.Inthesetest,thetypeofplantusedformixing,themethodofcompactionused,andtheformworkfacetothemouldshallbesimilarinallrespectstothoseintendedforuseintheworks.WhenCHECintendtopurchasefactorymadeprecastconcreteunits,theengineermaydispensewithtrialmixesandlaboratorytests,providedthatevidenceisgivenwhichsatisfieshimthatthefactoryregularlyproducesconcrete,whichcomplieswiththeSpecification.Theevidenceshallincludedetailofmixproportions,watercementratio,workabilityandstrengthobtainedat7and28days. WORKABILITYWorkabilitywillbeassessedbythefollowingteststherequirementsforwhichwillbeasspecifiedelsewhereinthedocuments.SlumptestwillbeperformedaccordingtoBS1881Part102CompactionfactorwillbeperformedaccordingtoBS1881Part103.VebetimewillbeperformedaccordingtoBS1881Part104FlowtestwillbeperformedaccordingtoBS1881Part105. COMPRESSIONTEST TheCompressiontestswillbeperformedoncubes150x150x150mmasdescribedinBS1881Part116.Sampling,makingtestcubesandcuringofcubeswillbeinaccordwithBS1881Parts101,108and111respectively.3.4FORMWORK3.4.1 General Formworkwillineveryrespectbeadaptedtothestructureandtherequiredsurfacefinishoftheconcrete.Itwillincludealltemporarymouldsforformingtheconcretetotherequiredshapeandfinishandforthesupportofsuchmoulds.Itwillbefixedinperfectalignmentandsecurelyledgedandbracedsoastobeabletowithstand,withoutdisplacementdeflectionormovementofanykind,theweightoftheconstructionandthemovementofpersonsmaterialsandplant.Jointswillbecloseenoughtopreventtheleakageofliquidandfinematerialsfromtheconcrete.TheEngineer'sRepresentativemayatanytimerequirethepriorsubmissionforapprovalofCHEC'sproposalsfordesignandconstructionofformworkincludingsupports.Theformworkwillbeconstructedtopermititsremovalwithoutdamagetotheconcrete.3.4.2 SpacingBlocksandTemporaryConstructionTies Internalspacingblocksandconstructiontieswillbeavoidedasfaras,intheEngineer'sRepresentativeopinion,possibleandpracticable.Whereitisintendedthatthespacingblocksorconstructiontieswillberemovedwhetherbeforeoraftertheconcretehasset,themakinggoodoftheconcretewillbesubjecttotheEngineer'sRepresentative'sapproval.Theremovaloftheblocksortiesmustnotjeopardisethestabilityoftheconstruction.If,withtheapprovaloftheEngineer'sRepresentative,thespacingblocksandconstructiontiesareallowedtoremainintheconcretethentheywillbeofsuchmaterialandofsuchqualitythattheydonotprejudicethestrengthofthework. Concretespacingblockswillbemadeofconcreteatleastequalinqualitytothemainconcrete.Metaltieswillbepositionedsuchthattheydonotcomeintocontactwithanyofthereinforcementorfittingsandnopartofthetiewillbepermanentlyembeddedintheconcretenearerthan5cmtotheexteriorsurfaceoftheconcrete. Allholeswillbefilledwithnon-shrinkgrant.3.4.3 SlabFormsWheretimberisusedforthesoffitsofslabs,theboardswillbeplacedandlaidperfectlytruewithclosejointstopreventthepercolationofliquidorfinesfromtheconcrete.Tongueandgrooveplankswillbeusedifspecified.Allrequisitebearerandstrutswillbeadjustedinpositionandplacedwherenecessaryonbearersasspecifiedinthecaseofbeamforms.3.4.4 TypeofFormwork ExposedConcreteFacesAllconcretefaceswillbeleftasstruckwithafairface,truetolinefinish.Inordertohavethefinishasitwillbeformed,approvedbytheEngineer,testpiecesof1sq.mverticalpanel25cmthickwillbecast.AfterapprovaltheywillberetainedinpositionuntiltheconcreteworkshavebeencompletedthentheywillbedemolishedandremovedfromtheWorks.Aftercarefulinspection,allsuperfluousfinesandsimilarprojectionswillbecarefullyremoved.Norenderorotherappliedfinishwillbeusedtoobtainafairfacetotheconcrete.AllconcretefacestobeexposedinthefinishedworkswillbeadequatelyprotectedagainstdamageandsurfacestainingduringtheexecutionoftheWorks.3.4.2 PreparationofFormworkforConcretingImmediatelybeforetheconcreteisdeposited,theformworkwillbethoroughlycleanedoutandfreedfromsawdust,shavings,wirecuttings,dust,sand,clayandallotherdeleteriousandextraneousmaterials.Temporaryopeningswillbeprovidedintheformworktofacilitatethiswork.Theinsidesurfacesoftheformworkwill,immediatelypriortofinalerection,becoatedwithmouldoil.Themouldoilwillbeofapprovedtypeandwillbeapplieduniformlyandthequantitiesusedwillbetheminimumconsistentwithitspurposes.CHECwillensurethatallsteelreinforcementandadjoiningconcretesurfacesarekeptfreeofmouldoil.Allformworkandreinforcementwillbecleanandfreefromstandingwaterimmediatelybeforeplacingconcrete.3.4.3 ApprovalofFormworkbeforeConcretingCHECwillinallcasesrequesttheapprovaloftheformworkbytheEngineer'sRepresentativeinsufficienttimetoallowaninspectiontobemadeandwillnotcommenceconcretinguntilsuchapprovalisobtained.TheperiodbetweenCHEC'srequestforapprovalandhisintentiontocommenceconcretingwillbenotlessthanoneclearnormalworkingdayandtheEngineer'sRepresentativemayrequirealongerperiodif,inhisopinion,theformworkisofsuchcomplexityastorequireit.SuchapprovalwillnotabsolveCHECofhisresponsibilitiesundertheContract.3.4.4 RemovalofFormwork Allformworkswillbestruckwithoutjarringtheconcreteorsubjectingthesametosuddenshock. Beforestrikinganyformwork,CHECwillsatisfyhimselfthattheconcreteissufficientlyhardenedtobearitsownloadandanyotherloadsthatmaybeplacedonit. Noformworkistoberemoved,ifintheopinionoftheEngineer'sRepresentative,theconcretehasnotsetsufficiently. ApprovaloftheEngineer'sRepresentativewillnotabsolveCHECofhisresponsibilitiesundertheContract.Subjecttotheaboveandtheconcretetestcuberesults,theminimumperiodsfortheremovalofformworkgenerallyareasfollows: Sidesofbeams,wallsandcolumns - 2days Soffitsofbeamsandslabs(propsleftin) - 7days Removalofprops(beamsandslabs) -14days Soffitsofprecastbeams - 7days (ThesetimesmaybereducedonlywiththewrittenapprovaloftheEngineer) Inthecaseofthespecialtypesofformwork,strikingtimesaretobeapprovedbytheEngineer.Ifabeamslabisrequiredtosupportaconstructionloadinexcessofitsdesignload,thebeamorslabistobeproppeduntilthesupportedconstructionhasreachedtheagewhentheproppingmayberemoved.NosupportsfortheshutteringmaybeleftinthefinishedconcretewithoutthewrittenpermissionoftheEngineer.3.4.5 ConcreteBelowGround AllconcreteplacedbelowgroundlevelwillhaveaminimumprotectiontoitsoutsidefaceswithabituminousmembraneasperClauseofthisSpecification.3.5REINFFORCEMMENTSSTEEL3.5.1 GGeneraalALLREINNFORCEEMENT(BARTYPEDESIGGNATIOON'T'')WILLLBEEPOXYYCOATTEDHIIGHYIIELDDDEFORMMEDTYYPE2GRADEE460NN/mm2BARSTOBSS4449..CHECwilllberespoonsiblleforrfurnnishinngreiinforccingssteelinsuufficiientqquantiityanndofthepproperrsizees,leengthssandshapeesshoownonntheDrawiingsfforannygivvensttructuure.3.5.2 MaateriaalSpeecificcationns AllreinnforceementbarswillbbeofadefformeddtypeeinaaccorddancewithBS44449,eexcepttthattplaiinbarrsmayybeuusedwwherespeciificalllyinndicattedonntheDrawiings.PlaiinbarrswilllbeinacccordaancewwithBBS44449. AllsteeelreiinforccementtwilllconfformttotheerequuiremeentsooftheeSpeccificaationssforDeforrmedHHighYYieldSteellBarss,Graade4660Typpe2,unlesssothherwisseshoownonntheDrawiingsoorspeecifieedbytheEEngineeer.EithermmildssteelwhereespeccifieddorccalleddforwillbedeeformeedorplainnbarsscompplyinggwithhASTMMA6155struucturralgrradeoorBS4449orannyequuivaleentNaationaalStaandarddasddirecttedanndappproveddbyttheEnngineeer. TyingwiirewiillbeeNo.116gauugesooftannnealeediroonwirreorNo.118gauugesttainleessstteelwwireoortheeequiivalenntBSspeciificattionffortyyingwwireaandUPPVCcooatedsuitaablefforeppoxyccoateddrebaar. WeldedwwireffabriccwilllbeuusedaasreiinforccementtforconcrretewwhereshownnonttheDrrawinggsanddasddirectted.WWeldeddwireefabrricwiillcoonformmtotthereequireementssofBBS44883. Allreinnforceementwillbbeprootecteedagaainstcorroosionwithafussion-bbondeddepoxxycoaatinginacccordaancewwithtthereequireementssofAASTMAA775/AA775MaandBSS72955.CHECwilllberespoonsiblleforrobtaaininggtheEnginneer’sappprovalltotthestteelbbarsppriortocooatinggcommmencinng.SSuchaapprovvalwiillinnnowwayreelieveeCHECCofhiisressponsiibilittiesuundertheCContraact.CHECwilllfurrnishtothheEnggineerraceertifiicateofcoompliaancefforeaachshhipmenntofcoateedsteeelbaars.TheccertifficateeofccompliiancewillsstatethatrepreesentaativesampllesoffthecoateedbarrshavvebeeentesstedaandthhatthhetesstressultscompllywitththeerequuiremeentsooftheeSpeccificaationss.3.5.3 CConstrructioonofReinfforcemment Steelreeinforrcingwillbbestooredoontimmberppackinngcleearoffthegrounnd.Thhesteeelbaarswiillbeefreeefrommsharrpdefformattions,,rollled-innsilvvers,deeprecesssesoorsurrfacefaultts/bleemisheeswhiichcoouldrresulttiniineffiicienttoriinadeqquatecoatiing.WWhenffixedinthheworrkanddimmeediateelyprriorttoconncretiing,ssteelreinfforcinngwilllbeentirrelyffreeffromlloosemillscalee,loooseruust,ooil,ggreasee,paiint,mmouldoil,andaallottherddeleteerioussandextraaneoussmateerial..Allhookss,bennds,eetc.,unlesssothherwisseshoownonntheDrawiingswwillbbetoBS44466. Beforeoorderiingreeinforrcingsteell,CHEECwilllpreeparebarbbendinngschheduleesathisoowncoostanndsubbmittthemttotheeEngiineerforhhisappprovaal.Baarschheduleeswilllshoowtheeweigghtoffeachhbar,,thetotallweigghtoffeachhbarsizeandtthetootalwweighttofbbars,andbbendinngdiaagramssforbarsinacccordaancewwithBBS44666.TTheleengthofeaachbaarwilllbecalcuulateddinaaccorddancewithBS44466exxceptthatthemminimuumintternallbenddingrradiusswilllbeffourttimesthebbardiiameteer.CHHECwiillallsoprrovideeandsubmiittotheEEngineeerfoorappprovallanyworkiingdrrawinggsaddditionnaltootheContrractDDrawinngswhhichmmaybeefounndneccessarryforrtheproduuctionnofbbarbeendinggscheedulessorfforthhecommpletiionofftheWorkss. TheEngiineer’sappprovallofCCHEC’sworrkingdrawiingsaandbaarbenndingschedduleswilliinnowayrrelievveCHEECofrresponnsibillityfforthhecorrrectnnessoofsucchdraawingssorsscheduules. Steelreeinforrcemenntwilllbebentaccurratelyytottheshhapesandddimenssionsshownnonttheappproveedbarrbenddingllistsordrrawinggs.Baarswiillbeebenttrounndmanndrelssoftthereequisiitediiameteer. SteelreeinforrcemenntwilllbecutaandbeentinnaccoordanccewitthBS4466..Cutttingorbeendinggbyttheappplicaationofheeatissnotpermiitted..WelldingofreeinforrcemenntwilllonllybepermiittedwhenapproovediinwriitingbythheEnggineerr. IfsuchapproovaliisgivventhhenthheworrkmansshipwwillbbeinaccorrdanceewithhBS55135.CHECCwilllsubmmitfuullteechniccaldeetailssofhhisprroposeedproocedurresprriorttoseeekingapprooval. Hotrollledhiighyiieldbbarswwillnnotbeestraaighteenedoorbenntagaain,hhavinggonceebeennbentt.IftheEEngineeergiivesaapprovvaltoobenddmilddsteeelreiinforccementtprojjectinngfroomtheeconccrete,
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026年光建一體化科技公司特殊設(shè)備(光伏設(shè)備)管理制度
- 2026年光建一體化科技公司市場(chǎng)信息收集與分析管理制度
- 2026春貴州貴陽(yáng)市觀山湖區(qū)第七中學(xué)招臨聘教師6人備考題庫(kù)附答案詳解(基礎(chǔ)題)
- 2025年湖北成人學(xué)位外語(yǔ)考試沖刺練習(xí)題(含答案解析)
- 2026江蘇南京大學(xué)化學(xué)學(xué)院助理招聘?jìng)淇碱}庫(kù)附答案詳解(綜合卷)
- 2025至2030中國(guó)自動(dòng)駕駛測(cè)試場(chǎng)地建設(shè)標(biāo)準(zhǔn)與區(qū)域分布特征分析報(bào)告
- 2026湖南長(zhǎng)沙市周南梅溪湖中學(xué)招募就業(yè)見(jiàn)習(xí)人員備考題庫(kù)及答案詳解參考
- 2026年叉車(chē)考試題庫(kù)模擬理論及答案一套
- 2026年叉車(chē)車(chē)輛培訓(xùn)考試題庫(kù)及完整答案1套
- 2025-2030亞洲寵物醫(yī)療行業(yè)發(fā)展趨勢(shì)需求調(diào)研投資規(guī)劃發(fā)展分析報(bào)告
- 2025年生物多樣性保護(hù)與生態(tài)修復(fù)項(xiàng)目可行性研究報(bào)告
- 2025年黑龍江省檢察院公益訴訟業(yè)務(wù)競(jìng)賽測(cè)試題及答案解析
- 一氧化碳中毒救治課件
- 《會(huì)計(jì)信息化工作規(guī)范》解讀(楊楊)
- 高海拔地區(qū)GNSS大壩監(jiān)測(cè)技術(shù)研究
- 艾滋病的抗病毒治療
- 實(shí)施指南(2025)《DL-T 1630-2016氣體絕緣金屬封閉開(kāi)關(guān)設(shè)備局部放電特高頻檢測(cè)技術(shù)規(guī)范》
- 慢性胃炎的護(hù)理業(yè)務(wù)查房
- 2025至2030中國(guó)生物識(shí)別和身份行業(yè)發(fā)展趨勢(shì)分析與未來(lái)投資戰(zhàn)略咨詢(xún)研究報(bào)告
- 民航概論教學(xué)課件
- 報(bào)社實(shí)習(xí)生管理暫行辦法
評(píng)論
0/150
提交評(píng)論