版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
化學(xué)工業(yè)工程建設(shè)交工技術(shù)文件表H-101TAB.TECHNICALDOCUMENTSFORHANDOVEROF
ENGINEERINGCONSTRUCTIONINCHEMICALINDUSTRY項目:PROJECTS裝置:UNIT工號:SECTION建設(shè)單位:OWNER施工單位:CONTRACTOR第/卷第/冊VOL。NO.SECTNO.年月日DATE表H-102Tab。交工文件總目錄Generalcontentsofprojecthandoverdocuments項目:Project裝置:Unit工號:Section卷號VolNo。冊號SectNo.內(nèi)容Contents
表H-103Tab.交工文件目錄Contentsofprojecthandoverdocuments項目:Project裝置:Unit工號:Section序號SequenceNo.文件名稱Nameofdocument頁次Page備注Remarks
表H-104Tab。開工報告Reportforstartofconstruction項目:Project裝置:Unit工號:Section合同號ContractNo.工程地點Jobsite計劃開工日期年月日PlanneddateforstartofconstructionDate造價Cost合同工期月/天TimelimitspecifiedbycontractMonths/Days工程內(nèi)容:Contentsofengineeringproject開工前已達(dá)到的條件:Conditionsattainedbeforestartofconstruction備注:Remarks經(jīng)雙方認(rèn)定,實際開工日期:年月日ActualdateofstartofconstructionapprovedbybothsidesDate建設(shè)單位簽章:Ownersignature代表:年月日RepresentativeDate承包單位簽章:Contractorsignature代表:年月日RepresentativeDate
表H—105Tab.中間交接證書Certificateforintermediateacceptance項目:Project裝置:Unit工號:Section單項(位)工程名稱Nameofunitwork交接日期年月日DateofacceptanceDate工程內(nèi)容:Contentsofwork交接情況(符合設(shè)計的程度、主要缺陷及處理意見):Descriptionofacceptance(extentofconformitytodesign,maindefectsandsuggestionsfortreatment)工程質(zhì)量鑒定意見:Optionsforappraisalofengineeringquality建設(shè)單位簽章:Ownersignature代表:Representative年月日Date承包單位簽章:Contractorsignature代表:Representative年月日Date表H-106Tab.聯(lián)動試車合格證書Certificateforqualificationofsystemsimulationtest-run項目:Project裝置:Unit工號:Section裝置、車間、工段或生產(chǎn)系統(tǒng)名稱Nameofinstallation,plantorproductionsystem試車日期自年月日至年月日Dateoftest—runfromDatetoDate試車情況:Descriptionoftest—run附件:
Attachment建設(shè)單位簽章:Ownersignature代表:Representative年月日Date設(shè)計單位簽章:Designunitsignature代表:Representative年月日Date承包單位簽章:Contractorsignature代表:Representative年月日Date表H-108Tab。工程備忘錄Memorandumforengineeringproject一項目:Project裝置:Unit工號:Section事由:Maincontent編號:CodeNo。提出人:Submitter年月日Date會簽Co—signature建設(shè)單位代表:Ownerrepresentative年月日Date承包單位代表:Contractorrepresentative年月日Date施工單位代表:Subcontractorrepresentative年月日Date表H—109Tab。技術(shù)聯(lián)系單Technicalliaisonsheet項目:Project裝置:Unit工號:Section提出人送達(dá)聯(lián)系單號SubmitterSubmittedtoSheetNo,內(nèi)容:Contents年月日Date答復(fù):
Answer簽章Signature年月曰Date表H-110Tab。隱蔽工程記錄Concealedworkrecords項目:Project裝置:Unit工號:Section隱蔽部位Concealedlocation施工圖號EngineeringDrawingNo。隱蔽前的檢查:Inspectionbeforeconcealed隱蔽方法:Concealedmethod簡圖說明:Illustrationwithsketch建設(shè)單位代表:Ownerrepresentative年月日Date承包單位代表:Contractorrepresentative年月日Date施工單位:Subcontractorrepresentative施工人:Operator檢查員:Inspector年月日Date表H-111Tab.基礎(chǔ)沉降測量記錄Foundationsettlementsurveyingrecords項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name參考水準(zhǔn)點Referencebenchmark標(biāo)高Elevation
測量點位置Locationofsurveying安裝前Beforeerection安裝后Aftererection加負(fù)荷Loading負(fù)荷后Afterloading日期Date標(biāo)高Elevation日期Date標(biāo)高Elevation負(fù)荷量Load日期Date標(biāo)高Elevation日期Date標(biāo)高Elevation測量草圖:Surveyingsketch技術(shù)負(fù)責(zé)人Technicalpersonincharge測量人Surveyor表H-112Tab。焊工登記表Welderregistrationtable項目:Project裝置:Unit工號:Section序號SequenceNo.姓名Name鋼印號Welder’sstampNo。合格證號CertificateNo.合格項目(代號)Qualifieditems(codeNo.)
焊接檢查員Weldinspector制表人Tabulator管理人員登記表項目:裝置:工號:序號姓名發(fā)證機(jī)關(guān)合格證號有效期
表H-113Tab.焊接記錄表Weldingrecords項目:Project裝置:Unit工號:Section管線號或設(shè)備位號PipelineNo.orequipmentNo。焊縫號WeldNo.焊工/鋼印號Welder/StampNo.預(yù)熱溫度Preheatingtemp。焊接日期Dateofwelding備注Remarks
記錄人Recorder表H-116Tab.滲透探傷報告Penetranttestreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.執(zhí)行標(biāo)準(zhǔn)Standardforexecution材質(zhì)Material規(guī)格Specification表面狀態(tài)Surfacecondition清洗液Cleaningliquid滲透液Penetratingliquid滲透時間Penetrationduration顯影液Developingagent靈敏度Sensitivity觀察Observation肉眼/放大鏡()倍Visual/()timesmagnifyingglass探傷部位Testlocation缺陷性質(zhì)Defectnature缺陷長度Defectlength缺陷位置Defectlocation缺陷處理Defecttreatment評定結(jié)果Resultofevaluation
附注:Note"o'皿章Sealed審核人年月日ExaminerDate報告人年月日ReporterDate證號CertificateNo。NDT證號CertificateNo。NDT表H—117Tab.磁份探傷報告Magneticpowderinspectionreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.執(zhí)行標(biāo)準(zhǔn)Standardforexecution材質(zhì)Material規(guī)格Specification表面狀態(tài)Surfacecondition儀器型號Instrumenttype靈敏度試片Testpieceforsensitivity靈敏度評價Sensitivityevaluation磁粉類型Kindofmag—neticpowder粒度:目Size濃度Concentration媒介Medium磁化方式Modeofmagnetization電流:AElectriccurrent時間:sTime探傷部位Testlocation缺陷性質(zhì)Defectnature缺陷長度Defectlength缺陷位置Defectlocation缺陷處理Defecttreatment評定處理Evaluationresult
附注:Remarks皿章Sealed審核人年月日ExaminerDate報告人年月日ReporterDate證號CertificateNo.NDT證號CertificateNo.NDT表H-118Tab。熱處理報告Heat-treatmentreport項目:Project裝置:Unit工號:Section管線號/設(shè)備位號Pipeline/EquipmentlocationNo.規(guī)格Specification焊縫號WeldNo.材質(zhì)Material溫度(°C)熱處理曲線Heat-treatmentcurve時間(h)Times硬度試驗Hardnesstest部Testlod位硬度值ation—Hardnessvalue焊縫Weld熱影響區(qū)Heat-effectzone母材Basematerial說明:
interpretation技術(shù)負(fù)責(zé)人Technicalpersonincharge操作人Operator(熱處理)(Heat—treatment)(硬度試驗)(Hardnesstest)表H-119Tab。超聲波測厚報告Supersonicpachometerreport項目:Project裝置:Unit工號:Section委托單位Truster受檢件名稱Nameoftestpiece試驗編號TestNo.儀器型號執(zhí)行標(biāo)準(zhǔn)InstrumentmodelStandardforexecution測點編號TestpointNo.設(shè)計厚度(mm)Designthickness實測厚度(mm)Testthickness測點編號TestpointNo.設(shè)計厚度(mm)Designthickness實測厚度(mm)testthickness測點示意圖:Sketchfortestpoints"o'皿章Sealed審核人Examiner年月曰Date報告人年月日ReporterDate證號CertificateNo.NDT證號CertificateNo。NDT表H-121Tab.
金相檢驗報告Metallographicexaminationreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.試驗標(biāo)準(zhǔn)Standardforexamination試件名稱Nameofspecimen儀器型號Instrumentmodel評定標(biāo)準(zhǔn)Standardforevaluation試驗?zāi)康腡estaim試驗前的技術(shù)條件Technicalcondition鑒定意見及結(jié)論Appraisalopinionand蓋章Sealed審核人Examiner年月日Date報告人Reporter年月Date日表H-123Tab.化學(xué)分析試驗報告Testreportforchemicalanalysis項目:Project裝置:Unit工號:Section委托單位試驗編號TrusterTestNo。試驗標(biāo)準(zhǔn)Standardfortest取樣部位Samplinglocation材質(zhì)Material化學(xué)成份(%)ChemicalcompositionCSiMnSPCrNi
附注:Remarks"o'皿章Sealed審核人Examiner年月日3DateIi1報告人Reporter式驗人"ester年月日Date表H-126Tab.防腐層電火花檢測報告Electricsparktestreportofanti—corrosionlayer項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo。執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢件名稱Nameofspecimen防腐區(qū)段Anti—corrosionsection防腐等級Anti—corrosiongrade防腐厚度mmAnti—corrosionlayerthickness規(guī)范(設(shè)計)要求值:Requiredvalueofcode(design)kV/火花長度:Sparklength
檢測Results檢測部位Testlocation檢測值檢測Results檢測部位Testlocation檢測值Testvalue檢測部位Testlocation檢測部位簡圖:Diagramoftestlocation審核人Examiner年月曰Date結(jié)果oftest檢測值Testvalue檢測部位Testlocation檢測值Testvalue蓋章Sealed報告人Reporter試驗人Tester年月日Date絕熱施工工序質(zhì)量控制表Qualitycontroltableforconstructionproceduresofheat-insulation項目:Project裝置:Unit工號:Section機(jī)械位號/管道系統(tǒng)MachineequipmentNo./Pipelinesystem執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)械、管道交接檢查Acceptanceofmachine&equipment&pipeline□C材料交接檢查Acceptanceofmaterial□C基層表面檢查Basecoursesurface□CR絕熱層檢查Heat-insulatinglayer□Br防潮層檢查Damp-proofcourse□CR
保護(hù)層檢查n口□BRProtectivecourseR機(jī)械位號或管線號基層表面Basecoursesurface絕熱層Insulationlayer防潮層Damp-proofcourse保護(hù)外殼Protectivecourse備注Remarks處理方法結(jié)果名稱厚度結(jié)果名稱厚度結(jié)果名稱厚度結(jié)果技術(shù)負(fù)責(zé)人Technicalpersonincharge質(zhì)量檢查員Inspector施工人Operator表H-128Tab.項目:Project裝置:Unit工號:Section表H-201Tab。機(jī)泵安裝工序質(zhì)量控制表Qualitycontroltableformachineandpumpinstallingprocedure項目:Project裝置:Unit工號:Section位號LocationNo,名稱Name工作介質(zhì)Medium驅(qū)動機(jī)類型Typeofdriver傳動方式Transmissionmode執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽字/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)器及附件接收AcceptanceofmachineaccessoriesC
基礎(chǔ)復(fù)查CheckoffoundationC機(jī)泵安裝InstallationofmachineandpumpCR灌漿前檢查InspectionbeforegroutingA拆洗及回裝Disassembling,cleaningandreassemblingC(CR)聯(lián)軸節(jié)對中CenteringofcouplersB傳動裝置檢查TransmissiongearC潤滑油系統(tǒng)檢查、注油LubricationsysteminspectionandoilingC冷卻、密封系統(tǒng)檢查CoolingandsealingsystemC試運(yùn)轉(zhuǎn)TestrunAR找正偏差A(yù)lignmentdeviation對中偏差Centeringdeviation位置Location允差Tolerance0°-180°90°—270°配管前Beforepipeassembling配管后Afterpipeassembling水平Horizontal位置Location允差Tolerancea1a2a3a4ala2a3a4中心center徑向Radial標(biāo)高Elevation軸向Axial試運(yùn)轉(zhuǎn)Testtemp介質(zhì):Medium持續(xù)時間:Timeduration從驅(qū)動機(jī)方向讀數(shù):Readingindirectionofdriveri8!百分表固定端:Fixedendofdialindicatora44a2聯(lián)軸節(jié)間距:mmSpacingofcouplers丁a3機(jī)器軸承溫度:。cMachinebearingtemp。刖:Front后:Rear驅(qū)動機(jī)軸承溫度:cDriverbearingtemp。刖:Front后:Rear壓力:MPaPressure進(jìn):In出:Outa=tg=£電流溫升:cMotortemporise電流(啟動/運(yùn)轉(zhuǎn)):ACurrent(starting/running)La備注:Remarkse表H-202Tab.機(jī)組安裝工序質(zhì)量控制表Qualitycontroltableformachineandpumpinstallingprocedure項目:Project裝置:Unit工號:Section位號名稱LocationNo。Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution驅(qū)動機(jī)Driver主機(jī)Hostmachine種類Type型號Model種類Type型號Model功率Power轉(zhuǎn)速Rottingspeed介質(zhì)Medium檢查項目等級簽字/日期Signature/Date
InspectionitemGrade施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)組及附件接收AcceptanceofmachineaccessoriesC基礎(chǔ)復(fù)查CheckoffoundationC機(jī)組安裝InstallationofmachineandpumpAR灌漿前檢查InspectionbeforegroutingAR聯(lián)軸節(jié)對中CenteringofcouplerAR機(jī)組安裝完整性確認(rèn)IntegrityofmachinesetinstallationB機(jī)組拆檢組裝情況Disassembling,inspectingandassemblingofmachinesetCR油系統(tǒng)沖洗FlushingofoilsystemA油系統(tǒng)整定SettingofoilsystemB冷卻系統(tǒng)CoolingsystemC冷凝真空系統(tǒng)CondensingvacuumsystemB控制和保護(hù)系統(tǒng)ControlandprotectionsystemB盤車裝置系統(tǒng)IdlerotatingdeviceC試運(yùn)轉(zhuǎn)TestrunAR加注油情況Oilingcondition部位Location油標(biāo)號Markofoil合格證號CertificateNo。注油數(shù)量Oilingquantity簽名/日期Signature/Date備注:Remarks表H-203Tab。機(jī)組安裝找正記錄Alignmentrecordforinstallationofmachineset項目:Project裝置:Unit工號:Section位號LocationNo名稱Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution項目Item允許偏差(mm)Tolerance實際偏差(mm)Actualdeviation標(biāo)高Elevation中心線Centerline縱向Longitudinal橫向Transverse水平測量(mm/m)Leveling12345678910縱向Longitudinal允許值A(chǔ)llowablevalue
實測值Measuredvalue橫向Transverse允許值A(chǔ)llowablevalue實測值Measuredvalue附圖:Attacheddiagram承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector表H-204Tab.大型機(jī)械灌漿前檢查記錄Inspectionrecordbeforegrouting-oflargemachinery項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution隱蔽前檢查:Inspectionbeforeconcealing墊鐵:布置口接觸面口焊接口ShimsLayoutContactfaceWelding地腳螺栓口3。螺栓孔用基礎(chǔ)表面清洗口AnchoringBoltholeandfoundationsurfacecleanliness4。墊鐵規(guī)格:平墊鐵斜墊鐵SpecificationFlatshimsTaperedshims附圖:AttacheddiagramNo.hXnLNo.hXnLNo。hXnL施工人:Operator上項工程經(jīng)檢查符合設(shè)計(規(guī)范)要求,可以隱蔽。Theaboveworkconformingtotherequirementofdesign(code)maybeconcealed年月日
Date建設(shè)單位代表Ownerrepresentative承包單位代表Contractorrepresentative檢查員Inspector表H-205Tab。機(jī)器拆檢及組裝間隙測量記錄Clearancemeasurementrecordfordisassembling,inspectingandassemblingofmachine項目:Project裝置:Unit工號:Section位號LocationNo。名稱Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution間隙測量部位Clearancemeasuredlocation規(guī)定值(mm)Specifiedvalue拆前間隙(mm)Clearancebeforedisassembling組裝后間隙(mm)Clearanceafterassembling日期Date注:間隙測量部位另附圖(如果需要)。Note:Clearancemeasuredlocationhasdiagramattached(ifnecessary)o檢查員施工人
InspectorOperator表H—206Tab。位號LocationNo。電機(jī)空氣間隙測量記錄Airgapmeasurementrecordformotor項目:Project裝置:Unit工號:Section名稱Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution部位LocationInspectorOperator表H—206Tab。位號LocationNo。電機(jī)空氣間隙測量記錄Airgapmeasurementrecordformotor項目:Project裝置:Unit工號:Section名稱Name執(zhí)行標(biāo)準(zhǔn)Standardforexecution部位Location12345678910111213141516171819實測值Measuredvalue按定子上標(biāo)定的一點盤車檢查空氣間隙單位:(mm)Inspectionofairggpat,specifiedpoiptonthestatorbyidlerotatingUnit按定子上標(biāo)定的一點盤車檢查空氣間隙單位:(mm)Unit:部位Location12345678910實測值MeasuredvalueInspectionofairggpatspecifiedpgintonthes[atorbyidlerotating承包單位檢查員Inspector施工人Operator—透平試運(yùn)轉(zhuǎn)報告Test—runreportforturbine項目:Project裝置:Unit工號:Section位號LocationNo.機(jī)組名稱Nameofmachineset功率Power介質(zhì)名稱Nameofmedium介質(zhì)壓力PressureofmediumMPa介質(zhì)溫度TempoofmediumC額定轉(zhuǎn)速Ratedrotationalspeedr/min試車類型Typeoftest-run試車日期Dateoftest-run執(zhí)行標(biāo)準(zhǔn)Standardforexecution危急保安器試驗Testofemergencyprotectiondevice手動Manual自動Automatic時間Time轉(zhuǎn)速Speed(r/min)介質(zhì)Medium潤滑油Lubricant軸承溫度Bearingtemp.(C)軸振動(mm)Shaftvibration軸位移(mm)shaftdisplacement備注Remarks流量Flowrate溫度Temp.(°c)壓力Pressure(MPa)溫度Tempo(C)壓力Pressure(MPa)
進(jìn)In出Out進(jìn)In出Out進(jìn)In出Out進(jìn)In出Out、八刖Front后Rear試運(yùn)轉(zhuǎn)結(jié)果Resultoftest—run承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector表H—210Tab。大型軸流風(fēng)機(jī)安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresoflargeaxialflowblower項目:Project裝置:Unit工號:Section位號LocationNo.傳動方式Modeoftransmission名稱Name執(zhí)Stand行標(biāo)準(zhǔn)[ardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)器及附件接收AcceptanceofmachineandaccessoriesC基礎(chǔ)復(fù)查CheckoffoundationC機(jī)器安裝InstallationofmachineCR驅(qū)動機(jī)對中AlignmentofdriverC灌漿前檢查InspectionbeforegroutingA風(fēng)筒安裝InstallationofwindductC傳動裝置檢查TransmissiongearC翼片安裝CR
Fittingofblade潤滑部位檢查、注油LubricationsysteminspectionandoilingC電機(jī)轉(zhuǎn)向檢彳Rotatingdire查ctionofmotorC試運(yùn)轉(zhuǎn)Test—run持續(xù)時間DurationhAR電機(jī)軸承溫度Motorbearingtemp.°C風(fēng)機(jī)軸承溫度Blowerbearingtemp?!鉉電機(jī)定子溫升Motorstatortemp。riseC結(jié)果Result找正偏差A(yù)lignmentdeviation翼片安裝Fittingofblade允差Tolerance0°-180°90°—180°垂直度(mm/m)Verticalitv翼片角度偏差Bladeangledeviation1234中心(mm)Center標(biāo)高(mm)Elevation翼片間隙(mm)Clearanceatbladetip最大Max。最小Min附注:"Note表H—211Tab.立式攪拌器安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresofverticalagitator項目:Project裝置:Unit工號:Section位號LocationNo。名稱Name工作介質(zhì)Medium執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)械及附件接收AcceptanceofmachineandaccessoriesC支架(支架法蘭)安裝InstallationofsupportC容器與攪拌器法蘭墊片安裝SettingflangegasketsofvesselandagitatorC找正AlignmentCR皮帶輪平行度確認(rèn)ParallelismofbeltpulleyB齒輪箱內(nèi)部清潔度確認(rèn)CleanlinessingearboxC注油(脂)Oiling(greasing)C
冷卻、密封系統(tǒng)檢查CoolingandsealingsystemCR電機(jī)轉(zhuǎn)向確認(rèn)RotatingdirectionofmotorC試運(yùn)轉(zhuǎn)Test-runAR11;i!找正記錄Alignmentrecordammbmm垂直度Verticalitymm/mii乎備注:Remarks表H-212Tab。空調(diào)系統(tǒng)安裝工序質(zhì)量控制表Qualitycontroltableforinstallingairconditionersystem項目:Project裝置:Unit工號:Section位號LocationNo。型號Model制造廠Manufacturer制冷量Refrigerationoutput制冷劑Refrigerant執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機(jī)械及附件接收AcceptanceofmachineandaccessoriesC基礎(chǔ)及預(yù)留孔復(fù)查Checkoffoundation&providedholesC主機(jī)及附件安裝Installationofhostmachine&accessoriesC內(nèi)部清潔度確認(rèn)InteriorcleanlinessB機(jī)器拆卸、清冼Disassembling&cleaningofmachineB氣密性試驗Air-tightnesstestB充填制冷劑FillingrefrigerantA制冷劑系統(tǒng)檢漏LeakagecheckofrefrigerantsystemA
風(fēng)管及部件制作安裝Fabrication&erectionofventduct&partsC風(fēng)管內(nèi)部清理CleaningofventductinteriorC冷卻水管道安裝InstallationofcoolingwaterpipelineC試運(yùn)轉(zhuǎn)Test—runAR附注:Note表H—215Tab。容器、換熱器安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresofconveyingmachine項目:Project裝置:Unit工號:Section位號LocationNo。名稱:Name規(guī)格Specification材質(zhì)Material工作介質(zhì)Medium壓力MPaPressure溫度Temperature執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備及附件接收檢查Acceptanceofequipment&accessoriesC基礎(chǔ)復(fù)位CheckoffoundationC找正AlignmentC灌漿前檢查InspectionbeforegroutingA內(nèi)件安裝InstallationofinternalsA嚴(yán)密性試驗Air—tightnesstestAR抽芯試壓CorewithdrawalandpressuretestAR附件安裝InstallationofaccessoriesC平臺、扶梯、護(hù)攔安裝Erectionofplatform,stair&guardrailC臥式設(shè)備滑動端檢查CheckofslidingendofhorizontalequipmentB附注:Note表H-216Tab。分段塔組對]工序質(zhì)量控制表1項目:Project裝置:UnitQualitycontroltableiorassemblingsectionedcolumn工號:Section位號LocationNo.設(shè)備名稱:Nameofequipment規(guī)格Specification材質(zhì)Material設(shè)計壓力MPaDesignpressure設(shè)計溫度Designtemp。工作介質(zhì)Medium執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature組對記錄Assemblingrecord施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備材料接收Acceptanceofequipment&materialC方位偏差Orientationdeviation焊接及焊工資格認(rèn)定Weldingprocess&welder’squalificationB直線度偏差Straightnessdeviation組對檢查AssemblinginspectionCR長度偏差Lengthdeviation焊縫外觀VisualinspectionofweldB最大錯邊量Max。edgemismatch無損檢測Non-destructivetestingAR圓度偏差Roundnessdeviation焊縫熱處理Heat—treatmentofweldBR壓力試驗Pressuretest介質(zhì)Medium壓力(MPa):Pressure時間(Min)DurationAR附注:Note塔類安裝工序質(zhì)量控制表Qualitycontroltableforcolumntypeequipment項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name規(guī)格Specification材質(zhì)Material介質(zhì)Medium壓力Pressure溫度Temperature執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature垂直偏差(mm)Vertical施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備及附件接收Acceptanceofequipment&accessoriesC0—180°:基礎(chǔ)復(fù)查CheckoffoundationC方位確認(rèn)AffirmationoforientationC90-270°:找正AlignmentCR灌漿前檢查InspectionbeforegroutingA/AR塔盤安裝InstallationofcolumntrayAR附件安裝InstallationofaccessoriesC平臺、扶梯、護(hù)欄檢查Checkofplatform,stair&guardrailC裝填料PackingoffillersAR封閉前檢查InspectionbeforeenclosingA基礎(chǔ)沉降觀測ObservationoffoundationsettlementAR備注:Remarks塔盤安裝記錄項目ProjectRecordforinstallingcolumntray裝置:Unit工號:Section位號LocationNo.匚作介質(zhì)Medium名稱Name1I設(shè)計壓力Designpressure規(guī)格Specification1I設(shè)計溫度Designtemp.材質(zhì)Material寸S丸行標(biāo)準(zhǔn)Standardforexecution塔盤編號TrayNo。塔盤支承圈水平度Levelnessoftraysupportingring(mm)隆液板至塔板間距Distancefromliquiddroppingboardtocolumntray(mm)塔盤水平度Levelnessofcolumntray(mm/m)溢流堰高偏差Spillwayheightdeviation(mm)溢流堰水平度Levelnessofspillway(mm/m)塔盤充水鼓泡試驗結(jié)果Resultofbubblingtestwithwaterfilling備注Remarks允許值A(chǔ)llo—wablevalue實測值Mea—suredvalue允許值A(chǔ)llo—wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue允許值A(chǔ)llo—wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector表H—219Tab。設(shè)備填充記錄Packingrecordofequipment項目:Project裝置:Unit
工號:Section位號LocationNo.名稱Name填充部位Packinglocation填充物Packing規(guī)格/型號Specification/model材質(zhì)Material數(shù)量Quantity填充方法Packingmethod備注:Remarks承包單位代表Contractorrepresentative施工匚單位施工人Operator建設(shè)單位代表OwnerrepresentativeSubcontractor檢查員Inspector表H-220Tab.火炬、排氣筒安裝工序質(zhì)量控制表Qualitycontroltableforerectionofflareandexhaustshaft項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name規(guī)格Specification材質(zhì)Material設(shè)計溫度。CDesigntemp。執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級_Grade簽名/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner材料接收AcceptanceofmaterialC焊接工藝及焊工資格認(rèn)定WeldingprocessandweldersqualificationB*
基礎(chǔ)復(fù)查CheckoffoundC鋼架幾何尺寸檢查InspectionofdimensionsofsteelframeCR焊接前檢查InspectionbeforeweldingC焊縫外觀檢查VisualinspectionofweldC焊縫無損檢測Non-destructivetestingofweldBR鋼架焊接檢查WeldsofsteelframeC火炬頭檢查InspectionofflareheadA安裝Erection吊裝前檢查InspectionbeforehoistingC標(biāo)高中心線方位確認(rèn)Affirmationofelevation¢erlineorientationC垂直度檢查InspectionofverticalityCR灌漿前檢查InspectionbeforegroutingA垂直偏差(mm)Verticaldeviation0°?180°90°~270°附注:Note表H-221Tab。大型儲罐組裝工序質(zhì)量控制表Qualitycontroltableforassemblinglargestoragetank項目:Project裝置:Unit工號:Section位號LocationNo。名稱Name規(guī)格Specification材質(zhì)Material工作介質(zhì)Medium設(shè)計壓力MPaDesignpressure設(shè)計溫度。cDesigntemp.執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner材料接收AcceptanceofmaterialC焊接工藝及焊工資格認(rèn)定Weldingprocessandwelder’squalificationB基礎(chǔ)復(fù)查CheckoffoundationC幾何尺寸檢查GeometricdimensionsCR開孔方位檢查OpeningorientationC
焊縫外觀檢查VisualinspectionofweldC無損檢測Non—destructivetestingBR梯子、平臺、欄桿、附件檢查Ladder,platform,handrail&accessoriesC封閉前檢查InspectionbeforeenclosingA安全閥、呼吸閥檢查Safety&breathingvalueB罐底嚴(yán)密性試驗Air—tighttestoftankbottomA罐體強(qiáng)度試驗TankbodystrengthtestA罐體嚴(yán)密性試驗Air-tighttestoftankbodyA單盤板、內(nèi)浮盤板嚴(yán)密性試驗Air-tighttestofsingletrayandinnerfloatingtrayA船艙嚴(yán)密性試驗Air-tighttestofcabinA焊縫試漏檢查LeakagetestofweldA穩(wěn)定性試驗StabilitytestA升降試驗Ascending&descendingtestA基礎(chǔ)沉降觀測ObservationoffoundationsettlementAR幾何尺寸檢查記錄Inspectionrecordofgeometricdimensions(mm)檢查部位Inspectionlocation允差Tolerance偏差Deviation罐體高度Tankheight罐底底圈水平半徑Radiusoftankbottomcircle罐底局部凹凸度Tankbottomlocalunevenness罐壁垂直度(mm/m)Tankwallverticality罐壁內(nèi)表面局部凹凸度Internalwallsurfaceunevenness單頂浮盤板局部凹凸度Signalrooffloatingtraylocalunevenness內(nèi)浮頂內(nèi)浮盤板局部凹凸度Internalfloatingroofinnerfloatingtraylocalunevenness拱頂局部凹凸度Domerooflocalunevenness備注:Remarks表H-223Tab。安裝工業(yè)爐安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresoftubularindustrialfurnace項目:Project裝置:Unit工號:Section位號LocationNo。名稱Name能力Capacity設(shè)計溫度。cDesigntemp。設(shè)計壓力MPaDesignpressure燃料種類Kindoffuel執(zhí)行標(biāo)準(zhǔn)Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備及材料接收Acceptanceofequipment&materialC基礎(chǔ)復(fù)查CheckoffoundationC爐體找正AlignmentoffurnacebodyC柱灌漿前檢查InspectionofcolumnfootingbeforegroutingA
墻板安裝ErectionofwallpanelB預(yù)焊件焊接WeldingofpreweldedcomponentB焊接工藝及焊工資格認(rèn)定Weldingprocessandwelder’squalificationB輻射管安裝InstallationofradiationtubeC集氣管安裝InstallationofheaderC對流管安裝InstallationofconvectiontubeC無損探傷Non-destructivetestAR焊縫熱處理Heat-treatmentofweldBR吊架調(diào)整AdjustmentofhangerB脹管ExpandingtubeCR壓力試驗PressuretestAR燒嘴及其它輔件安裝InstallationofburnerandaccessoriesC烘爐前檢查InspectionbeforedryingoffurnaceA試驗部位Testlocation強(qiáng)度試驗Strengthtes嚴(yán)格密試驗Air—tighttest結(jié)果Result日期Date介質(zhì)Medium壓力Pressure(MPa)時間Duration(min)介質(zhì)Medium壓力Pressure(MPa)時間Duration(min)備注:remarks表H—224Tab.脹管記錄Recordofexpandedtube項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name部位Location管材Tubematerial硬度Hardness選定脹管率范圍Selectedrangeofexpansionrate板材Platematerial硬度Hardness執(zhí)行標(biāo)準(zhǔn)Standardforexecution編號CodeNo。管板Tubeplate爐管Boilertube脹管Expandedtube脹口Expandedmouth爐管Boilertube孔徑(mm)Borediam.外徑(mm)Exterdiam.內(nèi)徑(mm)Interdiam.要求脹(mIntediam.afterex后內(nèi)徑im)rnalreq。panding實測(mm)Measured最大Max。最小Min.內(nèi)徑管端伸長度翻邊長度內(nèi)壁檢查
檢查員Inspector施工人Operator表H-225Tab。鋼結(jié)構(gòu)安裝工序質(zhì)量控制表Qualitycontroltableforerectionofsteelstructure項目:Project裝置:Unit工號:Section結(jié)構(gòu)號材質(zhì)執(zhí)行標(biāo)準(zhǔn)StructureNo.MaterialStandardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner基礎(chǔ)復(fù)查CheckoffoundationC材料接收檢查AcceptanceofmaterialC預(yù)制PrefabricationC安裝ErectionCR灌漿前檢查InspectionbeforegroutingA
平臺、扶梯、欄桿檢查Platform,stair&handrailC焊縫檢查InspectionofweldsB構(gòu)件接觸面檢查CheckforcontactfaceofcomponentA高強(qiáng)螺栓檢查High—strengthboltA立柱編號ColumncodeNo。偏差值(mm)Deviationvalue梁編號BeamcodeNo。偏差值(mm)Deviationvalue對角線Diagonal垂直度Verticality中心Center間距Spacing標(biāo)高Elevation水平Level中心Center間距Spacing0—18090-270表H-226Tab.筑爐工序質(zhì)量控制表Qualitycontroltableforconstructionproceduresoffurnacelaying項目:Project裝置:Unit工號:Section位號名稱執(zhí)行標(biāo)準(zhǔn)LocationNo.NameStandardforexecution檢查項目Inspectionitem等級Grade簽名
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 保險業(yè)務(wù)風(fēng)險管理與防范手冊
- 食品飲料生產(chǎn)衛(wèi)生規(guī)范手冊
- 水利工程建設(shè)監(jiān)理規(guī)范手冊
- 信息化項目管理與監(jiān)控手冊
- 2026上海市公共衛(wèi)生臨床中心人員招聘50人備考題庫附參考答案詳解(考試直接用)
- 2026四川省紅十字基金會招聘工作人員1人備考題庫含答案詳解ab卷
- 2026中煤環(huán)保公司徐州分公司社會招聘工作人員59人備考題庫含答案詳解(典型題)
- 企業(yè)內(nèi)部控制制度手冊更新手冊
- 城市燃?xì)夤艿谰S護(hù)與故障處理手冊
- 2026上半年湖南長沙市政府專職消防員招聘260人備考題庫及答案詳解1套
- 2025保險消??荚囶}及答案
- 化妝品銷售后的培訓(xùn)課件
- 2025至2030中國EB病毒檢測行業(yè)標(biāo)準(zhǔn)制定與市場規(guī)范化發(fā)展報告
- 2026中國電信四川公用信息產(chǎn)業(yè)有限責(zé)任公司社會成熟人才招聘備考題庫及答案詳解1套
- 2026年湖北大數(shù)據(jù)集團(tuán)有限公司招聘備考題庫及完整答案詳解1套
- 《市場營銷(第四版)》中職完整全套教學(xué)課件
- 護(hù)士長崗位面試題目參考大全
- 機(jī)場旅客服務(wù)流程與技巧詳解
- 中國地質(zhì)大學(xué)武漢本科畢業(yè)論文格式
- 單層工業(yè)廠房標(biāo)底
- YY/T 0708-2009醫(yī)用電氣設(shè)備第1-4部分:安全通用要求并列標(biāo)準(zhǔn):可編程醫(yī)用電氣系統(tǒng)
評論
0/150
提交評論