下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
[電氣預(yù)埋規(guī)范]電氣預(yù)埋管圖集[電氣預(yù)埋規(guī)范]電氣預(yù)埋管圖集電氣埋管施工工藝細(xì)則Electricalconduitconstructiontechnologyrules1.嚴(yán)禁使用電焊、氣焊割管。Strictlyprohibitedinusinggasandelectricweldingcuttingconduit.2.嚴(yán)禁將腳手架作為電纜管使用。Strictlyprohibitedinusingthefolderaselectricalconduit.3.銹蝕嚴(yán)重的鋼管不得使用;鋼管彎制或安裝前應(yīng)將管口及管內(nèi)雜物清掃干凈,并除去毛刺。Existseriouscorrosionconduitisnotallowedused;themouseoftheconduitastheinnerpartthedepismustberemovedbeforebendingorinstallation3.電纜管切割采用手工鋸或切割機(jī)進(jìn)行切割,并保證切割面平整且不傾斜;切割后必須立即將管口毛刺打磨干凈,并打磨管口成喇叭型。Cuttingfortheconduitadoptinginmanualsawormachine,andensurethecuttingsurfacesmoothandnottilt;burringaftercuttingmustbeimmediately,andpolishedtypenozzleintohorn.4.電纜管的彎曲半徑R≥10D(電纜管外徑);彎曲角度≥90°,并盡可能減少90°彎頭;電纜管彎制不得出現(xiàn)明顯的凹癟、裂紋、折皺,鋼管彎扁程度≤0.1D(電纜管外徑)。BendingradiusR≥10D(hereDisconduitoutdiameter);BendingAngle≥90°,andaslessaspossiblethe90°elbow;conduitbendingcannotappearobviousconcave,crack,wrinkle,flatsteeltubebendingflatlevel≤0.1D(hereDisconduitoutdiameter).6.電纜管安裝時(shí),每根電纜管彎頭數(shù)量不得超過3個(gè),90°彎頭不得超過2個(gè)(埋管長度≥12米,不得多于2個(gè)彎頭;12米≥埋管長度≥8米,不得多于3個(gè)彎頭;直管埋設(shè)不得大于30米)超過上述標(biāo)準(zhǔn)須增加轉(zhuǎn)接盒。Wheninstallationconduit,theamountofeachconduitelbowshallnotexceed3,elbowwith90°shallnotbemorethan2;theconduitlength≥12m,shallnotbemorethantwoelbow;Thelengthoftheconduitthatchangedbetween8mand12m,shallnotbemorethanthreeelbow;straightshallnotbemorethan30meters;Ifexceedthestandardmorethanthestandardmustincreasethetransferbox.7.電纜管連接不得對(duì)接焊,必須采用短套管;套管長度≥50mm;whenconduitconnectionashortsocketmustbeused,andnobuttwelding(exceptWhencoupling,thereshouldn’tgapbetweenthetwoconduitandthecounterpartmalocclusionislessthan2mm,counterpartseamshouldbeinthemiddleofthesocket,andthebothsidesalongthecircumferentialweldingsealing,partialcannotweldingmustuseblacktapewindingsealingwithfastenedironwire;9.電纜管不得在外壁直接點(diǎn)焊加固,加固采用鐵絲綁扎或煨制鋼筋成環(huán)鉤加固、切割20~30mm套管套至固定點(diǎn)進(jìn)行,固定間距:φ15~φ20為1.0~1.5米,φ25~φ32為1.5~2.0米,φ40~φ50為2.0~2.5米,φ65以上不大于3米。Potweldingreinforcecan’tbeallowedoutsidethewallofconduitdirectly,aavailablesteelbarwillbemadeintoaringhook,andthencutting20~30mmoneendfastentoconduitanotheronestablepointorironwirecolligationfixedspacing:φ15mm~20mmis1.0~1.0m,from25mmto32mmis1.5~1.5meters,40mm~50mmis2.0~2.5meters,exceed65mmnotmorethan3meters10.電纜管與接線盒的連接可采用焊接和絲扣連接,:電纜管伸入接線盒3~6mm管口用黑膠布包扎結(jié)實(shí),接線盒內(nèi)用濕棉紗、破布填實(shí);外部用黑膠布纏繞,以防止水泥沙漿進(jìn)入。Weldingandthreadedcanbeusedfortheconnectionbetweenelectricalconduitandsockets,electricalconduitareputtedintothesockets3~6mmThemouseoftheconduitwithblackadhesivebandage,internalpartsofthesocketfilledwithawetcottonyarn,cloth;Externalwithblacktapewinding,inordertopreventcementmortarhavingaaccessinto.11.接線盒安裝時(shí)必須與模板緊貼,并用鋼筋在接線盒四周加固;電纜管直徑≤DN25的指明及消防報(bào)警預(yù)埋管放置于模板與鋼筋網(wǎng)之間,預(yù)埋管綁扎在鋼筋網(wǎng)上,與模板之間預(yù)留間隙≥15mm;電纜管在接線盒處的固定點(diǎn)與接線盒間距不得大于200mm。Socketmustbeclingytothetemplateandreinforcedaround,othesocketsofthecablemustbeweldingwithacrossbar(from6or8mmroundsteel;12.所有外露預(yù)留的電纜管及伸入分電箱、木制接線盒等管口應(yīng)伸出砼面200mm以上,電纜管口必須封堵。續(xù)接管路用膠布封口后加套帽。Allthereservedoutsideelectricalconduitandthoseintothedistributionbox,andwoodenboxshouldstretchouttheconcreteover200mm,addingironplateweldingseal,steelplatewithcuttingmachineandsmooth.Thecontinuedjacketedpipesetacoveraftersealingwithtape.13.電纜管過縫制作:采用在電纜管外套比電纜管外徑大兩級(jí)套管,套管與電纜管口部密實(shí)封堵,電纜管套管制作規(guī)格,長度如下:Manufactureforexpansionjoint,adoptingthetwolevelsofcasingpipecoatthanelectricalconduitdiameter,firstwindinglinenbetweencasingandelectricalconduitthenfillingwithas
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 婦產(chǎn)科護(hù)理與分娩支持
- 《長方體和正方體的認(rèn)識(shí)》數(shù)學(xué)課件教案
- 天工大針織學(xué)課件第2篇 針織物組織與產(chǎn)品設(shè)計(jì)第9章 賈卡提花經(jīng)編織物及產(chǎn)品設(shè)計(jì)
- 企業(yè)安全員工作總結(jié)7篇
- 主管級(jí)保險(xiǎn)業(yè)務(wù)知識(shí)考試題庫
- 2025黑龍江省農(nóng)業(yè)投資集團(tuán)有限公司選聘12人筆試參考題庫附帶答案詳解(3卷合一版)
- 2025重慶鐵路綜合交通樞紐有限公司招聘12人筆試參考題庫附帶答案詳解(3卷合一版)
- 2025遼寧撫順市龍晟保安服務(wù)有限責(zé)任公司招聘20人筆試參考題庫附帶答案詳解(3卷合一版)
- 2025福建西海岸建筑設(shè)計(jì)院有限公司下半年招聘26人筆試參考題庫附帶答案詳解(3卷合一版)
- 2025福建省青山紙業(yè)股份有限公司秋季招聘14人筆試參考題庫附帶答案詳解(3卷)
- 財(cái)務(wù)給銷售培訓(xùn)銷售知識(shí)課件
- 益生元管理師高級(jí)考試試卷與答案
- 特種作業(yè)安全工作培訓(xùn)課件
- 住宅電梯更新項(xiàng)目可行性研究報(bào)告
- 廣東省廣州市天河區(qū)2023-2024學(xué)年七年級(jí)上學(xué)期期末道德與法治試題(含答案)
- 2024-2025學(xué)年塔里木職業(yè)技術(shù)學(xué)院單招《英語》考前沖刺練習(xí)試題附答案詳解【培優(yōu)B卷】
- 手榴彈使用課件
- 《新聞學(xué)概論》試卷及答案
- 工會(huì)勞動(dòng)爭議調(diào)解會(huì)議記錄范本
- 2025年數(shù)字化營銷顧問職業(yè)素養(yǎng)測(cè)評(píng)試卷及答案解析
- 2025年保密試題問答題及答案
評(píng)論
0/150
提交評(píng)論