版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
地塊二期(XSCQ020207-01)項目一標段
地鐵保護專項施工方案
中國建筑第八工程局有限公司
2O2x年x月
地塊二期(XSCQ020207-01)項目
7.3材料投入計劃60
第八章主要施工方案.............................................................................50
目錄8.1測量及垂直度測控方案.....................................................................50
第一章綜合編制說明..............................................................................18.2樁基工程施工方案........................................................................52
圍護工程施工方案........................................................................
l.i編制說明..................................................................................18.360
降水施工方案............................................................................
1.2編制依據(jù)..................................................................................18.482
1.3國家和地方主要法律法規(guī)、標準、規(guī)范........................................................18.5基坑監(jiān)測施工方案........................................................................89
8.6土方開挖施工方案........................................................................94
第二章工程概況..................................................................................
28.7基坑支撐及拆撐方案......................................................................100
2」項目總體概況................................................................................28.8水沖法施工方案.........................................................................105
2.2設計概況..................................................................................3
第九章季節(jié)性施工方案..........................................................................107
2.4項目周邊環(huán)境情況........................................................................17
臺風及雨季施工方案......................................................................
2.5地下建(構)筑物及管線情況..............................................................189.1107
冬季施工方案............................................................................
2.6運營地鐵及隧道情況......................................................................209.2109
第三章工程水文地質(zhì)情況.........................................................................22第十章質(zhì)量保證措施............................................................................112
工程質(zhì)量目標..........................................................................
3.1場區(qū)氣候條件.............................................................................2210.1112
質(zhì)量管理組織機構......................................................................
3.2工程地質(zhì)條件............................................................................2210.2112
質(zhì)量管理機構及人員職責.................................................................
3.3水文地質(zhì)條件............................................................................2210.3112
質(zhì)量管理制度..........................................................................
3,4地下結構與地層相對位置情況..............................................................2310.4112
10.5技術管理的組織保證措施.................................................................113
第四章施工組織管理.............................................................................24
10.6質(zhì)量管理重難點分析及保證措施...........................................................114
4.1項目管理目標.............................................................................24
第十一章安全文明保證措施......................................................................115
4.2項目組織架構與職責分工..................................................................24
」安全生產(chǎn)目標.............................................................................
4.3施工總部署...............................................................................2711115
11.2安全生產(chǎn)保證體系......................................................................115
第五章基坑圍護針對地鐵保護的設計措施、施工要求.................................................
3511.3項目各部門、人員安全管理職責...........................................................115
5.1地鐵保護區(qū)圍護設計方案..................................................................35工1.4安全管理制度.............................................................................116
5.2地鐵保護區(qū)立柱樁/格構柱設計方案..........................................................351L5安全管理重難點分析.......................................................................116
5.3地鐵保護專篇............................................................................351L6主要危險源分析及控制方式.................................................................116
5.4TRD渠式切割水泥土攪拌墻施工要求.........................................................351L7安全管理措施.............................................................................116
5.5地下連續(xù)墻施工要求......................................................................351L8施工用電安全.............................................................................118
5.6降水施工要求.............................................................................3611.9深基坑施工安全措施.....................................................................118
5.7土方開挖施工要求........................................................................3611.10現(xiàn)場職業(yè)健康安全管理..................................................................119
5.8基坑監(jiān)測施工要求........................................................................37
第十二章工期保證措施..........................................................................121
5.9中隔地連墻拆除施工要求..................................................................38
保證進度目標措施......................................................................
5.10其他地鐵相關保護措施...................................................................3812.1121
施工部署保證措施......................................................................
5.11地鐵隧道內(nèi)病害預整治要求...............................................................3912.2121
12.3組織保證措施..........................................................................121
第六章施工階段對地鐵盾構隧道的保護措施.........................................................
4012.4管理保證措施..........................................................................121
6.1保護地鐵盾構隧道的重要性................................................................4012.5工期管理制度..........................................................................122
6.2保護地鐵戊構隧道的安全控制指標...........................................................4012.6技術保證措施..........................................................................122
6.3對施工前預評估的響應措施................................................................4212.7經(jīng)濟保障措施..........................................................................122
6.4地鐵保護區(qū)內(nèi)基坊施工順序................................................................4312.8合同保證措施..........................................................................123
6.5TRD施工的地鐵保護措施...................................................................4412.9資源保證措施..........................................................................123
6.6地下連續(xù)墻施工的地鐵保護措施............................................................4412.10夜間施工保證措施.....................................................................123
6.7工程樁施工的地鐵保護措施................................................................4512.11農(nóng)忙期間施工保證措施..................................................................124
6.8降水施工的地鐵保護措施..................................................................4612.12針對節(jié)假日、政府重大活動期間的施工安排及保證措施.....................................124
6.9土方開挖的地鐵保護措施..................................................................4612.13季節(jié)性連續(xù)施工保證措施................................................................124
6.10支撐結構拆除的地鐵保護措施.............................................................46
第十三章附圖..................................................................................125
6.11多方聯(lián)動機制............................................................................46
各施工階段場地平面布置圖...............................................................
6.12應急預案................................................................................4713.1125
13.2施工總進度計劃........................................................................130
第七章資源配置計劃.............................................................................
5413.3管線分布與地下障礙圖...................................................................134
7.1勞動力投入計劃..........................................................................5413.4安評報告...............................................................................135
7.2施工機械投入計劃........................................................................57
中國建筑第八工程局有限公司
品CHRACONSTRUOONt?GHTNINGMHNNGDMSK)NCOIVXT?
餐塊二期(XSCQ020207-01)項目
第一章綜合編制說明23行業(yè)規(guī)范《渠式切割水泥土連續(xù)墻技術規(guī)程》JGJ/T303-2013
24行業(yè)規(guī)范《建筑施工土石方工程安全技術規(guī)范》JGJ180-2009
25行業(yè)規(guī)范《建筑工程冬期施工規(guī)程》JGJ104-2011
1.1編制說明
26行業(yè)規(guī)范《建筑機械使用安全技術規(guī)程》JGJ33-2012
蕭政儲出[2021]33號地塊二期(XSCQ020207-01)項目(下簡稱杭州SKP項目)位于市心27行業(yè)規(guī)范《施工現(xiàn)場臨時用電安全技術規(guī)范》JGJ46-2005
北路與盈豐路交接處,基坑內(nèi)含部分區(qū)域于杭州地鐵2號線50米保護區(qū)范圍內(nèi)。為確保施工
28行業(yè)規(guī)范《建筑施工安全檢查標準》JGJ59-2011
全過程中不對杭州地鐵2號線既有線路產(chǎn)生任何不利影響,特編制此方案指導現(xiàn)場施工。
29行業(yè)規(guī)范《建筑基坑支護技術規(guī)程》JGJ120-2012
1.2編制依據(jù)
30行業(yè)規(guī)范《建筑樁基技術規(guī)范》JGJ94-2008
1工程現(xiàn)有圖紙等建設方給予的所有資料;工程應用的主要規(guī)范、規(guī)程;31行業(yè)規(guī)范《鋼筋焊接及驗收規(guī)程》JGJ18-2012
2本工程所采用的規(guī)范、規(guī)程包括工程建設國家標準、建筑工程行業(yè)標準、浙江省地方32行業(yè)規(guī)范《建筑基樁檢測技術規(guī)范》JGJ106-2014
標準、IS09001質(zhì)量管理。33行業(yè)規(guī)范《鋼筋機械連接技術規(guī)程》JGJ107-2016
1.3國家和地方主要法律法規(guī)、標準、規(guī)范34行業(yè)規(guī)范《鋼筋焊接接頭試驗方法標準》JGJ/T27-2014
35行業(yè)規(guī)范《建筑地基處理技術規(guī)范》JGJ79-2012
表1.37國家規(guī)范、標準
36地方標準《建筑地基基礎設計規(guī)范》DB33/T1136-2017
序號類別標準名稱標準編號37地方標準《建筑基坑工程技術規(guī)程》DB33/T1096-2014
國家規(guī)范
1《工程測量規(guī)范》GB50026-200738地方標準《城市軌道交通結構安全保護技術規(guī)程》DB33/T1139-2017
2國家規(guī)范《建筑地基基礎工程施工質(zhì)量驗收標準》GB50202-2018國家行政《住房城鄉(xiāng)建設部辦公廳關于進一步加強為香
39建辦質(zhì)[2017]39號
3國家規(guī)范《建筑工程施工質(zhì)量驗收統(tǒng)一標準》GB50300-2013文件型加大的分部分項工程安全管理的通知》
GB50010-2010(2015年國家行政《關于印發(fā)起重機械、基坑工程等五項危險性
4國家規(guī)范《混凝土結構設計規(guī)范》40建安辦函[2017]12號
版)文件較大的分部分項工程施工安全要點的通知》
5國家規(guī)范《混凝土結構工程施工質(zhì)量驗收規(guī)范》GB50204-2015國家行政
41《危險性較大的分部分項工程安全管理規(guī)定》住建部37號文
6國家規(guī)范《混凝土結構耐久性設計標準》GB/T50476-2019文件
7國家規(guī)范《工業(yè)建筑防腐設計標準》GB/T50046-2018《住房城鄉(xiāng)建設部辦公廳關于實施(危險性加
國家行政
8國家規(guī)范《建筑結構荷載規(guī)范》GB50009-201242大的分部分項工程安全管理規(guī)定)有關問題的建辦質(zhì)【2018】31號令
文件
9國家規(guī)范《建筑地基基礎設計規(guī)范》GB50007-2011通知》
10國家規(guī)范《建筑邊坡工程技術標準》GB50330-2013地方行政《關于進一步加強房屋建筑和市政工程神解控
43浙江省建發(fā)【2015】207號
11國家規(guī)范《建筑基坑工程監(jiān)測技術規(guī)范》GB50497-2019文件施工安全管理工作的通知》
12國家規(guī)范《建筑地基基礎工程施工規(guī)范》GB1004-2015蕭政儲出[2021]33號地塊二期(XSCQ020207-
44勘察報告/
13國家規(guī)范《鋼結構設計標準》GB50017-201701)項目詳細勘察報告
14國家規(guī)范《鋼結構工程施工質(zhì)量驗收標準》GB50205-2020蕭政儲出[2021]33號地塊二期(XSCQ020207-
45設計文件/
15國家規(guī)范《巖土錨桿噴射混凝土支護技術規(guī)范》GB50086-201501)項目樁基圍護圖紙
16國家規(guī)范《鋼結構焊接規(guī)范》GB50661-201146公司經(jīng)驗我局相關類似工程施工承包的經(jīng)驗和總結/
17國家規(guī)范《建筑工程施工現(xiàn)場供用電安全規(guī)范》GB50194-201447企業(yè)標準我局相關的有關企業(yè)標準/
18行業(yè)規(guī)范《建筑地基處理技術規(guī)范》JGJ79-2012
19行業(yè)規(guī)范《建筑基坑支護技術規(guī)程》JGJ120-2012
20行業(yè)規(guī)范《建筑深基坑工程施工安全技術規(guī)范》JGJ311-2013
21行業(yè)規(guī)范《型鋼水泥土攪拌墻技術規(guī)程》JGJ/T199-2010
22行業(yè)規(guī)范《建筑樁基工程技術規(guī)范》JGJ94-2018
中國建筑第八工程局有限公司
品CHRACONSTRUOONt?GHTNINGMHNNGDMSK)NCOIVXT?
/如塊二期(XSCQ020207-01)項目
第二章工程概況表2.1-2基坑工程一標段概況一覽表
基坑支護設計安全等級一級
2.1項目總體概況支護結構設計使用期限36個月
施工方式明挖順作法
2.1.1建設概況支護形式地下連續(xù)墻或鉆孔灌注樁結合2~6道水平內(nèi)支撐
9ffii-
表2.17工程建設概況一覽表
項目名稱蕭政儲出[2021]33號地塊二期(XSCQ020207-01)項目
fW3
蕭政儲出[2021]33號地塊二期(XSCQ020207-0D項H期
標段名稱1-a區(qū)
土護降及樁基工程一標段i1i鐵
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 中學學生社團活動經(jīng)費監(jiān)管職責制度
- 中國古代貨幣制度的變遷
- 2026年交管12123駕照學法減分題庫含答案【預熱題】
- 2026年低壓電工操作證理論全國考試題庫含答案(a卷)
- 2025山西省太原市公務員考試常識判斷專項練習題及1套參考答案
- 2026年一級造價師考試題庫300道附答案(滿分必刷)
- 2026重慶兩江新區(qū)魚復新城建設投資有限公司招聘(公共基礎知識)綜合能力測試題附答案
- 2025 年大學運動人體科學(運動人體科學)試題及答案
- 2025 年大學運動解剖學(人體解剖)試題及答案
- 2025 年大學有色金屬冶金(有色金屬冶金學)試題及答案
- 2025年國家開放大學《農(nóng)業(yè)經(jīng)濟學》期末考試備考試題及答案解析
- 2025蚌埠市城市投資控股集團有限公司所屬公司招聘9人筆試備考題庫及答案解析
- 高壓電工操作證培訓課件
- 2025年新版勞動合同模板(北京版)
- 2025年事業(yè)單位工勤技能-河南-河南防疫員三級(高級工)歷年參考題庫含答案解析
- 數(shù)智企業(yè)經(jīng)營沙盤模擬實訓教程-人力規(guī)則
- 《婚姻家庭繼承法(第八版)》課件全套 房紹坤
- 倉儲部員工管理制度
- JG/T 381-2012建筑結構用冷成型焊接圓鋼管
- 2025年湖北武漢市華中科技大學航空航天學院李仁府教授課題組招聘2人歷年高頻重點提升(共500題)附帶答案詳解
- 中華人民共和國史期末復習
評論
0/150
提交評論