裝配式建筑施工英語課件-裝配式混凝土構件的連接_第1頁
裝配式建筑施工英語課件-裝配式混凝土構件的連接_第2頁
裝配式建筑施工英語課件-裝配式混凝土構件的連接_第3頁
裝配式建筑施工英語課件-裝配式混凝土構件的連接_第4頁
裝配式建筑施工英語課件-裝配式混凝土構件的連接_第5頁
已閱讀5頁,還剩11頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領

文檔簡介

ConnectionofPrefabricatedConcreteComponentsPCBULIDINGCONSTRUCTIONLearntheSpiritofLubanBecometheCraftsmenoftheNationDigitalAssemblyIntelligence-builtFuture01ConnectionModeofPrefabricatedConcreteStructure02PrefabricatedConcreteStructureConnectionMaterialPCBULIDINGCONSTRUCTIONContentsCONTENTS01PCBULIDINGCONSTRUCTION01ConnectionModeofPrefabricatedConcreteStructureTaskanalysisKnowledgeobjectivesSkillgoalsLearntorecognizethetypesofconnectionmethodsofassembledconcretebuildingcomponents,connectionmaterials,qualityinspectionandcontrolofconnections,andotherrelatedknowledge.Mastertherelevantknowledgepointsofcast-in-situconnectionofprefabricatedconcretebuildingcomponentsBeabletocorrectlyidentifytheconnectionmodeandprincipleofdifferentprecastconcretecomponents01ConnectionModeofPrefabricatedConcreteStructure

PreschoolTaskAnalysis(1)ConnectionMethod-postConcretePost-pouredconcretereferstotheconcretecastonsiteintheconnectionareaorcompositelayerofprecastcomponentsaftertheinstallationofprecastcomponents.Inprefabricatedbuildings,thecast-in-placeconcreteinthefoundation,firstfloor,podium,topfloorandotherpartsiscalledcast-in-placeconcrete;Thecast-in-situconcreteattheconnectionandsuperpositionpartsiscalled"postcastconcrete".01ConnectionModeofPrefabricatedConcreteStructure(2)ConnectionStructure-ReinforcementConnectionReinforcementconnectionisthemostimportantlinkofpostcastconcreteconnectionjoint.Thereinforcementsconnectionstructureinthepostpouringareaincludes:1)Mechanical(threaded)sleeveconnection;2)Glueinjectionsleeveconnection;3)Reinforcementlapping;4)Reinforcementwelding,etc.01ConnectionModeofPrefabricatedConcreteStructure(3)JointSurfaceTreatment-----RoughSurfaceandKeywayThecontactsurfacebetweenprecastconcretecomponentsandpostcastconcretemustbemadeintoroughsurfaceorkeywaysurfacetoimprovetheshearresistance:1)Theroughsurfaceis"roughened"onthecalendaredsurface(suchasthesurfaceoflaminatedslabandlaminatedbeam)beforetheinitialsettingofconcrete,asshowninFigure1-1.Forthemoldsurface(suchasthesurfaceofbeamendandcolumnend),theretardercanbepaintedonthemold,andafterthemoldisremoved,theunsetcementslurrycanbewashedwithwatertoexposetheaggregateandformaroughsurface.;2)KeywayKeywayisformedbytheconvexandconcaveofthemold.AsshowninFigure1-2,thekeywayatthebottomoftheprecastcolumn.Figure1-1Figure1-201ConnectionModeofPrefabricatedConcreteStructure0101PCBULIDINGCONSTRUCTION02PrefabricatedConcreteStructureConnectionMaterial1)ReinforcementSleeveConnectingmaterialsarethematerialsandcomponentsusedfortheconnectionofprecastconcretestructures,includingreinforcementsleeves,groutingmaterials,sandwichfacadepanelties,etc.,allofwhicharethemostimportantspecialmaterialsforprecastconcretestructures:Metalsleeveswillbeusedfortheconnectionoflongitudinalreinforcementintheconcretepouringareaaftertheconnectionofprefabricatedconcretestructures,asshowninFigure2-1.Thestressedreinforcementsinthepostpouringareaadoptsthebuttjointconnectionmethod.That’stosay,theconnectingsleeveisfirstsleevedononereinforcement,andafterdockingwithanotherreinforcementinplace,thesleeveismovedtothemiddleoftworeinforcements,orthetworeinforcementsareconnectedbyscreworglueinjection.AsshowninFigure2-2and2-3Figure2-1Figure2-202PrefabricatedConcreteStructureConnectionMaterialFigure2-32)Grout-filledSleeveMaterialThesleevegroutingmaterialforreinforcementconnectiontakescementasthebasicmaterial,andismixedwithfineaggregate,admixtureandothermaterialstoformadrymixture.Afteraddingwaterandmixingaccordingtothespecifiedproportion,ithasthecharacteristicsoffluidity,earlystrength,highstrengthandmicroexpansionafterhardening:Theuseandperformanceofsleevegroutingmaterialshouldcomplywiththeprovisionsofthecurrentindustrialstandards"TechnicalCodefortheApplicationofRebarSplicingbyGrout-filledCouplingSleeve"(JGJ355─2015)and"RebarSplicingwithGrout-filledCouplingSleeveMaterial"(JG/T408─2013).Thetechnicalpropertiesofgrout-filledsleevematerialsaregiveninthetwoindustrystandards,asshownintable2-4.Figure2-402PrefabricatedConcreteStructureConnectionMaterial3)CorrugatedPipesinGrout-filledHolesThecorrugatedpipeingrout-filledholeisthematerialusedforlapping,whichisembeddedintheprecastconcretecomponenttoformtheinnerwallofthegrout-filledhole,asshowninFigure4-14.Whentheembeddedmetalbellowsisusedinthelappingconnectionofsteelgroutanchors,theperformanceofthemetalbellowsshallcomplywiththerelevantspecificationssuchasthecurrentindustrystandardsCorrugatedMetalDuctsforPre-stressedConcrete(JG225-2007),Cold-rolledSheetandStripofCarbonStructuralSteel(GB716-1991),andContinuouslyHot-dipZinc-coatedSteelSheetandStrip(GB/T2518-2008).Figure3-102PrefabricatedConcreteStructureConnectionMaterial4)PulpAnchorLapGroutingMaterialsThegroutingmaterialusedfortheslurryanchorlapisalsocement-basedgroutingmaterial,butitscompressivestrengthislowerthanthatofsleevegroutingmaterials.Becausethecompressivestrengthofthegroutanchorholewallislowerthanthatofthesleeve,thehighstrengthofthegroutingmateriallikethesleevegroutingmaterialisunnecessary.Article4.2.3oftheTechnicalSpecificationforPrefabricatedConcreteStructures(JGJ1-2014)givestheperformancerequirementsofthegroutingmaterialforthelapjointofthereinforcedmortaranchor,asshowninTable3-2.Figure3-202PrefabricatedConcreteStructureConnectionMaterial5)SittingSlurrySittinggroutisusedinthejointsatthebottomofmulti-layerprefabricatedshearwallstoreplacethegroutthere;itisalsousedinthegroutingpartitionisolationzone(alsocalledasbinsisolation)attheconnectionofprefabricatedwallpanelsofhigh-riseshearwallstructures.Thesettingslurryshouldhavegoodfluidity,earlystrength,noshrinkage,microexpansionandotherproperties.SeeTable3-3fortheperformanceindexesofcommonbedmortarmaterials.Figure3-3PrefabricatedConcreteStructureConnectionMaterial026)Grout-filledHoleisBoundwithSpiralReinforcement,GroutingConduit,HolePlugandJointPluggingMaterialsTheslurryanchorlapmethodisconstrainedbyspiralreinforcementaroundtheslurryanchorhole,andthematerialofspiralreinforcementsshouldmeettherequirementsofcorrespondingnationalstandards.Thediameterofreinforcement,diameterofspiralringandspiralspacingshallbedeterminedaccordingtothedesignrequirements.02PrefabricatedCconcreteStructureConnectionMaterial2.Grout-filledHolePlugThegroutingholeplugisusedtoblockthegroutingopeningandgroutoutletofthegroutingsleeveandgroutanchorhole,soastoavoidtheholechannelbeingblockedbyforeignmatters.Thegrout-filledholeplugcanbemadeofrubberorwood.3.GroutingCaulkingmaterialsGroutingcaulkingmaterialsareusedforthejointsofgroutingcomponents,includingrubberstrips,woodstripsandcaulkingquick-settingmortar.Thegroutingcaulkingmaterialisrequiredtosealthecaulkingtightlywithoutgroutleakageandbeoperatedeasily.1.GroutingConduitWhenthegroutingsleeveorgroutinganchorholeisfarawayfromtheedgeoftheconcrete,itisnecessarytoembedthegroutingconduitintheprefabricatedconcretecomponent.PVCmedium-sized(M-type)pipeswithapipewallthicknessof1.2mmaregenerallyusedasgroutingconduits,thatis,electricalcasing.Theouterdiameter,generally16mm,shouldbetheinnerdiameterofthegroutingoutletofthesleeveorgroutanchorhole..7)CoreInsulationComponentTiePieceSandwichfacadepanel,or"sandwich"panel,isafabricatedconcreteexteriorwallcomponentwithinsulationmaterialssandwichedbetweentwolayersofreinforcedconcreteslabs.Twolayersofreinforcedc

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論