版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、2282DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置CONTENTS目錄RefereneedrawingsTOCo1-5hz參考圖紙3Installationprocedure安裝過程4Preparationbeforeinstallation安裝前準備4Liftingprocedure吊裝過程5InstallAnehorBracket安裝支承架6安裝增壓器6Installblock安裝閥塊7InstallTrackRollerandLiftingCylinder安裝滾輪及頂升缸7InstallHydraulicCylinder安裝伸縮缸8InstallControlConsole
2、安裝控制臺8Hydraulic&ElectricConnection連接液壓&電氣管路10AttachedTable附表10DrawingNo.DrawingnameTP10109-R-BM11-XD-0001DRILLFLOORSKIDDINGGENERALARRANGMENTDIAGRAMTP10109-R-BM11-XA-0001DRILLFLOORSKIDDINGHYDRAULICFLOWDIAGRAMTP10109-R-BM11-XT-0001DRILLFLOORSKIDDINGUNIT,WIRINGDIAGRAMTP10109-R-BM11-XD-0201DRILLFLOORSKI
3、DDINGUNITFWD-PORT,GENERALARRANGMENTTP10109-R-BM11-XD-0101DRILLFLOORSKIDDINGUNITCONSOLE,GENERALARRANGMENTTP10109-R-BM11-XX-0101DRILLFLOORSKIDDINGUNITFWD-PORT,LIFTINGARRANGMENTTP10109-R-BM11-XX-0102DRILLFLOORSKIDDINGUNITCONSOLE,LIFTINGR0331-402-401quiEQUIPMENTINSTALLATION-CANTILEVER&DRILLFLOOR1.Refere
4、neeDrawings參考圖紙1.RefereneeDrawings參考圖紙33833383DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置2.Installationprocedure安裝過程Followingmajorcomponentsshouldbeinstalledduringtheprocedure:-AnchorBracket支撐架-Trackroller滾輪-Liftingcylinder頂升缸-Hydrauliccylinder伸縮缸-ControlConsole控制臺過程中主要安裝以下主要部件:Thesecomponentsshouldbeinstalledsucc
5、essively.應(yīng)依次安裝上列組件。安裝前準備Checktheequipmentcomponentsinstallationbolt,etc.清點各設(shè)備組件、安裝螺栓等。Liftingequipmentsshallbepreparedaccordingtoliftingprocedure.根據(jù)吊裝工藝要求準備好吊裝設(shè)備。Ensureallliftingitemsarecertified.保證所有吊具合格。Ensuresufficientlaydownandaccessareasforallaspectsofinstallation.保證安裝位置各個方向均有足夠的下放及通道區(qū)域。Moveall
6、obstaclesfromthearea.清除工作區(qū)域的障礙物。Protectallunconnectedelectricalcablewithsuitabletapeandlabel.用膠帶及標簽固定好電纜。/hosesupportsshouldbere-instatedaftercompletionofinstallation。密封好液壓管路的端口,以防進入臟物,所以臨時未固定的電纜及軟管應(yīng)固定好,直至設(shè)備安裝完畢才能解除固定。Protectpaintworkfromscuffingofropes,slings,etc,withpadding.Usepadpieces,44844484sp
7、readersandpackingasrequired保護設(shè)備表層油漆,防止和繩索等擦碰產(chǎn)生磨損。Avisualinspectionoftheequipmentshallbeperformedpriortoanyinstallation.Thisinspectionwillverifyproperassemblyandintegrityofallequipment.Allpiecesofequipmentinstalledabove6feet(1.8meters)inheightshallalsobeinspectedforpropersecondaryretentionofallfasten
8、ers.設(shè)備安裝前應(yīng)進行外觀檢查,用以確認設(shè)備裝配情況及完整性。所有安裝高度在feet(1.8m)以上的設(shè)備必須檢查吊裝過程2.2.1.LiftingEquipmentRequired:吊裝設(shè)備要求:Trackroller-minimumcapacity:540kgeachLiftcylindersminimumcapacity:150kgeachAnchorbracket-minimumcapacity:250kgeachHydrauliccylindersminimumcapacity:100kgeachConsole-minimumcapacity:150kg2.2.2.Particul
9、arprocessofliftingseetheliftingprocedure.具體的吊裝過程見吊裝工藝。安裝支承架LifttheAnchorbracketontotherailthe4corners,Makesuregreasewasbestrewedontherail,Andbothsidespacebetweenthesideplateandrailisnomorethan6mm.(seeFigureA).將支撐架吊到軌道的四個角上。保證軌道上涂好潤滑油脂。安裝時保證支撐架兩側(cè)邊板和軌道的間距不大于6mm(見圖A)。安裝增壓器InstallthePressureIntensifiero
10、ntheDrillFloorFrameby8-90Ublotand8-M12nut.makesurethePressureIntensifierwithoutThrottleValvesidewastheoutsideoftheDrillFloor(seeFigureA).用8個M12螺栓、螺母將增壓器安裝到鉆臺結(jié)構(gòu)上,保證增壓器沒有節(jié)流閥的一側(cè)朝向鉆臺舷外(見圖A)。DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置5585SHEET5OF10DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置FigureAInstallblock安裝閥塊InstalltheblockontheD
11、rillFloorFrameby20-M12x30boltandwasher,makesuretheblocksurfacewithholewastheoutsideoftheDrillFloor,makesurethePressureIntensifierwithoutThrottleValvesidewastheoutsideoftheDrillFloor(seeFigureB).用20個M12x30的螺栓及M12墊片將閥塊安裝到鉆臺結(jié)構(gòu)上,保證閥塊帶孔的一面朝向鉆臺舷外。保證增壓器沒有節(jié)流閥的一側(cè)朝向鉆臺舷外(見圖B)。66866686tTgz229229iiIIwiiii1J165ST
12、ROKDRILLFLOORSKIDDINGUNIT鉆臺滑移裝置lF0DfflLLFLOORSTRUCTURE廠-902”甘-n-i-iliiii=;:#:丄iii36r.JIA.(70125|峙r*-止L占SHEET6OF10iiliiiiiiiiiiii:一jkJI11fF*住歸基辣DRIlTLOORSKIDBEAV10924723至鉆科誡6096TODERRICKCPORT/FWDCORNERSHOVNFigureB安裝滾輪及頂升缸InstallTrackRollerandLiftingCylinderInstallthetrackrollerandliftingcylinderonthe
13、anchorbracket.Makesurethecentrallineofliftingcylinderwascoincidedwiththerailcentrallineintheverticalview.將滾輪和頂升缸安裝到支撐架上,保證頂升缸中心線和軌道中心線一致。InstallHydraulicCylinder安裝伸縮缸ConnecttheBoresideofhorizontalhydrauliccylindertotheanchorbracketbythepinandkeepplate,ThenusesubstitutepinconnecttheRODsidetothefixedb
14、racket(willprovidebyRO),thenweldthebrackettotheDrillFloor.Makesurethetoleranceofparallelismforbothpinsnomorethan0.05mm(seeFigureC).Andmakesurethecentrallineofthecylinderwasparallelwiththecentrallineofdrillfloor,thetolerancenomorethan1mm(seeFigureD).將水平伸縮液壓缸液壓缸側(cè)用銷子及擋板連接到支撐架上,然后用銷子將活塞端連接到固定的托架上,然后將該托架
15、焊接到鉆臺上。保證兩銷子的平行度公差不大于土0.05mm(見圖C),保證液壓缸的中心線和鉆臺中心線平行,公差不大于土1mm(見圖D)77877787*iFJ/0.05AFigureCDrillFlooriiREV.OInstallthecontrolconsoleundertheDrillFloorby4-M12X40boltandwasher.R0331-402-401Rev.1EquipmentInstallation-Cantilever&安裝控制臺DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置SHEET7OF10JACKUPM28888JACKUPM2REV.OSHEET8O
16、F101旳燭上DRILLFLOORSKIDDINGUNIT鉆臺滑移裝置TAGW,4398U110iTjiJ瀾MO,*WJ3OmQQg池曲rfVOI做L“馳1制rmFIDOR5KC倔ATI-4T6科P9HVT2Q叭丄FLOOf毀IW啲”hBFigureD&ElectricConnection連接液壓&電氣管路RefereneeDrawings:TP10109-R-BM11-XA-0001;TP10109-R-BM11-XT-0001Connect,routeandsecureallhydraulicpiping,hosesandfittingspertheabovedrawingsandsche
17、matics.Makesurenoleakofthepipework.連接好所有液壓管路、軟管、配件等,確保管路無泄漏。參考圖紙:TP10109-R-BM11-XA-0001;TP10109-R-BM11-XT-0001DRILLFLOORSKIDDINGUNITItemsFastenersFastenersBoltGradeBlackFastenersHotDippedSpunGalvanisedZincPlatedXlanCoated8.810.98.810.98.810.98.810.9SizeTorqueLoad(Nm)M5NANANANA5.24.8NANAM6NANANANA911NANAM8NANANANA2229NANAM10NANANANA4560NANAM128712379111791116592M14140197126177NANANANAM16218306196276196276148230M20426599383539383539319449M2473610356629316
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026年投資顧問業(yè)務(wù)合同
- 2026年兒科保健服務(wù)合同
- 2026年菜品供貨合同
- 2025年人工智能數(shù)據(jù)分析平臺研發(fā)項目可行性研究報告
- 2025年在線零售平臺升級項目可行性研究報告
- 2025年網(wǎng)站建設(shè)與搜索引擎優(yōu)化的結(jié)合可行性研究報告
- 2025年人工智能助手應(yīng)用項目可行性研究報告
- 2025年清潔生產(chǎn)技術(shù)開發(fā)項目可行性研究報告
- 現(xiàn)簽協(xié)議再簽合同
- 消防備案合同范本
- 2025年甘肅省武威市涼州區(qū)大柳鎮(zhèn)選聘專業(yè)化管理大學(xué)生村文書筆試考試備考試題及答案解析
- 戥秤的課件教學(xué)課件
- 2025內(nèi)蒙古潤蒙能源有限公司招聘22人考試筆試備考試題及答案解析
- 虛擬現(xiàn)實行業(yè) VR 全景拍攝師崗位招聘考試試卷及答案
- 供應(yīng)鏈金融業(yè)務(wù)操作與風險管理
- 2025年廣西學(xué)法用法考試試題及答案
- 2025全球包裝材料標準BRCGS第7版內(nèi)部審核全套記錄
- 紫外線燈管強度監(jiān)測課件
- 醫(yī)藥行業(yè)2026年度醫(yī)療器械策略報告耗材IVD篇:創(chuàng)新引領(lǐng)國際布局后集采時代醫(yī)療器械的價值重構(gòu)
- 五常管理餐飲培訓(xùn)
- (12)普通高中技術(shù)與工程課程標準日常修訂版(2017年版2025年修訂)
評論
0/150
提交評論