版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
JobrisktipsCONTENTSPAGE010203ProtectiontripcontrolWordPublicpart--Basichazardpointsandpreventivemeasures04050607Publicpart-Circuit-relatedhazardpointsandpreventivemeasuresPublicpart-Setting-relatedvalueriskpointsandpreventivemeasuresPublicpart-DangerouspointsrelatedtoCBdriveandpreventivemeasuresRelevantdangerpointsandpreventivemeasuresforthelineprotectionpartRelevantdangerouspointsandpreventivemeasuresofthetransformerprotectionpartDangerouspointsandpreventivemeasuresrelatedtobusdifferenceprotection,buscouplingprotectionprotection,lowcycleprotectionandoverloadprotectionPublicpart--Basichazardpointsandpreventivemeasures01Publicpart--Basichazardpointsandpreventivemeasures1.StrikeandhurtpeopleandmistakenlytouchthecabinetdoorofthepowerdistributionroomPreventivemeasures:Wearahatwhenenteringtheoutdoorworksiteandpowerdistributionroom2.Liveplug-insandelectrostaticinductiondamageintegratedchipsPreventivemeasures:Whenreplacingtheplug-in,firstdisconnectthepowerofthedevice,anddischargethehumanbodytopreventdamagetothechip.Publicpart--Basichazardpointsandpreventivemeasures3MisconnectionandmisconnectionduringsecondaryworkPreventivemeasures:Whendisconnectingthewiring,makearecordofthedisconnection,andcheckitafterthewiringisrestored.4.LasereyeinjuryPreventionmeasures:Itisstrictlyprohibitedtoputtheopticalfiberintotheeyesofyourselfandothers.Publicpart--Basichazardpointsandpreventivemeasures5.IncorrectuseofmetergearssuchasmultimetersPreventivemeasures:a)Beforework,carefullyrefertotheoperatinginstructions;b),Duringwork,correctlyselectthegearandrangeaccordingtotheworkneeds,confirmthatthemeterholeispluggedincorrectly,andprohibittheuseofover-range;c),Thetestwiringandgearpositioncanbemeasuredonlyafterbeingreviewedbypeople.6.TheorderofintelligentstationsafetymeasuresiswrongPreventivemeasures:Whentheprimaryequipmentisnotpoweredoff,theintelligentterminaltrippingandreclosingoutlethardpressureplateshouldbeexitedfirst,andthebusbarprotectioncorrespondingisolationknifeswitchforcedsoftpressureplateshouldbeputinbeforetheintelligentterminalmaintenancepressureplatecanbeputintooperation.Publicpart--Basichazardpointsandpreventivemeasures7.DisassembleandrestoretheopticalfiberbyerrorPreventivemeasures:A)Beforeoperation,verifywhetherthefiberidentificationisstandardized,clear,andconsistentwiththeon-siteoperation;b).Theremovedopticalfibersshouldberecorded,andtherestorationshouldbecarriedoutonebyoneunderthesupervisionofaspecialperson,andcarefullychecked.;c).Afterrecovery,therelevantfibersignalrecoveryshouldbechecked.Itisstrictlyforbiddentopointtheopticalfiberintheeyesofyourselfandothers.8.ThevibrationoftheinstalledprotectionscreencausesthephaseprotectiontotripbymistakePreventivemeasures:setupspecialpersonneltomonitorandcommand,andstoptheadjacentprotection.Publicpart-circuit-relatedhazardpointsandpreventivemeasures02Publicpart-circuit-relatedhazardpointsandpreventivemeasures1.TheCTsecondarycircuitisopenPreventivemeasures
:1)BeforedisconnectingtheCTcircuit,usetheclampgaugetoconfirmnocurrentbeforedisconnectingtheCTcircuitanddismantlingwiringrecords;2)ThedisconnectedCTcircuitshallberestoredintime,andshallbecheckedandconfirmedbymultiplepeople;3)WhensealingtheCT,theshortsealinglinehasreliablecontactandusetheclamptabletoconfirmnocurrentinthecircuitbeforedisconnectingtheCTcircuit.2.ShortcircuitPreventivemeasures:WorkonthePTsecondarycircuitshoulduseinsulatingtools,helmet,andwiregloves.EachdisconnectedACvoltagecircuitterminalwiringshouldbewrappedwithinsulatingtapetopreventshortcircuitwithadjacentterminals,andmakearecordofdisconnectionPublicpart-circuit-relatedhazardpointsandpreventivemeasures3.ThetestvoltageissentbacktotheprimaryequipmenttwicePreventivemeasures:Beforeapplyingthetestvoltagetothedevice,theACvoltagecircuitontheprotectivescreenshouldbedisconnected,andthetestvoltageshouldbeappliedtothedeviceside.4.PreventfiberdamagewhenthefiberloopisunpluggedPreventivemeasures:Aftertheopticalfiberispulledout,adustcapshouldbeputonintimetopreventthewhiteceramicpinoftheopticalfiberfromtouchinghardobjects,whichmaycausepollutionoftheopticalheadordamagetotheopticalfiber.5.PreventmiscurrenttooperationintervalbeforecommonCTcircuittest.Preventivemeasures:CheckwhethertheCTsecondarycircuitisconnectedtootherequipment,andshouldbereliablydisconnectedtopreventthecurrenttotheoperationinterval.Publicsettingvalueriskpointsandpreventivemeasures03Publicsettingvalueriskpointsandpreventivemeasures1.On-sitesettingvaluesettingandwrongsettingduringcommissioningworkPreventivemeasures:Theon-sitesettingvalueadjustmentworkshallbecarriedoutbytwopeople;2)Afterthesettingvalueisinput,restartthepowersupplyoftheunit,andthenprintthefixedvalueoftheunitandtheofficialsettingvalueissued;3)Afterchecking,thesettingvalueofthedeviceshallnotbemodifiedatwill.Oncemodified,theprintingandcheckproceduresshallbeperformedagain.2.ThesettingvalueofthenewprotectionsectiondevicedoesnotmovePreventivemeasures:Whenmodifyingthefixedvalue,ifthenewprotectionsectionisinvolved,thenewprotectionsectionshallbeverified.Publicsettingvalueriskpointsandpreventivemeasures3.Settingvalue
errorsettingPreventivemeasures:Whensettingthesettingvalue,ifitinvolvessettingvalue,suchascontrolword,tripmatrix,softpressureplate,internalsettingvalue,etc.,itsmeaningshouldbeclarified,andthemanualshouldbeconsultedtopreventwrongsetting.Publicpart-DangerouspointsrelatedtoCBdriveandpreventivemeasures04Publicpart-DangerouspointsrelatedtoCBdriveandpreventivemeasures1.Personalandmechanicalinjurywhendrivingthecircuitbreaker(CB)Preventivemeasures:1)Whentheactionlogicoftheprotectiondeviceischecked,theoutletplateniswithdrawntopreventtheswitchfrombeingoperatedbymistake.2)Contactsshouldbestrengthenedduringtransmission.Thepersoninchargeoftheteaminformsthemaintenancepersonneltoconfirmthatnooneisworkingontheswitchbeforethetransmissioncanbecarriedout,andaspecialpersonwillbeassignedtomonitorit.3)Placethe"Protectisdriving"signonthecircuitbreaker.2.ProtectioncheckerrortripoperationswitchPreventivemeasures:1)Checktheconsistencyoftheplatenandtheequipmentbeforethetransmission;2)Beforethetransmissionofdifferentprotectivedevices,thecorrespondingplatenshallbecheckedaccordingly.Publicpart-DangerouspointsrelatedtoCBdriveandpreventivemeasures3.Aftertheprotectiondeviceisinspected,thepotentialoftheoutletplatenisabnormalandtripsbymistakePreventivemeasures:Whentheworkisoverandtheplatenisrestored,payattentiontocheckingthecorrectnessoftheplatenpotentialtopreventfalsetripping.Inparticular,specialattentionshouldbepaidtothecalibrationofpublicequipmentsuchasself-transmission,busdifferential,lowcycle,andoverload.4.MicorrectlycontroloperationswitchinremotecontroltestPreventivemeasures:hitthe"remote/local"handleoftheoperationswitchtothelocalpositiontopreventfalsecontroloftheoperationswitch.Relevantdangerpointsandpreventivemeasuresforthelineprotectionpart05Relevantdangerpointsandpreventivemeasuresforthelineprotectionpart1.triptheoppositesideCBmistakenlyduringthelineprotectiontransmissiontestPreventivemeasures:changethesidelongitudinalprotectionchannelto"self-ringstate"(isolationchannel)topreventoppositesideswitch;Iflongitudinalprotectionisrequired(withoutCB),oppositelongitudinalprotectiontrip,closingandopeningfailureshallbeclearlyisolatedtopreventmistransmissiontripoppositesideswitchorabnormaloppositesideoperationprotection.2.LightdifferentialprotectiondebuggingmistakenlytriptheoppositesideswitchPreventivemeasures:duringthelinelightdifferentialprotectioninspection,thesideprotectiondeviceshouldbeself-loopsoastoavoidaccidentallytrippingtheoppositeswitch.Relevantdangerpointsandpreventivemeasuresforthelineprotectionpart3.LineprotectioncheckfalsestartbusdifferentialprotectionfailurePreventivemeasures:Disconnecttheopenbusdifferentialfailureplaten.4.PersonalandmechanicalinjurycausedduringthedrivingtheCBPreventivemeasures:Duringdriving,thepersoninchargeoftheteaminformsthemaintenancepersonnelandconfirmsthatnooneisworkingontheswitchbeforethetransmissioncanbecarriedout.Andsetupaspecialpersontomonitor,andplacea"protectionistransmitting"signontheobviouspartoftheswitch.
5.ProtectioncheckerrortripoperationCBPreventivemeasures:intheprimaryequipmentoperationandpartialprotectionstopoperation,attentionshouldbepaidtobreakingtheplatetrippingcircuit,closedcircuitandothercircuitsrelatedtotheoperatingequipment.Theunrestrictedtripcircuit(includingthefartripcircuit),theclosingcircuitandtheconnectionrelatedtotheoperatingequipmentshallbeincludedintherelayprotectionmeasureticket.Relevantdangerpointsandpreventivemeasuresforthelineprotectionpart6.Duringsomepowercuts,theisolationmeasurestakenbytheprotectivepersonnelarenottakenPreventivemeasures:1.Beforework,checkwhetherthemeasureslistedintheworkticketarecorrectandcomplete,andwhethertheyarereallydonewell.2.Implementallmeasuresinstrictaccordancewiththeguidancecard,andtheexecutorandguardianshallearnestlyperformtheirduties.3.Forsomepowerfailureofconventionalstations,circuitssuchastripping,ACsampling,openingfailureandlongtripshouldbeisolated.7.Mis-trippedoperationequipmentduringdriving
CBPreventivemeasures:1.Checktheconsistencyoftheplatenandtheequipmentbeforethetransmission.2.Beforework,exitthefartrip,openingfailure,decompressionlockandfailurejointtripofthelineprotection.Relevantdangerouspointsandpreventivemeasuresofthetransformerprotection06Relevantdangerouspointsandpreventivemeasuresofthemaintransformerprotectionpart1.Mis-trippedthebuslinkCBPreventivemeasures:Whenthemaintransformerischecked,thepowerfailuremodeshouldbeclarifiedtopreventthebustieswitchfromtrippingbymistake,andisolationmeasuresshouldbetakeninthebustieterminalboxtopreventthecurrentfromflowingintotherunningmaintransformer.2.Whenthemaintransformerispre-testedandoverhauled,preventtheaccidentaltrippingofthegrid-connectedlinePreventivemeasures:Checkthatthegapprotectionremotetripgridconnectionpressureplatehasbeenremoved.3.Duringthemaintenanceandtestwork,themaintransformerprotectiontransmissionislikelytocausemis-trippedofthebuslinkCBonthelowandmediumvoltageside.Preventivemeasures:Whenthemaintransformerprotectionoverhaultestdrive,checkthattheoutletplatenofthebuslinkCBonthelow-voltagesideofthemaintransformerisdisconnected.Relevantdangerouspointsandpreventivemeasuresofthemaintransformerprotectionpart4.Mis-trippedthebuslinkswitchPreventivemeasures:whenthemaintransformerverification,clarifythepowerfailuremodetopreventaccidentaltrippingofthemotherjointswitch,andtakeisolationmeasuresintheparentterminalboxtopreventtheflexiblecurrenttothemainoperation.5.Duringthepre-testandmaintenanceofthemaintransformer,preventtheaccidentaltripofthenetworkconnectionlinePreventivemeasures:checktheclearanceprotectionfartripandmeshpressureplatehasbeenremoved.6.Duringthemaintransformerprotectiondrive,theLVandLVsidebusswitchPreventivemeasures:whenthemaintransformerprotectionmaintenancetestdrive,checkthedisconnectionofthebusswitchoutletplatenontheLVsideofthemaintransformertrip.Dangerouspointsandpreventivemeasuresrelatedtobusdifferenceprotection,buscouplingprotectionprotection,lowcycleprotectionandoverloadprotection07Hazardpointsandpreventivemeasuresrelatedtomaternaldifference,maternalunion,lowweekandoverloadpart1.Thenewprotectionisconnectedtothebusdifferentialdrive,andtheoperationCBistrippedbymistake.PreventivemeasuresExitalloutletplaten,cutoffthecontrolpowerbeforetransmission,andcheckwhethertheplatenare
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 南平天幕施工方案(3篇)
- 審查防水施工方案(3篇)
- 球館保溫施工方案(3篇)
- 魚類促銷活動(dòng)策劃方案(3篇)
- 房頂泡沫施工方案(3篇)
- 電線端子施工方案(3篇)
- 無機(jī)石材施工方案(3篇)
- 初中一年級(jí)(單元復(fù)習(xí))歷史2026年下學(xué)期期中卷
- 2025年大學(xué)地理科學(xué)(國(guó)土資源調(diào)查)試題及答案
- 2025年大學(xué)大一(廣告學(xué))廣告學(xué)概論基礎(chǔ)試題及答案
- 云南師大附中2026屆高三高考適應(yīng)性月考卷(六)思想政治試卷(含答案及解析)
- 建筑安全風(fēng)險(xiǎn)辨識(shí)與防范措施
- CNG天然氣加氣站反恐應(yīng)急處置預(yù)案
- 培訓(xùn)教師合同范本
- 2026年黑龍江單招職業(yè)技能案例分析專項(xiàng)含答案健康養(yǎng)老智慧服務(wù)
- 定額〔2025〕1號(hào)文-關(guān)于發(fā)布2018版電力建設(shè)工程概預(yù)算定額2024年度價(jià)格水平調(diào)整的通知
- 高考生物學(xué)二輪復(fù)習(xí)備課素材:多變量實(shí)驗(yàn)題的類型及審答思維
- 瀝青瀝青混合料試驗(yàn)作業(yè)指導(dǎo)書
- 護(hù)理死亡病例討論總結(jié)
- 鋼板樁支護(hù)工程投標(biāo)文件(54頁)
評(píng)論
0/150
提交評(píng)論