重慶某住宅樓施工組織設(shè)計(jì)+F磚混結(jié)構(gòu)_第1頁(yè)
重慶某住宅樓施工組織設(shè)計(jì)+F磚混結(jié)構(gòu)_第2頁(yè)
重慶某住宅樓施工組織設(shè)計(jì)+F磚混結(jié)構(gòu)_第3頁(yè)
重慶某住宅樓施工組織設(shè)計(jì)+F磚混結(jié)構(gòu)_第4頁(yè)
重慶某住宅樓施工組織設(shè)計(jì)+F磚混結(jié)構(gòu)_第5頁(yè)
已閱讀5頁(yè),還剩122頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

目錄第一章施工組組織設(shè)計(jì)編制制總說(shuō)明·······································6第一節(jié)編制依依據(jù)······················································6第二節(jié)編制原原則······················································6第三節(jié)編制內(nèi)內(nèi)容······················································7第二章工程設(shè)設(shè)計(jì)總概況容容··············································88第一節(jié)工程建建設(shè)設(shè)計(jì)概況況···········································8第二節(jié)工程建建筑設(shè)計(jì)概況況···········································8第三節(jié)工程結(jié)結(jié)構(gòu)設(shè)計(jì)概況況···········································11第四節(jié)工程程水電安裝設(shè)設(shè)計(jì)概況·······································144第三章施工總總體目標(biāo)··················································16第一節(jié)工程質(zhì)質(zhì)量目標(biāo)··················································16第二節(jié)工期期目標(biāo)······················································16第三節(jié)安全文文明施工目標(biāo)標(biāo)···········································16第四節(jié)服務(wù)目目標(biāo)···············································17第四章施工工部署······················································17第一節(jié)施工組組織機(jī)構(gòu)···················································17第二節(jié)主要施施工方案安排排···········································18第三節(jié)施工工段劃分及施施工程序········································19第四節(jié)施工工資源配置···················································20第五章施工工進(jìn)度計(jì)劃···················································244第一節(jié)工期控控制目標(biāo)···················································244第二節(jié)施工工進(jìn)度計(jì)劃··············································224第三節(jié)繪制制施工進(jìn)度計(jì)計(jì)劃·············································255第四節(jié)工期期保證措施··············································225第六章施施工總平面布布置················································26第七章施工工關(guān)系協(xié)調(diào)與與工作配合·······································277第一節(jié)主要要關(guān)系························································27第二節(jié)搞好好內(nèi)部關(guān)系的的協(xié)調(diào)與配合合·····································28第三節(jié)近外外層關(guān)系的協(xié)協(xié)調(diào)··············································228第八章保證工工程進(jìn)度措施施················································29第一節(jié)分階階段控制工期期·················································29進(jìn)度計(jì)劃編制與與管理············································30資源保證························································331技術(shù)保證措施····················································32第五節(jié)趕工工措施························································32第六節(jié)雨季季施工措施···················································322第九章土土建主要施工工方法·············································344第一節(jié)施工工測(cè)量························································35土石方施工······················································355第三節(jié)基礎(chǔ)礎(chǔ)工程························································36第四節(jié)主體體模板工程···················································399第五節(jié)主體鋼鋼筋工程···················································422第六節(jié)主體混混凝土工程·················································47第七節(jié)主體砌砌筑、構(gòu)件安安裝工程·······································499第十章地面面與樓面分部部工程施工方方法···································52第一節(jié)水泥石石痟樓地面··················································52衛(wèi)生間樓地面····················································53第十一章裝飾分部工工程施工方法法······································54第一節(jié)天棚及及墻面抹灰··················································54第二節(jié)抹灰面面涂料施工···············································577外墻飾面磚施工工·················································58樓梯欄桿、扶扶手················································61金屬管道油漆漆施工··············································62第十二章門(mén)門(mén)窗分部工程程施工方法········································63第一節(jié)塑塑鋼窗安裝·····················································633第十三章屋面分部工工程施工方法法······································65第一節(jié)爐渣渣砼找坡層·················································65第二節(jié)水泥泥砂漿找平層層施工············································666防水施工························································667細(xì)石砼剛性防水水層施工··········································68第十四章水電電分部工程施施工方法········································69第一節(jié)線(xiàn)路敷敷設(shè)························································69燈具安裝························································669第三節(jié)開(kāi)關(guān)、插插座安裝·················································70第四節(jié)室內(nèi)塑塑料排水管安安裝············································70給水管道安裝····················································70室內(nèi)消防管安裝裝·················································71避雷系統(tǒng)···················································771第十五章節(jié)節(jié)能分部······················································71工程節(jié)能設(shè)計(jì)說(shuō)說(shuō)明··············································772施工階段與質(zhì)量量控制主要內(nèi)內(nèi)容·································773風(fēng)險(xiǎn)分析與控制制措施···········································86第十六章工工程質(zhì)量保證證措施············································93第一節(jié)質(zhì)量量保證體系·················································93第二節(jié)技術(shù)保保證措施··················································94第三節(jié)制度度保證措施·················································94第四節(jié)材料質(zhì)量量管理措施·············································966第五節(jié)施施工過(guò)程中質(zhì)質(zhì)量控制··········································96第六節(jié)細(xì)部部質(zhì)量處理措措施·············································977第七節(jié)質(zhì)量通通病防治措施施············································1011第八節(jié)成品、半半成品保護(hù)措措施········································1103工程質(zhì)量驗(yàn)收··················································105工程檔案資料管管理···········································1055第十七章四四新技術(shù)和信信息管理········································1106第一節(jié)新工工藝、新技術(shù)術(shù)的運(yùn)用········································1106第二節(jié)新材材料的使用··················································1066第三節(jié)新設(shè)設(shè)備(工具)的使用···········································107第十八章安安全生產(chǎn)措施施················································107第一節(jié)堅(jiān)持持安全方針··················································1077第二節(jié)安全全生產(chǎn)管理體體系·············································1007安全檢查評(píng)價(jià)制制度············································1088第四節(jié)安全全教育制度·················································108第五節(jié)安全全生產(chǎn)技術(shù)措措施············································1099第十九章環(huán)保保措施····················································1111第一節(jié)施工場(chǎng)場(chǎng)地環(huán)境保護(hù)護(hù)·············································1111第二節(jié)煙塵塵控制·······················································112第三節(jié)噪聲控控制·······················································112第二十章四文明明施工措施·················································112四第一節(jié)文明明施工管理··················································1133第二節(jié)封閉閉施工·······················································113第三節(jié)現(xiàn)場(chǎng)圖圖牌標(biāo)語(yǔ)··················································1133第四節(jié)暫設(shè)工工程·······················································114第五節(jié)工完完場(chǎng)地清····················································1114第六節(jié)分工工標(biāo)志·······················································114第七節(jié)安全全防護(hù)·······················································114第二十一章降低成本措措施·············································1115第二十二章工程保修和和服務(wù)承諾······································1166第一節(jié)工程保保修內(nèi)容和時(shí)時(shí)限···········································116第二節(jié)保修工工作服務(wù)承諾諾·············································1116第三節(jié)工程維維修、回訪(fǎng)服服務(wù)檔案······································1166附:施工進(jìn)度橫橫道圖····················································施工進(jìn)度網(wǎng)絡(luò)圖圖·························································施工總平面布置置圖·······················································第一章施施工組織設(shè)計(jì)計(jì)編制總說(shuō)明明第一節(jié)編制依依據(jù)本施工組織設(shè)計(jì)計(jì)主要依據(jù)以以下幾條進(jìn)行行編制。第1條由重慶慶市***設(shè)計(jì)院設(shè)計(jì)計(jì)的***區(qū)*******住宅小區(qū)9#樓施工圖和和設(shè)計(jì)變更及及相關(guān)標(biāo)準(zhǔn)圖圖集。第2條國(guó)家現(xiàn)現(xiàn)行相關(guān)文件件、規(guī)范、標(biāo)標(biāo)準(zhǔn)與規(guī)程。第3條****工業(yè)出版社社《建筑施工工手冊(cè)》、《建建筑工程質(zhì)量量通病防治手手冊(cè)》。第4條建設(shè)單單位提供的施施工條件及地地理環(huán)境、氣氣象、運(yùn)輸?shù)赖缆返?。?條公司內(nèi)內(nèi)部企業(yè)標(biāo)準(zhǔn)準(zhǔn)、質(zhì)量、安安全管理文件件。第6條公司具具有的施工、技技術(shù)、組織、管管理力量和水水平、施工經(jīng)經(jīng)驗(yàn)、機(jī)械設(shè)設(shè)備能力。第7條公司對(duì)對(duì)本工程的安安排及各項(xiàng)指指標(biāo)。第8條我單位位成功的施工工經(jīng)驗(yàn)。第二節(jié)編制制原則第1條本建筑筑工程施工組組織設(shè)計(jì)是指指導(dǎo)本工程投投標(biāo)、簽訂承承包合同、施施工準(zhǔn)備和施施工全過(guò)程的的全局性的技技術(shù)經(jīng)濟(jì)文件件。第2條編制中中,自始自終終貫徹執(zhí)行建建筑法和基本本建設(shè)的各項(xiàng)項(xiàng)方針政策、遵遵循基本建設(shè)設(shè)程序和科學(xué)學(xué)的施工工藝藝規(guī)律以及經(jīng)經(jīng)營(yíng)管理規(guī)律律。第3條從實(shí)際際出發(fā)制定科科學(xué)合理的組組織方案、合合理安排施工工順序和進(jìn)度度計(jì)劃、有效效利用施工場(chǎng)場(chǎng)地、優(yōu)化配配制和節(jié)約使使用人力、物物力、資金、技技術(shù)等生產(chǎn)要要素。第4條協(xié)調(diào)各各方面的工作作,加入競(jìng)爭(zhēng)爭(zhēng)取勝機(jī)制,經(jīng)經(jīng)營(yíng)科學(xué)有效效,施工按計(jì)計(jì)劃、循節(jié)奏奏。第5條堅(jiān)持“百年大計(jì),質(zhì)質(zhì)量第一”和“安全第一,預(yù)預(yù)防為主”的方針。確確保工程質(zhì)量量、進(jìn)度、安安全、文明,取取得良好的經(jīng)經(jīng)濟(jì)效益,社社會(huì)效益和環(huán)環(huán)境效益。第6條強(qiáng)化質(zhì)質(zhì)量管理,實(shí)實(shí)現(xiàn)工程“獲獎(jiǎng)”的目標(biāo)。第7條結(jié)合施施工所在地的的氣候變化及及特點(diǎn),合理理安排,科學(xué)學(xué)進(jìn)行夏天、冬冬天、雨季、夜夜間的施工。第8條隨時(shí)關(guān)關(guān)注建筑施工工技術(shù)的新動(dòng)動(dòng)態(tài)和新的發(fā)發(fā)展,及時(shí)采采用新工藝、新新技術(shù)到工程程施工技術(shù)中中,以創(chuàng)造工工程質(zhì)量,經(jīng)經(jīng)濟(jì)的新成果果。第9條滿(mǎn)足足施工的需要要,突出目標(biāo)標(biāo),結(jié)合企業(yè)業(yè)實(shí)際,體現(xiàn)現(xiàn)企業(yè)實(shí)力和和信譽(yù)。第三節(jié)編制內(nèi)內(nèi)容第1條本施工工組織設(shè)計(jì)結(jié)結(jié)合企業(yè)實(shí)際際,突出目標(biāo)標(biāo),滿(mǎn)足施工工的需要,具具有針對(duì)性,體體現(xiàn)企業(yè)實(shí)力力和信譽(yù)。第2條重點(diǎn)闡闡述:工程概概況、施工部部署和施工方方案、施工進(jìn)進(jìn)度計(jì)劃、施施工平面布置置圖、施工方方法、主要技技術(shù)組織措施施等。第3條本工程程施工圖、施施工合同所包包含的工作及及內(nèi)容。第4條本工程程建設(shè)單位、監(jiān)監(jiān)理單位、設(shè)設(shè)計(jì)院發(fā)布的的變更通知書(shū)書(shū)、技術(shù)處理理方案通知等等。第5條是施工工企業(yè)全過(guò)程程中施工指導(dǎo)導(dǎo)性文件。第6條施工過(guò)過(guò)程中采取的的一切技術(shù)措措施、施工工工藝等。第7條現(xiàn)場(chǎng)安安全施工、文文明施工。第二章工程程設(shè)計(jì)總概況況第一節(jié)工程建建設(shè)概況第1條本工工程由重慶***城市建設(shè)發(fā)發(fā)展有限公司司對(duì)本工程實(shí)實(shí)行工程發(fā)包包。第2條工程程名稱(chēng):為“***區(qū)*******住宅小區(qū)9#樓”,簡(jiǎn)稱(chēng)本工工程。第3條本工工程總建筑面面積約為8830..15m2。重慶西大大房地產(chǎn)開(kāi)發(fā)發(fā)有限公司開(kāi)開(kāi)發(fā)。第二節(jié)工程建建筑設(shè)計(jì)概況況本工程位于****區(qū)***鎮(zhèn)***村***社***住宅小區(qū),臨臨規(guī)劃的城市市主次干道,交交通便利,位位置重要。建建筑面積共約約4016..28m2。建筑總高高度為22.000m。為地上6+1F住宅樓,建建筑的結(jié)構(gòu)形形式為磚混結(jié)結(jié)構(gòu)。本建筑為二類(lèi)多多層民用建筑筑,建筑耐火火等級(jí)為二級(jí)級(jí),屋面防水水等級(jí)為二級(jí)級(jí),建筑設(shè)計(jì)計(jì)合理使用年年限為50年。本工程設(shè)計(jì)相對(duì)對(duì)標(biāo)高±0.00等于絕對(duì)標(biāo)標(biāo)高值219.000(黃海系),施工時(shí)可根根據(jù)場(chǎng)地情況況做具體調(diào)整整。在建筑放放線(xiàn)中,應(yīng)按按總平面圖中中建筑物軸線(xiàn)線(xiàn)的交點(diǎn)坐標(biāo)標(biāo)進(jìn)行放線(xiàn),若若與其實(shí)際地地形有出入,應(yīng)應(yīng)會(huì)同設(shè)計(jì),研研究定案后再再進(jìn)行放線(xiàn)以以確保工程放放線(xiàn)的準(zhǔn)確性性。本工程建筑施工工圖所選用標(biāo)標(biāo)準(zhǔn)圖集為《西西南地區(qū)建筑筑標(biāo)準(zhǔn)設(shè)計(jì)通通用圖》(2005年版)。墻身防潮層:在在室內(nèi)地坪下下約60處做20厚1:2水泥砂漿內(nèi)內(nèi)加3~5%防水劑的墻墻身防潮層(在在此標(biāo)高為鋼鋼筋混凝土構(gòu)構(gòu)造,或下為為砌石構(gòu)造時(shí)時(shí)可不做),當(dāng)當(dāng)室內(nèi)地坪變變化處防潮層層應(yīng)重疊搭接接室內(nèi)混凝土土墊層,并在在高低差埋土土一側(cè)墻身砂砂漿防潮層,如如埋土側(cè)為室室外,還應(yīng)刷刷1.5厚SBS防水涂料(或或其它防潮材材料)。1.內(nèi)墻:所有有房間內(nèi)墻面面均采用水泥泥砂漿噴涂料料墻面,做法詳西南04J5115第4頁(yè)N07施工(涂料料品種及顏色色由甲方定,精精裝修房間取取消涂料層);;凡衛(wèi)生間墻墻裙距地1800高度內(nèi)均做做白瓷磚貼面面,作法詳西西南04J5115第9頁(yè)Q06施工。2.頂棚:所所有房間頂棚棚包括樓梯間間均采用水泥泥砂漿刷涂料料頂棚。做法法詳西南04J5115第12頁(yè)P(yáng)05施工(涂料料品種及顏色色由甲方定,精精裝修房間取取消涂料層)。3.踢腳板::地下建筑、樓樓梯間及精裝裝修房間內(nèi)墻墻面做150高水泥砂漿漿踢腳板。做做法詳西南04J3112第5頁(yè)3108和3109施工。4.樓地面::地面及地下下層水泥石屑屑地面作法詳詳西南04J3112第7頁(yè)3120aa,樓面為水泥泥石屑樓面作作法詳3121a。衛(wèi)生間、廚廚房和陽(yáng)臺(tái)樓樓地面為3122a有防水層做做法。5.地下建筑筑外墻防水防防潮:詳西南南05J3002第27頁(yè)4,防水材料料為1.5厚SBS防水涂料,保保護(hù)墻為120厚磚墻。其其它防水節(jié)點(diǎn)點(diǎn)參本圖集其其它防水構(gòu)造造。6.樓梯、欄欄桿:1).樓梯欄桿做做法參西南04J4112第43頁(yè)6施工,欄桿桿豎向凈間距距應(yīng)小于110。樓梯井大大于200時(shí),欄桿高高改為1500或梯井加設(shè)設(shè)鋼絲網(wǎng)。2).樓梯踏步做做法詳西南J412第60頁(yè)3施工。3).欄桿鐵件刷刷紅丹防銹漆漆二度,黑色色調(diào)和漆二度度。4).當(dāng)外窗(含封閉陽(yáng)臺(tái))窗臺(tái)低于900時(shí)應(yīng)另設(shè)護(hù)護(hù)窗欄,護(hù)窗窗欄桿高1100。5).本工程陽(yáng)臺(tái)臺(tái)及外窗護(hù)窗窗欄桿均應(yīng)由由專(zhuān)業(yè)廠(chǎng)家安安裝。屋面1.上人屋面面做法(由下下至上):(1).結(jié)構(gòu)層(2).加氣混凝土土找坡最薄處處30(3).20厚1:2.5水泥砂漿找找平(4).刷底膠劑一一道(材質(zhì)同同下)(5).4厚SBS改性瀝青防防水卷材,同同材性膠粘劑劑二道(6).30厚1:3水泥砂漿找找平保護(hù)層(7).擠塑聚苯板板保溫層按節(jié)節(jié)能設(shè)計(jì)(8).20厚1:3水泥砂漿找找平保護(hù)層(9).440mm細(xì)石混凝土土加4%防水劑,內(nèi)內(nèi)配%%c4單層雙向鋼鋼筋,@250,每6m設(shè)分格縫,縫縫內(nèi)填高分子子密封膏。2.非上人屋屋面做法(由由下至上)::(1).結(jié)構(gòu)層(2).加氣混凝土土找坡最薄處處30(3).20厚1:2.5水泥砂漿找找平(4).刷底膠劑一一道(材質(zhì)同同下)(5).4厚SBS改性瀝青防防水卷材,同同材性膠粘劑劑二道(6).30厚1:3水泥砂漿找找平保護(hù)層(7).擠塑聚苯板板保溫層按節(jié)節(jié)能設(shè)計(jì)(8).30厚1:3水泥砂漿找找平層,加4%防水劑。3.屋面雨水水管除注明外外均采用φ110UPPVC管,管卡固固定1200一道。4.屋面防水水為SBS防水卷材防防水層施工過(guò)過(guò)程中應(yīng)按供供貨廠(chǎng)家提供供的施工要求求、操作規(guī)程程和驗(yàn)收規(guī)范范施工并應(yīng)由由專(zhuān)業(yè)施工隊(duì)隊(duì)伍施工。除除本說(shuō)明外,屋屋面做法還應(yīng)應(yīng)符合《屋面面工程技術(shù)規(guī)規(guī)范》GB503345-20004和《屋面工工程質(zhì)量驗(yàn)收收規(guī)范》GB502207-20002的有關(guān)規(guī)定定。室外1.外墻:詳詳立面圖標(biāo)注注。當(dāng)為外墻墻漆時(shí)做法詳詳西南04J5116第64頁(yè)5313施工。為面面磚時(shí)做法詳詳西南04J5116第68頁(yè)5408、5409施工;外墻面磚粘粘結(jié)強(qiáng)度不應(yīng)應(yīng)小于0.6MPPa。2.散水:建建筑四周均應(yīng)應(yīng)設(shè)散水,做做法詳西南04J8112第4頁(yè)2施工。3.室外臺(tái)階階:臺(tái)階做法法參國(guó)標(biāo)02J0003第7頁(yè)4b施工,面層層改為40花崗石。4.明溝由建建設(shè)方根據(jù)場(chǎng)場(chǎng)地周邊水量量自理。門(mén)窗1.窗框采用白白色塑鋼;面面積大于1.5m2的窗玻璃或或玻璃底邊離離最終裝修面面距離小于500的地窗、面面積大于0.5m22的有框門(mén)玻玻璃均應(yīng)采用用安全玻璃,落落地窗內(nèi)做有1100高護(hù)窗欄桿桿,且窗面積積小于1.5m22的可不采用用安全玻璃。無(wú)無(wú)框玻璃門(mén)應(yīng)應(yīng)采用公稱(chēng)厚厚度不小于10mm的鋼化玻璃璃;玻璃具體體厚度由施工工單位和甲方方按《建筑玻玻璃應(yīng)用技術(shù)術(shù)規(guī)程》安裝裝施工。門(mén)窗窗的氣密性Ⅱ級(jí),滲漏性Ⅲ級(jí),抗風(fēng)壓壓強(qiáng)Ⅰ級(jí),保溫性性能Ⅱ級(jí),隔聲性性能Ⅵ級(jí)。2.本工程的門(mén)門(mén)窗采用塑鋼鋼窗,設(shè)計(jì)中中僅提供了洞洞口尺寸、立立面分格、開(kāi)開(kāi)啟方式。詳詳細(xì)構(gòu)造由廠(chǎng)廠(chǎng)商提供,經(jīng)經(jīng)設(shè)計(jì)審查同同意后方能定定貨,材料規(guī)規(guī)格及各項(xiàng)物物理性質(zhì)根據(jù)據(jù)相應(yīng)規(guī)范和和規(guī)定進(jìn)行計(jì)計(jì)算后確定;;經(jīng)甲方和設(shè)設(shè)計(jì)方確認(rèn)后后方能安裝施施工。門(mén)窗立立面均表示洞洞口尺寸,門(mén)門(mén)窗加工尺寸寸要根據(jù)裝修修面厚度由承承包商予以調(diào)調(diào)整。其他:陽(yáng)臺(tái)樓地面均須須作防水處理理,作法參照照衛(wèi)生間防水水作法。局部尺寸與結(jié)施施圖不符時(shí),以以結(jié)施圖為準(zhǔn)準(zhǔn)。3.本工程玻玻璃使用應(yīng)符符合建筑玻璃璃應(yīng)用技術(shù)規(guī)規(guī)程(JGJ1113-20003,J2555-20003)的要求。4.落地窗、玻玻璃門(mén)、玻璃璃隔斷等距地地1.5米處設(shè)置防防撞標(biāo)志。5.本次設(shè)計(jì)計(jì)除外墻裝修修一次完成外外,室內(nèi)僅作初初裝修(清水水房),平面圖中僅僅為示意,需需經(jīng)二次裝修修。6.本說(shuō)明未未盡事宜均按按“建筑施工安安裝工程驗(yàn)收收規(guī)范”執(zhí)行。施工工中應(yīng)嚴(yán)格執(zhí)執(zhí)行國(guó)家各項(xiàng)項(xiàng)施工質(zhì)量驗(yàn)驗(yàn)第三節(jié)工程結(jié)結(jié)構(gòu)設(shè)計(jì)概況況第1條基礎(chǔ)礎(chǔ)工程本工程基礎(chǔ)鉆孔孔樁端支承在在于中風(fēng)化巖巖嵌入中風(fēng)化化基巖0.5m。單樁豎向向承載力特征征值690KN。混凝土強(qiáng)度等級(jí)級(jí):樁C30、承臺(tái)梁C30?;A(chǔ)梁縱向鋼筋筋的錨固長(zhǎng)度度大于或等于于45d,且應(yīng)將縱縱筋伸至樁對(duì)對(duì)邊?;A(chǔ)梁施工中相相鄰跨梁上下下部鋼筋直徑徑相同時(shí)應(yīng)貫貫通為通長(zhǎng)鋼鋼筋,不得切切斷;基礎(chǔ)部部分鋼筋接頭頭應(yīng)采用焊接接或機(jī)械連接接?;油谥猎O(shè)計(jì)標(biāo)標(biāo)高時(shí),應(yīng)盡盡快通知有關(guān)關(guān)方驗(yàn)收后澆澆注基礎(chǔ)砼,宜宜在嵌巖段基基坑濕潤(rùn)狀態(tài)態(tài)(但不得有有積水)澆注注砼。第2條主體體結(jié)構(gòu)1、本工程為磚磚混結(jié)構(gòu),總總層數(shù)7層合理使用用年限50年,地震設(shè)設(shè)防烈度6度。2、活荷載標(biāo)準(zhǔn)準(zhǔn)值基本風(fēng)壓0.44KN/m22,單元樓梯梯間3.5KNN/m2,、衛(wèi)生間間、廚房、客客廳、臥室、上上人屋面2.0KKN/m2,非上人屋屋面0.5KNN/m2。3、負(fù)一層至一一層砼等級(jí)為為C30、其余各層層砼等級(jí)C25.4、受力鋼筋混混凝土保護(hù)層層厚度:環(huán)境類(lèi)別板、墻梁柱<=C20C25-C455<=C20C25-C455<=C20C25-C455一201530253030鋼筋保護(hù)層為受受力鋼筋外緣緣至砼表面的的距離,同時(shí)時(shí)應(yīng)滿(mǎn)足不小小于鋼筋的公公稱(chēng)直徑。預(yù)制鋼筋砼受彎彎構(gòu)件鋼筋端端頭的保護(hù)層層厚度不應(yīng)小小于10mm。板、墻中分布鋼鋼筋保護(hù)層厚厚度不應(yīng)小于于上表中相應(yīng)應(yīng)數(shù)值減10mm,且不應(yīng)小小于10mm,梁、柱中中箍筋和構(gòu)造造銅銹遙保護(hù)護(hù)層厚度不應(yīng)應(yīng)小于15mm。5、鋼筋錨固普通縱向受拉鋼鋼筋的最小錨錨固長(zhǎng)度La(mmm)。板下部縱向受力力鋼筋伸入支支座的錨固長(zhǎng)長(zhǎng)度不應(yīng)小于于5d。第2條現(xiàn)澆板板1、板底鋼筋,短短跨鋼筋置下下排,長(zhǎng)跨鋼鋼筋置上排,板板面鋼筋,短短跨鋼筋置上上,長(zhǎng)跨鋼筋筋置下,伸入入支座的錨固固長(zhǎng)度不應(yīng)小小于5d。2、一般況下板板上孔洞應(yīng)預(yù)預(yù)留,避免事事后開(kāi)槽鑿洞洞。3、板上圓形孔孔洞直徑及矩矩形孔洞寬度度均不大于300時(shí),洞邊不不設(shè)置加強(qiáng)筋筋,受力鋼筋筋可繞過(guò)洞邊邊不切斷。4、板上圓形孔孔洞直徑及矩矩形孔洞寬度度均在300至1000間時(shí),孔洞洞周邊設(shè)置加加強(qiáng)筋。第3條現(xiàn)澆梁梁支承在砌體結(jié)構(gòu)構(gòu)上的鋼筋砼砼梁,在縱向向受力鋼筋的的錨固長(zhǎng)度范范圍內(nèi)應(yīng)配置置不少于兩個(gè)個(gè)箍筋,共直直徑不小于縱縱向受力鋼筋筋最大直徑的的0.25倍,間距不不大于縱向受受力鋼筋最大大直徑的10倍。第4條本工程程3.00m以下墻體采采用M7.5混合砂漿砌MU15頁(yè)巖多孔磚磚,3.000m以上采用M5.0混合砂漿砌MU10頁(yè)巖多孔磚磚。第5條過(guò)梁均均選用圖集為為《03G3222-1》,有板載載為3級(jí),無(wú)板載1級(jí)。預(yù)制板板選用圖集為為《西南04G2331》,荷載級(jí)級(jí)別為4級(jí)。第四節(jié)工程水水電安裝設(shè)計(jì)計(jì)概況第1條給水水系統(tǒng)1、生活給水系系統(tǒng)低由市政政給水管網(wǎng)直直接供水,采采用下行上給給式。本給水水系統(tǒng)最不利利點(diǎn)所需水0.31MMpa。2、生活用水量量;住宅按200升/人,天,最高日用水水量為36.700m/d。3、生活給水管管道采用工作作壓力PN=1..0MPa的PP-R管熱熔連接接。4、給水立管每每層設(shè)一活接接頭,給水管管徑標(biāo)注DN表示外徑。第2條排水系系統(tǒng)1、排水采用雨雨污分流,廢廢污合流制,污污水經(jīng)生化池池處理后排入入市政污水管管網(wǎng),雨水直直接排入市政政雨水管網(wǎng)。生生活污水排入入生化池,經(jīng)經(jīng)處理達(dá)標(biāo)后后排入市政排排水管網(wǎng)。2、生活排水管管、陽(yáng)臺(tái)排水水采用PVC管承插粘接接。廚房、陽(yáng)陽(yáng)臺(tái)地漏采用用帶水封地漏漏,水封高度度H≥50mm。3、排水管和出出戶(hù)管連接應(yīng)應(yīng)用兩只45°彎頭,90°彎須采用帶帶檢查口彎頭頭,支管與主主管連接采用用順?biāo)ɑ蚧蛐比?。所有地漏均均采用水封式式地漏。水封封高?0mm。4、排水管伸縮縮節(jié)安裝,立立管每層設(shè)一一個(gè)伸縮節(jié),橫橫管2至4M設(shè)一伸縮節(jié)節(jié)。5、除特殊說(shuō)明明外,給水閥閥門(mén)井J1-2采用磚砌型型;水表井J-1.AAXB=15500X12200采用磚砌型型。6、除特殊標(biāo)注注外,排水橫橫管按通用坡坡度施工,如如果按通用坡坡度施工有困困難時(shí),可現(xiàn)現(xiàn)場(chǎng)適當(dāng)調(diào)整整,但不得小小于最小坡度度。7、生化處理池池整個(gè)小區(qū)統(tǒng)統(tǒng)一設(shè)置,生生化處理池位位置詳總平面面圖。第3條消火栓栓系統(tǒng)1、本建筑室外外消防用水量量20L/S,室內(nèi)消防防用水量15L/S,室內(nèi)、外外消火栓滅火火系統(tǒng)火災(zāi)延延續(xù)時(shí)間按2小時(shí)計(jì)。2、室內(nèi)消火栓栓采用SS65型,半暗裝裝,配備25米DN65麻織襯膠水水帶,φ19鋁合金水槍槍。室內(nèi)消火火栓栓口離地地1.1米安裝。3、在室外設(shè)置置SQS1000-1.66型水泵接合合器一套。室室外消火栓詳詳總平面,采采用SS1000/65-11.6型。消防管管選用工作壓壓力PN=1..MPa的焊接鋼管管焊接,法蘭蘭連接和絲接接。滅火器配置:1、滅火器配置置按A類(lèi)中危險(xiǎn)等等級(jí)設(shè)置。2、滅火器采用用磷酸銨鹽干干粉滅火器MFA4型,設(shè)置位位置及數(shù)量見(jiàn)見(jiàn)各層平面圖圖,頂部離地地1.5米掛置。第4條材質(zhì)1、給水采用PPP-R管。2、排水:采用用UPVC管。第5條電安安裝強(qiáng)電安裝:1、接地系統(tǒng)采采用TN-C--S;2、電源入戶(hù)作作重復(fù)接地;;3、一般照明、應(yīng)應(yīng)急照明。弱電安裝:1、電話(huà)通訊系系統(tǒng);2、有線(xiàn)電視系系統(tǒng);3、火災(zāi)報(bào)警及及消防聯(lián)動(dòng)控控制系統(tǒng)。第6條防雷雷接地安裝1、本工程為三三類(lèi)防雷建筑筑。2、在女兒墻頂頂暗敷Φ12熱鍍鋅圓鋼鋼作避雷帶。3、利用2Φ116柱內(nèi)鋼筋作作引下線(xiàn),它它必須焊接連連通。第三章施工工總體目標(biāo)我公司將把本工工程列入2009年重點(diǎn)創(chuàng)優(yōu)優(yōu)工程,認(rèn)真真貫徹執(zhí)行公公司質(zhì)量方針針,優(yōu)化調(diào)配配施工技術(shù)力力量、設(shè)備、材材料以及資金金等,采用先先進(jìn)、成熟的的施工工藝和和有效的科學(xué)學(xué)管理體制,確確保優(yōu)質(zhì)快速速完成本工程程,充分實(shí)現(xiàn)現(xiàn)企業(yè)的經(jīng)營(yíng)營(yíng)目標(biāo)。第一節(jié)工程程質(zhì)量目標(biāo)第1條施工中中嚴(yán)格執(zhí)行本本公司建立的的質(zhì)量保證模模式,嚴(yán)格按按照施工設(shè)計(jì)計(jì)圖、圖說(shuō)和和國(guó)家有關(guān)規(guī)規(guī)范、規(guī)程、標(biāo)標(biāo)準(zhǔn)組織施工工和進(jìn)行質(zhì)量量監(jiān)控,以質(zhì)質(zhì)量求速度,以以質(zhì)量效益,以以工作質(zhì)量保保證工序質(zhì)量量,上道工序序不合格絕不不允許下道工工序施工,從從而保證按照照國(guó)家驗(yàn)收標(biāo)標(biāo)準(zhǔn)規(guī)范的要要求一次性交交驗(yàn)達(dá)到合格格標(biāo)準(zhǔn)。第二節(jié)工期期目標(biāo)依據(jù)公公司要求本工工程的工期為為8個(gè)月。從本本工程的設(shè)計(jì)計(jì)情況和施工工條件看,根根據(jù)我司的管管理能力,技技術(shù)水平、設(shè)設(shè)備物資狀況況,在保證質(zhì)質(zhì)量和安全文文明施工的前前提下,在8個(gè)月內(nèi)實(shí)現(xiàn)現(xiàn)全面竣工交交驗(yàn),第三節(jié)安全文文明施工目標(biāo)標(biāo)安全施工管理理目標(biāo)按《建筑施工工安全檢查標(biāo)標(biāo)準(zhǔn)》(JGJ599-99)、《建筑筑機(jī)械使用安安全技術(shù)規(guī)程程》、《施工工現(xiàn)場(chǎng)臨時(shí)用用電安全技術(shù)術(shù)規(guī)范》和《建建筑施工高處處作業(yè)技術(shù)規(guī)規(guī)范》的規(guī)定定實(shí)現(xiàn)現(xiàn)場(chǎng)達(dá)達(dá)標(biāo),杜絕死死亡、重傷事事故和重大設(shè)設(shè)備、交通及及火災(zāi)事故,輕輕傷頻率控制制在1.5%以?xún)?nèi)。文明施工管理理目標(biāo)認(rèn)真貫徹執(zhí)行《重重慶市建筑工工地文明施工工標(biāo)準(zhǔn)》,搞搞好文明施工工。服務(wù)目標(biāo)第1條施工中中“重合同、守守信譽(yù)”,積極接受受建設(shè)方和監(jiān)監(jiān)理單位對(duì)工工程質(zhì)量、施施工進(jìn)度等方方面的監(jiān)督管管理。第2條工程竣竣工后嚴(yán)格執(zhí)執(zhí)行《建設(shè)工工程質(zhì)量管理理?xiàng)l例》有關(guān)關(guān)工程保修的的規(guī)定,主動(dòng)動(dòng)進(jìn)行工程回回訪(fǎng)保修,讓讓建設(shè)方滿(mǎn)意意。第四章施工工部署施工組織機(jī)機(jī)構(gòu)為確保該該工程施工總總體目標(biāo)的實(shí)實(shí)現(xiàn),我公司司按“項(xiàng)目法”模式組織施施工,實(shí)施項(xiàng)項(xiàng)目管理。第1條施工組組織機(jī)構(gòu)的建建立1、組建以項(xiàng)目目經(jīng)理為核心心的項(xiàng)目經(jīng)理理部,一方面面在人、財(cái)、物物的管理上賦賦予項(xiàng)目部更更多的自主權(quán)權(quán),充分發(fā)揮揮項(xiàng)目部的獨(dú)獨(dú)立性和主動(dòng)動(dòng)性;另一方方面公司職能能部門(mén)對(duì)工程程成本、施工工進(jìn)度、安全全文明施工進(jìn)進(jìn)行嚴(yán)格管理理。2、項(xiàng)目經(jīng)理部部下設(shè)技術(shù)負(fù)負(fù)責(zé)和現(xiàn)場(chǎng)負(fù)負(fù)責(zé),共同組組成施工管理理層,做到機(jī)機(jī)構(gòu)精簡(jiǎn),管管理高效。3、施工作業(yè)層層由各專(zhuān)業(yè)班班組組成。第2條項(xiàng)目部部管理職責(zé)的的分配為使工程施工順順利進(jìn)行,項(xiàng)項(xiàng)目部管理層層做到職責(zé)分分配合理、明明確,工作中中既分工又合合作,形成一一個(gè)高效精干干的強(qiáng)有力的的管理班子,其其職責(zé)分配情情況如下:職責(zé)分配表項(xiàng)目經(jīng)理部技術(shù)負(fù)責(zé)管理分工職責(zé)內(nèi)內(nèi)容預(yù)(結(jié))算編制根據(jù)工程進(jìn)度計(jì)計(jì)劃網(wǎng)絡(luò)要求求編制季、月月、(日)生生產(chǎn)計(jì)劃。根據(jù)施工設(shè)計(jì)圖圖及變更通知知等編制施工工圖預(yù)算書(shū),根根據(jù)實(shí)際施工工編制結(jié)算書(shū)書(shū),上報(bào)公司司及建設(shè)方。技術(shù)在技術(shù)負(fù)責(zé)人領(lǐng)領(lǐng)導(dǎo)下解決施施工技術(shù)問(wèn)題題,編制施工工方案、措施施、辦理技術(shù)術(shù)核定單,收收集整理工程程技術(shù)資料,參參與公司分部部分項(xiàng)工程驗(yàn)驗(yàn)收,負(fù)責(zé)新新技術(shù)、新工工藝的推廣應(yīng)應(yīng)用,負(fù)責(zé)各各種原材料及及試件的檢驗(yàn)驗(yàn)及試驗(yàn)?,F(xiàn)場(chǎng)負(fù)責(zé)施工根據(jù)工程進(jìn)度計(jì)計(jì)劃和質(zhì)量要要求組織施工工生產(chǎn),負(fù)責(zé)責(zé)生產(chǎn)平衡調(diào)調(diào)度,作好施施日志,辦理理月勞務(wù)工程程量結(jié)算。質(zhì)量負(fù)責(zé)施工質(zhì)量的的監(jiān)督與檢查查,內(nèi)部核定定分部分項(xiàng)工工程的質(zhì)量等等級(jí),參與編編制質(zhì)量計(jì)劃劃和施工方案案。安全文明施工全面負(fù)責(zé)工地安安全教育。安安全施工檢查查與督促。負(fù)負(fù)責(zé)按《重慶慶市建筑工地地文明施工標(biāo)標(biāo)準(zhǔn)》組織建建成文明工地地。第二節(jié)主要要施工方案安安排基礎(chǔ)土石方基礎(chǔ)土石方施工工采用人工挖挖鑿及風(fēng)鎬鑿鑿打?;炷敛捎米园桧牛瑪嚁嚢铏C(jī)攪拌。塔塔吊送入模。鋼筋1、制作:場(chǎng)內(nèi)內(nèi)、外同時(shí)加加工制作,現(xiàn)現(xiàn)場(chǎng)安裝綁扎扎、焊接。2、連接:(1)樁筋:采采用豎焊(電電渣壓力焊)。(2)梁筋:采采用單面搭接接焊。(3)板筋:II級(jí)鋼筋采用用綁扎連接,II級(jí)鋼筋采用用單面搭接焊焊。模板矩形斷面梁梁、柱模和墻墻模采用木模模,板模采用用10MM覆膜竹膠板板。腳手架主體施工防護(hù)外外架與外裝飾飾施工外腳手手架使用,采采用雙排外架架。砌筑及內(nèi)內(nèi)裝飾施工采采用門(mén)型架組組成移動(dòng)工具具式腳手架。主要大型機(jī)械設(shè)設(shè)備安排1、塔吊:采用用1臺(tái)QTZ50、臂長(zhǎng)50M,可覆蓋9#樓建筑物。施工段劃分及及施工程序第1條施工段段劃分樓,水水平施工段根根據(jù)設(shè)計(jì)特點(diǎn)點(diǎn)、工作量的的均衡性,展展開(kāi)平行流水水施工,以棟棟間為分界線(xiàn)線(xiàn)。第2條施工順順序本工程以結(jié)構(gòu)工工程施工為先先導(dǎo),分工序序組織流水作作業(yè),主體分分層由下至上上進(jìn)行主體結(jié)結(jié)構(gòu)施工。在在主體結(jié)構(gòu)施施工時(shí)充分利利用工作面插插入樓地面、室室內(nèi)抹灰,封封底后進(jìn)行外外墻裝飾施工工。水、電預(yù)預(yù)留孔洞和預(yù)預(yù)埋管線(xiàn)隨樓樓板、墻體施施工留準(zhǔn)留齊齊,水電安裝裝與土建裝飾飾交叉作業(yè),協(xié)協(xié)調(diào)配合。第3條施工流流程1、土建工程施施工流程樁孔、槽開(kāi)挖樁基、地梁梁板柱砼磚墻砌筑樁孔、槽開(kāi)挖樁基、地梁梁板柱砼磚墻砌筑內(nèi)抹灰樓地面油漆涂料欄桿、門(mén)窗安裝內(nèi)抹灰樓地面油漆涂料欄桿、門(mén)窗安裝外墻裝飾外墻裝飾2、安裝工程施施工流程給排水安裝立管安裝橫管、支管安裝消防設(shè)備安裝調(diào)試預(yù)留預(yù)埋立管安裝橫管、支管安裝消防設(shè)備安裝調(diào)試預(yù)留預(yù)埋電氣安裝調(diào)試裝燈具開(kāi)關(guān)插座安裝線(xiàn)管安裝埋線(xiàn)路敷設(shè)調(diào)試裝燈具開(kāi)關(guān)插座安裝線(xiàn)管安裝埋線(xiàn)路敷設(shè)第四節(jié)施施工資源配置置第1條管理人人員及勞動(dòng)力力安排1、項(xiàng)目經(jīng)理部部管理人員安安排公司堅(jiān)持“高質(zhì)質(zhì)量的產(chǎn)品需需要高素質(zhì)的的人來(lái)創(chuàng)造”,對(duì)參與本本工程建設(shè)的的所有人員均均要進(jìn)行資格格認(rèn)證和業(yè)績(jī)績(jī)考核,并按按照重慶市建建委《關(guān)于開(kāi)開(kāi)展2000年建筑施工工現(xiàn)場(chǎng)做作業(yè)業(yè)人員持證上上崗檢查標(biāo)準(zhǔn)準(zhǔn)》(渝建發(fā)發(fā)[20000]59號(hào)文)配備備足夠的具有有相關(guān)證件的的管理人員,明明確崗位職責(zé)責(zé)權(quán)限,變“人管人”為“制度管人”。項(xiàng)目部管管理人員安排排如下表:序號(hào)人員具有資格格數(shù)量1項(xiàng)目經(jīng)理二級(jí)項(xiàng)目經(jīng)理、工工程師12現(xiàn)場(chǎng)負(fù)責(zé)人工程師13技術(shù)負(fù)責(zé)人工程師、施工員員證14施工員施工員證15質(zhì)檢員質(zhì)檢員證16安全員17檔案員檔案員證18機(jī)械管理員材料員證19材料采購(gòu)員材料員證110庫(kù)管員材料員證12、勞動(dòng)力安排排作業(yè)人員資質(zhì)要要求序號(hào)人員員具有資格格1班組長(zhǎng)職業(yè)技能崗位證證書(shū),中級(jí)以以上2技工職業(yè)技能崗位證證書(shū),初級(jí)以以上3特殊工種人員特種作業(yè)人員操操作證,職業(yè)業(yè)技能崗位證證書(shū)4普工初中以上學(xué)歷和和具有相關(guān)經(jīng)經(jīng)驗(yàn),勞務(wù)技技工證基礎(chǔ)施工階段勞勞動(dòng)力計(jì)劃序號(hào)工種種數(shù)量工作內(nèi)容容1石工30基礎(chǔ)土石方人工工挖鑿2鋼筋工15基礎(chǔ)鋼筋制作及及安裝綁扎3砼工15澆筑并養(yǎng)護(hù)砼,拌拌制砼4電焊工3現(xiàn)場(chǎng)焊接工作5水電工3預(yù)留、預(yù)埋、現(xiàn)現(xiàn)場(chǎng)施工用水水、用電及維維修6機(jī)操工4攪拌機(jī)操作7普工10現(xiàn)場(chǎng)零星工作(3)主體施工工階段勞動(dòng)力力計(jì)劃工種數(shù)量(人)工作內(nèi)容容模板、架子工50搭拆模板、腳手手架、外架及及砌筑腳手架架鋼筋工26主體鋼筋制作、綁綁扎砼工20現(xiàn)場(chǎng)砼澆筑、養(yǎng)養(yǎng)護(hù)磚工20墻體砌筑電焊工6現(xiàn)場(chǎng)焊接鋼筋水電工16預(yù)留、預(yù)埋、現(xiàn)現(xiàn)場(chǎng)施工用水水、用電及維維修塔吊工2塔吊操作指揮工2塔吊指揮機(jī)操工4砼、砂漿攪拌機(jī)機(jī)操作普工30場(chǎng)內(nèi)零星工作(4)裝飾及安安裝施工階段段勞動(dòng)力計(jì)劃劃工種數(shù)量(人)工作內(nèi)容容抹灰工20內(nèi)、外抹灰、面面磚,水泥砂砂漿樓地面油漆、涂料工13天棚及墻面涂料料,欄桿扶手手油漆模板工12模板安裝防水工10屋面、衛(wèi)生間防防水電工10電氣管線(xiàn)敷設(shè)、電電氣設(shè)備安裝裝管工、鉗工10給排水管道、設(shè)設(shè)備安裝塔吊工2塔吊操作指揮工2塔吊指揮機(jī)操工4攪灰機(jī)操作普工30輔助土建裝飾及及安裝工程施施工第2條主要施施工機(jī)具、設(shè)設(shè)備及辦公配配置1、土建施工設(shè)設(shè)備機(jī)具計(jì)劃劃序號(hào)機(jī)械名稱(chēng)稱(chēng)型號(hào)單位數(shù)量單機(jī)功率備注1塔吊QTZ50臺(tái)128KW2攪拌機(jī)UJ100臺(tái)24.0KW3交流電焊機(jī)BX3-5000臺(tái)138.6KVAA后期用于水電安安裝4豎向電渣壓焊機(jī)機(jī)JSD-6000臺(tái)645KVA5插入式振動(dòng)器ZX50臺(tái)41.1KW6木工圓盤(pán)鋸MJ114臺(tái)23.0KW7污水泵DN75臺(tái)123.0KW8經(jīng)緯儀J2臺(tái)19水準(zhǔn)儀DS3臺(tái)22、辦公設(shè)備需需用計(jì)劃序號(hào)名稱(chēng)用途單位數(shù)量1照像機(jī)圖片資料臺(tái)12電話(huà)機(jī)內(nèi)外聯(lián)系臺(tái)13計(jì)算機(jī)現(xiàn)場(chǎng)辦公臺(tái)14打印機(jī)現(xiàn)場(chǎng)辦公臺(tái)15復(fù)印機(jī)現(xiàn)場(chǎng)辦公臺(tái)16掃描儀現(xiàn)場(chǎng)辦公臺(tái)1第3條主要要周轉(zhuǎn)材料需需用計(jì)劃序號(hào)名稱(chēng)單位數(shù)量備注1木模板(12MMM厚木枋)㎡3000按三層配備210MM覆膜竹竹膠板㎡4000按三層配備348鋼管米25000按三層配備4扣件顆20000按三層配備5密目安全網(wǎng)㎡50006楠竹跳板塊4000第4條資金計(jì)計(jì)劃確保本工程建設(shè)設(shè)資金實(shí)行專(zhuān)專(zhuān)款專(zhuān)用,絕絕不挪作他用用,根據(jù)施工工圖預(yù)算和進(jìn)進(jìn)度計(jì)劃作好好資金的計(jì)劃劃的籌備工作作。第五章施施工進(jìn)度計(jì)劃劃第一節(jié)工期控控制目標(biāo)第一條為了滿(mǎn)滿(mǎn)足建設(shè)方的的需求,為了了迅速發(fā)揮工工程效益和基基本建設(shè)投資資效益,本工工程目標(biāo)工期期為10個(gè)月。詳見(jiàn)見(jiàn)施工進(jìn)度計(jì)計(jì)劃圖。第二節(jié)施工工進(jìn)度計(jì)劃第1條施工準(zhǔn)準(zhǔn)備:中標(biāo)后后本公司將立立即進(jìn)入施工工準(zhǔn)備期,進(jìn)進(jìn)行測(cè)量放線(xiàn)線(xiàn),臨設(shè)搭建建、機(jī)具材料料選購(gòu)、進(jìn)場(chǎng)場(chǎng),施工人員員進(jìn)場(chǎng)等工作作。施工準(zhǔn)備備期約10天。如果一一切準(zhǔn)備順利利,并無(wú)特殊殊情況發(fā)生,人人工孔樁可在在施工準(zhǔn)備期期內(nèi)插入,贏贏得時(shí)間。第2條基礎(chǔ)工工程施工中,與與質(zhì)監(jiān)協(xié)調(diào)::進(jìn)行不均分分段基礎(chǔ)驗(yàn)收收,為形成主主體工程流水水段作業(yè)。第3條主體施施工時(shí),為爭(zhēng)爭(zhēng)取工期和時(shí)時(shí)間,在質(zhì)監(jiān)監(jiān)同意的情況況下,可實(shí)行行分次主體結(jié)結(jié)構(gòu)驗(yàn)收,便便于內(nèi)裝修的的插入。第4條主體驗(yàn)驗(yàn)收后,將屋屋面、內(nèi)裝修修、外裝修、樓樓地面、涂料料安裝,同時(shí)時(shí)進(jìn)行“水平、垂直直交叉立面先先后施工法”。第三節(jié)繪制制施工進(jìn)度計(jì)計(jì)劃為滿(mǎn)足工期目標(biāo)標(biāo),我司開(kāi)會(huì)會(huì)研究,制定定措施,采取取具體辦法,采采用先進(jìn)的科科學(xué)的網(wǎng)絡(luò)計(jì)計(jì)劃進(jìn)行編制制,繪出本工工程施工進(jìn)度度計(jì)劃。第四節(jié)工期期保證措施第1條該工程程為我司的重重點(diǎn)工程,絕絕對(duì)能做到資資金、機(jī)具、材材料、人員等等問(wèn)題的優(yōu)先先考慮和解決決。第2條工程施施工,認(rèn)真執(zhí)執(zhí)行工程部署署中的各項(xiàng)要要求,分別以以基礎(chǔ)、主體體、內(nèi)外裝飾飾為各個(gè)時(shí)期期的重點(diǎn)和先先導(dǎo)并組織部部署,實(shí)行平平面分段,立立面分層,同同步流水。有有節(jié)奏、有順順序的施工,形形成主要分部部分項(xiàng)工程在在時(shí)間上,空空間上達(dá)到緊緊密配合,復(fù)復(fù)式推進(jìn)的目目的,同時(shí)配配合設(shè)備安裝裝的交叉施工工,同步進(jìn)行行,確保工程程進(jìn)度計(jì)劃的的實(shí)現(xiàn)。第3條加班加加點(diǎn),雙班施施工。第4條為使夜夜間施工滿(mǎn)足足足夠照明,現(xiàn)現(xiàn)場(chǎng)安裝兩盞盞照明太陽(yáng)鏑鏑燈。第5條為防止止停電,現(xiàn)場(chǎng)場(chǎng)設(shè)置一臺(tái)120KW的柴油發(fā)電電機(jī),以保障障停電期間現(xiàn)現(xiàn)場(chǎng)不停工。第6條為保證證工期,必要要時(shí),可投入入安裝1臺(tái)龍門(mén)提升升架,以解決決垂直運(yùn)輸量量的矛盾。第7條所有施施工隊(duì)伍和人人員必須經(jīng)過(guò)過(guò)精挑選,特特別是各技術(shù)術(shù)班組,必須須是第一流的的施工隊(duì)伍,充充分發(fā)揮優(yōu)秀秀企業(yè)技術(shù)力力量雄厚。機(jī)機(jī)械化程度高高,效率快,質(zhì)質(zhì)量好的優(yōu)勢(shì)勢(shì),確保工程程按時(shí)完成。第8條在本工工程中,大力力推廣“四新”技術(shù),向新新科技要速度度要質(zhì)量。工工程開(kāi)工后,根根據(jù)設(shè)計(jì)圖紙紙,施工單位位將提出采用用各種新材料料,新工藝的的詳細(xì)方案,在在與建設(shè)方和和設(shè)計(jì)院討論論同意后實(shí)施施。第9條指揮部部每半月與建建設(shè)單位一同同召開(kāi)一次工工期質(zhì)量協(xié)調(diào)調(diào)會(huì)。第10條公司司對(duì)項(xiàng)目的工工期和質(zhì)量實(shí)實(shí)行每星期檢檢查一次,每每月考核一次次,督促項(xiàng)目目每月按形象象進(jìn)度計(jì)劃完完成任務(wù)。第11條本工工程復(fù)雜、工工序多,相互互交叉施工,按按照控制工期期完成。第12條節(jié)假假日一律不休休息,連續(xù)作作戰(zhàn)。第13條遇雨雨季不停工,采采取搭設(shè)防雨雨棚、帶雨衣衣進(jìn)行作業(yè)。第六章施施工總平面布布置第一節(jié)施工工總平面布置置第1條施工道道路按照施工部署的的安排,工程程一開(kāi)工修建建圍墻施工道道路、人行道道路。第2條場(chǎng)地排排水系統(tǒng)結(jié)合施工現(xiàn)場(chǎng)地地形,同時(shí)利利用工程設(shè)計(jì)計(jì)排水溝修建建施工排水系系統(tǒng)(包括沉沉砂井),排排往現(xiàn)場(chǎng)下水水道。第3條施工供供水系統(tǒng)采用圍繞工程的的環(huán)形供水網(wǎng)網(wǎng);利用工程程設(shè)計(jì)的主上上水管安裝,解解決施工名層層用水,并利利用地下室設(shè)設(shè)計(jì)蓄水池,供供停水時(shí)使用用。第4條施工用用電系統(tǒng)在建設(shè)方指定電電接口處搭線(xiàn)線(xiàn),并設(shè)配電電房。施工用電布置主主要考慮要避避開(kāi)樓區(qū)施工工空間,禁止止設(shè)置穿越施施工區(qū)架空線(xiàn)線(xiàn)路,認(rèn)真執(zhí)執(zhí)行臨時(shí)用電電的部署和安安全要求。第5條垂直運(yùn)運(yùn)輸機(jī)具的設(shè)設(shè)置為解決施工進(jìn)度度和施工需用用吊次,確定定安裝四臺(tái)40m臂長(zhǎng)的QTZ40型自升式塔塔吊,能全部部解決施工面面垂直和水平平運(yùn)輸。第6條生產(chǎn)臨臨設(shè)布置1、為保證塔吊吊的合理利用用,滿(mǎn)足施工工進(jìn)度的需要要,分別設(shè)2個(gè)砂漿攪拌拌站,設(shè)水泥泥庫(kù)房一座。2、砼攪拌站布布置:詳總平面布置圖圖3、鋼筋加工房房與模板加工工房布置按施工進(jìn)度要求求,根據(jù)鋼筋筋堆場(chǎng)、鋼筋筋加工、鋼筋筋半成品堆放放占地大致相相等的經(jīng)驗(yàn),現(xiàn)現(xiàn)場(chǎng)設(shè)鋼筋加加工房;模板加工,堆放放根據(jù)經(jīng)驗(yàn)分分析設(shè)置模板板加工房。根據(jù)以上情況決決定,鋼筋加加工房,模板板加工房均設(shè)設(shè)在本工程的的中部,便于于使用。4、在本工程設(shè)設(shè)一主大門(mén),大大門(mén)設(shè)門(mén)衛(wèi)、庫(kù)庫(kù)房、辦公室室等。5、以上平面布布置詳見(jiàn)“施工平面布布置圖”。第七章施工工關(guān)系協(xié)調(diào)與與工作配合本工程工期緊、質(zhì)質(zhì)量要求高、要要想真正搞好好本工程,施施工協(xié)調(diào)與配配合,是很重重要的關(guān)鍵之之一,必須認(rèn)認(rèn)真對(duì)待。第一節(jié)主要要關(guān)系第1條企業(yè)業(yè)內(nèi)部關(guān)系企業(yè)內(nèi)部各種關(guān)關(guān)系,主要是是指項(xiàng)目經(jīng)理理部?jī)?nèi)部關(guān)系系,項(xiàng)目經(jīng)理理部與承包和和作業(yè)層的關(guān)關(guān)系。第2條近外外層關(guān)系近外層關(guān)系是與與承包人有直直接的和間接接的合同關(guān)系系,如發(fā)包人人、監(jiān)理工程程師、設(shè)計(jì)人人……等。近外層層關(guān)系的協(xié)調(diào)調(diào)應(yīng)作為項(xiàng)目目管理組織協(xié)協(xié)調(diào)的重點(diǎn)。第二節(jié)搞好好內(nèi)部關(guān)系的的協(xié)調(diào)與配合合第1條項(xiàng)目目部應(yīng)認(rèn)真執(zhí)執(zhí)行各項(xiàng)規(guī)章章制度,做思思想政治工作作,加強(qiáng)教育育培訓(xùn),提高高人員素質(zhì),統(tǒng)統(tǒng)一認(rèn)識(shí)、統(tǒng)統(tǒng)一行動(dòng)。第2條加強(qiáng)強(qiáng)各部門(mén)間、上上下級(jí)之間的的信息勾通,嚴(yán)嚴(yán)格按已經(jīng)制制定并通過(guò)的的工作流程進(jìn)進(jìn)行工作。第3條項(xiàng)目目部?jī)?nèi)部做好好需求計(jì)劃的的編制,平衡衡,并認(rèn)真執(zhí)執(zhí)行各項(xiàng)計(jì)劃劃。同時(shí),加加強(qiáng)調(diào)度工作作,排除各種種干擾或障礙礙,充分發(fā)揮揮調(diào)度系統(tǒng)和和各個(gè)調(diào)度人人員的作用。第三節(jié)近外外層關(guān)系的協(xié)協(xié)調(diào)第1條與發(fā)發(fā)包方、監(jiān)理理工程師的關(guān)關(guān)系協(xié)調(diào)及配配合工作在工程施工中,項(xiàng)項(xiàng)目部與發(fā)包包方、監(jiān)理工工程師之間的的關(guān)系始終貫貫穿于施工項(xiàng)項(xiàng)目的全過(guò)程程。所以,項(xiàng)項(xiàng)目部與兩方方間,應(yīng)在施施工合同,經(jīng)經(jīng)濟(jì)問(wèn)題、質(zhì)質(zhì)量問(wèn)題和進(jìn)進(jìn)度問(wèn)題上必必須保持一致致。從而,有有利于工作,有有利于質(zhì)量和和經(jīng)濟(jì)效益。1、主動(dòng)為發(fā)包包方、監(jiān)理工工程師按要求求提供和作好好以下各項(xiàng)工工作,并征得得批準(zhǔn)后設(shè)施施。施工組織設(shè)計(jì),專(zhuān)專(zhuān)項(xiàng)施工方案案和技術(shù)措施施??傮w工作施工總總進(jìn)度計(jì)劃,每每月施工進(jìn)度度計(jì)劃。每月完成形象進(jìn)進(jìn)度報(bào)表和撥撥款申請(qǐng)。應(yīng)由發(fā)包人采購(gòu)購(gòu),加工、供供應(yīng)的材料、設(shè)設(shè)備等計(jì)劃。2、積極配合各各種材料的復(fù)復(fù)送檢工作,保保證材料質(zhì)量量得到預(yù)控。同同時(shí)提交各種種檢測(cè)結(jié)果報(bào)報(bào)告。3、認(rèn)真執(zhí)行并并填寫(xiě)監(jiān)理要要求的各種報(bào)報(bào)驗(yàn)資料和其其它報(bào)表。4、堅(jiān)持“上不不清、下不接接”的原則,凡凡是檢查不合合格的項(xiàng)目必必須認(rèn)真返工工重做,直到到經(jīng)兩方檢查查合格為止,再再進(jìn)行下一步步工序施工。第2條與設(shè)設(shè)計(jì)單位的工工作配合與協(xié)協(xié)調(diào)1、一旦中標(biāo),迅迅速與設(shè)計(jì)單單位聯(lián)系,更更進(jìn)一步了解解和理解設(shè)計(jì)計(jì)人員的構(gòu)思思。讓施工作作品更能體現(xiàn)現(xiàn)設(shè)計(jì)意圖。2、認(rèn)真學(xué)習(xí)設(shè)設(shè)計(jì)施工圖,領(lǐng)領(lǐng)會(huì)設(shè)計(jì)意圖圖。將發(fā)現(xiàn)的的問(wèn)題書(shū)面整整理,交設(shè)計(jì)計(jì)人員處理回回復(fù)。3、對(duì)一些特殊殊的重要的施施工項(xiàng)目,施施工單位主動(dòng)動(dòng)將施工方案案交設(shè)計(jì)部門(mén)門(mén)證求意見(jiàn),對(duì)對(duì)設(shè)計(jì)單位提提出的建議和和問(wèn)題。虛心心接受,認(rèn)真真整改。4、施工單位主主動(dòng)為設(shè)計(jì)單單位到施工現(xiàn)現(xiàn)場(chǎng)的工作人人員提供方便便、熱情、周周到服務(wù)。第3條土建建施工與安裝裝施工工作配配合與協(xié)調(diào)土建施工與設(shè)備備安裝不屬同同一專(zhuān)業(yè),但但在本工程中中,土建量較較大,戰(zhàn)線(xiàn)相相對(duì)較長(zhǎng);安安裝量較小,涉涉及面較寬。兩兩者缺一不可可。在工程工工期緊,質(zhì)量量要求高的大大前提下,工工程項(xiàng)目部?jī)?nèi)內(nèi)部各方應(yīng)團(tuán)團(tuán)結(jié)一致,互互相配合,按按進(jìn)度要求按按時(shí)完成各項(xiàng)項(xiàng)工作;保證證工程質(zhì)量。第八章保證工工程進(jìn)度措施施第一節(jié)分分階段控制工工期第1條施工準(zhǔn)準(zhǔn)備:盡快組組織項(xiàng)目部工工作班子,接到中標(biāo)通通知書(shū)后,主主要成員到位位,以最快的速速度投入工作作,編制施工工準(zhǔn)備計(jì)劃,抓抓緊完成三通通一平,根據(jù)據(jù)“施工方案”總平面布置置圖的要求,進(jìn)一步深化化,做好現(xiàn)場(chǎng)場(chǎng)的布置,抓抓緊搭建臨時(shí)時(shí)設(shè)施,安排排編制材料、設(shè)設(shè)備、勞動(dòng)力力的進(jìn)場(chǎng)計(jì)劃劃,爭(zhēng)取盡早早開(kāi)工。第2條加快土土石方開(kāi)挖和和基礎(chǔ)施工::必須按總進(jìn)進(jìn)度計(jì)劃的要要求,如期完完成土石方挖挖填工作,并將第一流流水段的基礎(chǔ)礎(chǔ)如期完工,使使上部結(jié)構(gòu)按按時(shí)或提前插插入,并卡死死基礎(chǔ)工程的的竣工日期,此是影響總總工期的關(guān)鍵鍵。第3條上部結(jié)結(jié)構(gòu)工程施工工:編制按流流水段分樓層層的施工計(jì)劃劃,確保月進(jìn)進(jìn)度計(jì)劃的目目標(biāo),只能超超前不能拖后后,如發(fā)生意意外,則采取取有效的組織織措施彌補(bǔ),絕絕不能欠帳。主主體封頂時(shí)間間作為控制總總進(jìn)度計(jì)劃的的關(guān)鍵標(biāo)志,千千方百計(jì)確保保,力爭(zhēng)提前前。第4條安裝工工程施工:安安裝工程的預(yù)預(yù)留預(yù)埋工作作,必須與土土建施工同步步進(jìn)行。項(xiàng)目目部認(rèn)真加強(qiáng)強(qiáng)安裝和土建建的協(xié)調(diào)工作作,技術(shù)方面面的協(xié)調(diào),由由項(xiàng)目部主管管工程師負(fù)責(zé)責(zé),處理必須須及時(shí),不得得影響工程進(jìn)進(jìn)度。第5條收尾工工程:收尾工工程應(yīng)十分重重視,千萬(wàn)不不能松勁,收收尾階段編制制周密的工作作計(jì)劃,所有有工作內(nèi)容均均應(yīng)在預(yù)定的的工程預(yù)驗(yàn)收收之前完成,并并設(shè)專(zhuān)人負(fù)責(zé)責(zé)檢查,做到到逐項(xiàng)落實(shí)。第二節(jié)進(jìn)進(jìn)度計(jì)劃編制制與管理第1條為確保??傔M(jìn)度計(jì)劃劃目標(biāo),必須須編制季度、月月度計(jì)劃(內(nèi)業(yè)技術(shù)員員負(fù)責(zé))和周、日計(jì)計(jì)劃(專(zhuān)業(yè)施工員員負(fù)責(zé)),以分段計(jì)計(jì)劃的實(shí)施保保證總計(jì)劃的的實(shí)現(xiàn)。對(duì)各各種計(jì)劃的執(zhí)執(zhí)行情況,建建立定期檢查查制度。分階階段計(jì)劃只能能超前總進(jìn)度度計(jì)劃,當(dāng)階階段計(jì)劃執(zhí)行行情況與總進(jìn)進(jìn)度計(jì)劃發(fā)生生滯后時(shí),及及時(shí)報(bào)告項(xiàng)目目經(jīng)理采取果果斷措施限期期跟上,決不不影響總進(jìn)度度計(jì)劃的目標(biāo)標(biāo)。第2條建立每每周工程例會(huì)會(huì)制度(工程緊張施施工階段,必必要時(shí)每周二二次),由總監(jiān)主主持,業(yè)主和和現(xiàn)場(chǎng)參戰(zhàn)各各方參加,會(huì)會(huì)上由項(xiàng)目部部通報(bào)計(jì)劃執(zhí)執(zhí)行情況,協(xié)協(xié)調(diào)施工中出出現(xiàn)的進(jìn)度和和質(zhì)量等有關(guān)關(guān)工程進(jìn)行中中的問(wèn)題。為為進(jìn)度計(jì)劃實(shí)實(shí)施創(chuàng)造有利利條件。會(huì)議議記錄由業(yè)主主、監(jiān)理、施施工三方會(huì)簽簽,印發(fā)相關(guān)關(guān)單位。第3條碰頭會(huì)會(huì)制度每天下下午定時(shí)召開(kāi)開(kāi),由項(xiàng)目部部主管生產(chǎn)的的副經(jīng)理主持持,項(xiàng)目部相相關(guān)管理人員員參加,會(huì)上上決定事項(xiàng)指指定專(zhuān)人檢查查督促貫徹,發(fā)發(fā)現(xiàn)影響進(jìn)度度較大的問(wèn)題題及時(shí)報(bào)告項(xiàng)項(xiàng)目部分管領(lǐng)領(lǐng)導(dǎo)。第4條加強(qiáng)計(jì)計(jì)劃調(diào)度工作作,保證重點(diǎn)點(diǎn)項(xiàng)目和關(guān)鍵鍵工序的連續(xù)續(xù)施工。根據(jù)據(jù)碰頭會(huì)和周周例會(huì)決定的的事項(xiàng)由分管管生產(chǎn)的項(xiàng)目目副經(jīng)理行使使調(diào)度工作,檢檢查執(zhí)行情況況。第5條各階段段的進(jìn)度計(jì)劃劃和完成情況況統(tǒng)計(jì)報(bào)表,以以及主要材料料、設(shè)備的入入場(chǎng)情況,材材料、設(shè)備出出廠(chǎng)和合格證證明、檢驗(yàn)資資料等,保證證按業(yè)主和監(jiān)監(jiān)理的要求,按按時(shí)報(bào)送。第三節(jié)資源源保證第1條公司資資金、設(shè)備、技技術(shù)力量?jī)?yōu)先先保證本工程程的需要,工工程進(jìn)度款專(zhuān)專(zhuān)款專(zhuān)用。第2條工程所所需要材料、設(shè)設(shè)備確保工程程需要,不得得影響工程進(jìn)進(jìn)度計(jì)劃。做做到按工程進(jìn)進(jìn)度計(jì)劃的需需要提前入場(chǎng)場(chǎng),供應(yīng)部門(mén)門(mén)與施工部門(mén)門(mén)做到密切配配合。第3條構(gòu)、配配件和門(mén)窗等等外加工:應(yīng)應(yīng)盡早考核優(yōu)優(yōu)選廠(chǎng)家,落落實(shí)生產(chǎn)廠(chǎng)家家,簽訂合同同,保證工程程進(jìn)度需要的的供貨時(shí)間,提提前一周入場(chǎng)場(chǎng)。第4條勞動(dòng)力力擬在與我司司長(zhǎng)期合作的的隊(duì)伍中選擇擇技術(shù)精湛,具具有相當(dāng)施工工經(jīng)驗(yàn)和管理理能力的隊(duì)伍伍。在與其簽簽訂勞務(wù)合同同時(shí)提出的工工期目標(biāo)。若若發(fā)現(xiàn)勞動(dòng)力力隊(duì)伍不能滿(mǎn)滿(mǎn)足本工程的的進(jìn)度和質(zhì)量量要求時(shí),堅(jiān)堅(jiān)決及時(shí)調(diào)換換。第四節(jié)技術(shù)術(shù)保證措施第1條根據(jù)不不同的施工階階段,制定切切實(shí)可行的施施工方案,采采用分段平行行流水,做到到快節(jié)奏均衡衡流水施工。第2條及時(shí)組組織相關(guān)項(xiàng)目目的工程質(zhì)量量檢驗(yàn)和隱蔽蔽工程的驗(yàn)收收,保證不影影響下一工序序盡快插入和和持續(xù)施工。第3條認(rèn)真研研究工序之間間和工種間之之間的相互搭搭接工作。為為各工種、工工序相互穿插插作業(yè)創(chuàng)造條條件,加快施施工進(jìn)度。第五節(jié)趕工工措施根據(jù)工程工期緊緊、工作量大大的情況,必必需采取相應(yīng)應(yīng)的趕工措施施。第1條根據(jù)工程程需要擬采取取雙班作業(yè)(每晚在22時(shí)以后作業(yè)業(yè),則必須采采取降低噪聲聲的措施)。第2條假節(jié)日日不放假,采采取發(fā)加班工工資或少量輪輪休方式。第3條農(nóng)忙季季節(jié)事前作好好周密安排,動(dòng)動(dòng)員農(nóng)工放棄棄農(nóng)忙假,另另給予一定獎(jiǎng)獎(jiǎng)勵(lì),盡量使使工程進(jìn)度不不受影響。第六節(jié)雨季季施工措施第1條雨季季施工部署1.按雨季施工工的特點(diǎn)區(qū)分分輕重緩急,對(duì)對(duì)于不適于雨雨季施工的項(xiàng)項(xiàng)目適當(dāng)調(diào)整整。但不得影影響總進(jìn)度計(jì)計(jì)劃。2.在施工部署署上要根據(jù)氣氣候變化,內(nèi)內(nèi)、外相結(jié)合合的原則,晴晴天多搞室外外,雨天多搞搞室內(nèi),盡量量縮短雨天露露天作業(yè)時(shí)間間,縮小雨天天露天作業(yè)面面以及采取集集中資源突擊擊作業(yè)的方針針,盡可能的的采取分段、分分部位突擊施施工的方法,對(duì)對(duì)結(jié)構(gòu)已完的的工程,突擊擊將屋面防水水作完,及時(shí)安好落落水管,使室室內(nèi)作業(yè)不受受影響。3.根據(jù)本工程程的特點(diǎn),將將生產(chǎn)計(jì)劃同同雨季施工結(jié)結(jié)合起來(lái),小小雨堅(jiān)持不停停工。搞好雨雨季施工期間間工程材料的的儲(chǔ)備和保護(hù)護(hù)工作。4.加強(qiáng)雨季施施工的安全工工作,施工人人員配備防雨雨用具,做好好防漏電和防防滑工作。第2條雨季施施工措施1.現(xiàn)場(chǎng)排水::按照施工方方案,提前做做好現(xiàn)場(chǎng)排水水設(shè)施,現(xiàn)場(chǎng)場(chǎng)排水采取明明溝與暗管相相結(jié)合,設(shè)集集水井匯水,排排入市政排水水管道或用水水泵強(qiáng)制排水水,保證本工工程雨天施工工期間現(xiàn)場(chǎng)排排水暢通,在在雨后地面不不積水,能最最大限度的減減少雨水對(duì)施施工的影響,確確保施工生產(chǎn)產(chǎn)的順利進(jìn)行行。2.原材料、成成品及半成品品的保護(hù)工作作水泥應(yīng)按不同品品種、標(biāo)號(hào)、出出廠(chǎng)日期和廠(chǎng)廠(chǎng)別分別堆放放。雨季更應(yīng)應(yīng)遵守“先收先用,后后收后用”原則,避免免久存的水泥泥受潮影響質(zhì)質(zhì)量。水泥盡量堆放在在正式的房屋屋內(nèi),要作到到絕對(duì)不使水水泥受潮。雨雨季前要檢查查庫(kù)房,防止止漏雨。露天堆垛要砌磚磚平臺(tái),高度度不小于500,四周設(shè)排排水溝,垛底底鋪油氈,用用防雨蓬布覆覆蓋好。磚和砂石集中堆堆放,堆放在在地勢(shì)較高的的地方,以利利排水。門(mén)窗,加工鐵活活等材料采取取架高、用防防雨蓬布遮蓋蓋或堆放室內(nèi)內(nèi)。3.鉆孔樁施工工時(shí),每個(gè)樁樁位都搭設(shè)防防雨蓬施工,既既可防止雨水水落入樁孔內(nèi)內(nèi),造成基坑坑浸泡,影響響工程質(zhì)量,又又能雨天照常常施工,不影影響工程進(jìn)度度。4.其他現(xiàn)場(chǎng)工棚、倉(cāng)庫(kù)庫(kù)、宿舍等大大小型臨時(shí)工工程應(yīng)在雨季季前修整完畢畢,要保證不不漏、不塌和和周?chē)环e水水。腳手架、纜風(fēng)繩繩等應(yīng)進(jìn)行一一次全面檢查查,每次大風(fēng)風(fēng)雨后也要及及時(shí)復(fù)查,檢檢查中發(fā)現(xiàn)松松動(dòng)、腐蝕情情況應(yīng)及時(shí)做做好處理,搭搭設(shè)的斜(馬)道必須釘好好防滑條?,F(xiàn)場(chǎng)機(jī)電設(shè)備都都應(yīng)有防雨措措施,照明線(xiàn)線(xiàn)檢查有無(wú)混混線(xiàn)、漏電、線(xiàn)線(xiàn)桿有無(wú)埋設(shè)設(shè)不牢、腐蝕蝕等情況,要要及時(shí)處理,保保證正常供電電。加強(qiáng)氣象預(yù)報(bào)收收聽(tīng)記錄工作作,每日下班班前要及時(shí)掌掌握天氣預(yù)報(bào)報(bào)情況,便于于采取措施,做做好防風(fēng)防雨雨、防雷暴工工作。避免在雨天中露露天澆筑砼,連連續(xù)澆筑砼時(shí)時(shí),要準(zhǔn)備足足夠的防雨布布,臨時(shí)遇上上暴雨時(shí)可用用來(lái)覆蓋砼。鋼筋對(duì)焊處搭設(shè)設(shè)防雨棚,焊焊機(jī)必須有防防雨設(shè)施,被被雨淋濕的焊焊機(jī)烘干后方方可施焊。第九章土土建主要施工工方法第一節(jié)施工工測(cè)量第1條根據(jù)業(yè)業(yè)主提供的基基準(zhǔn)點(diǎn)、基準(zhǔn)準(zhǔn)線(xiàn)的座標(biāo)和和水準(zhǔn)點(diǎn),會(huì)會(huì)同業(yè)主聯(lián)系系規(guī)劃部門(mén)放放線(xiàn)辦核定,辦辦理書(shū)面手續(xù)續(xù)后,采取可可行的保護(hù)措措施,防止損損壞。并將其其引測(cè)至場(chǎng)區(qū)區(qū)內(nèi)。第2條按照設(shè)設(shè)計(jì)標(biāo)高和軸軸線(xiàn)座標(biāo)組織織測(cè)量專(zhuān)業(yè)人人員放線(xiàn)。其其主控點(diǎn)應(yīng)請(qǐng)請(qǐng)規(guī)劃部門(mén)放放線(xiàn)辦核定認(rèn)認(rèn)可后,據(jù)以以施工放線(xiàn)(放線(xiàn)辦簽認(rèn)認(rèn)的書(shū)面手續(xù)續(xù)保存作為竣竣工驗(yàn)收資料料)。第3條標(biāo)高控控制:將放線(xiàn)線(xiàn)辦核定的水水準(zhǔn)基點(diǎn)引測(cè)測(cè)至擬建建筑筑物周邊的現(xiàn)現(xiàn)有的建(構(gòu))筑物固定位位置,并加以以保護(hù)。第4條軸線(xiàn)控控制:按設(shè)計(jì)計(jì)平面圖形確確定縱橫座標(biāo)標(biāo)的控制點(diǎn),形形成本工程施施工的控制網(wǎng)網(wǎng)并引伸至場(chǎng)場(chǎng)地周邊在施施工不受影響響的地方設(shè)測(cè)測(cè)點(diǎn),并加以以固定和保護(hù)護(hù)。第5條標(biāo)高和和軸線(xiàn)的測(cè)量量均必須閉合合,防止測(cè)量量產(chǎn)生超規(guī)范范允許的偏差差(閉合差值)。第6條高程傳傳遞:底層結(jié)結(jié)構(gòu)施工后,將將設(shè)計(jì)±0.00標(biāo)高(或加0.5~1.0m)用紅漆標(biāo)在在墻的轉(zhuǎn)角處處,以作控制制標(biāo)高的基點(diǎn)點(diǎn),隨主體上上升進(jìn)度,向向上傳遞,高高層建筑則將將控制標(biāo)高設(shè)設(shè)在電梯豎井井墻上,逐層層向上傳遞,標(biāo)標(biāo)注在每層樓樓面處,借作作樓面標(biāo)高控控制的依據(jù)。第7條軸線(xiàn)傳傳遞:多層部部份可采用吊吊線(xiàn)的方法,但但每隔2~3層用經(jīng)緯儀儀校核。高層層部份則用經(jīng)經(jīng)緯儀向上傳傳遞。第8條保證測(cè)測(cè)量精度措施施1.儀器:采用用J2經(jīng)緯儀(或或用全站儀)測(cè)測(cè)角和豎向軸軸線(xiàn)的投測(cè);;用S3水準(zhǔn)儀測(cè)設(shè)設(shè)標(biāo)高。測(cè)量量器具必須是是經(jīng)法定單位位檢驗(yàn)、鑒定定合格的產(chǎn)品品,并定期復(fù)復(fù)檢。2.設(shè)立專(zhuān)職測(cè)測(cè)量人員負(fù)責(zé)責(zé)定位線(xiàn)的司司測(cè)工作,并并建立測(cè)量計(jì)計(jì)算資料換手手復(fù)核制度。3.軸線(xiàn)控制網(wǎng)網(wǎng)點(diǎn)的計(jì)算資資料和移至建建筑物周邊建建(構(gòu))筑上上固定位置的的水準(zhǔn)點(diǎn),報(bào)報(bào)請(qǐng)監(jiān)理工程程師確認(rèn)后,方方可施工。4.建筑物的軸軸線(xiàn)和標(biāo)高每每隔2層全面進(jìn)行行一次檢測(cè)。主主體完工后必必須進(jìn)行全面面檢測(cè),經(jīng)監(jiān)監(jiān)理人員確認(rèn)認(rèn)后,報(bào)請(qǐng)規(guī)規(guī)劃部門(mén)放線(xiàn)線(xiàn)辦核定。第二節(jié)土石石方施工第1條施工前前按2.0m(或5.0m)的方格網(wǎng)測(cè)測(cè)量現(xiàn)場(chǎng)的實(shí)實(shí)際地貌,并并根據(jù)設(shè)計(jì)圖圖確定開(kāi)挖范范圍,開(kāi)挖深深度、邊坡設(shè)設(shè)計(jì)、計(jì)算開(kāi)開(kāi)挖工程量后后經(jīng)業(yè)主或監(jiān)監(jiān)理人員簽認(rèn)認(rèn)。第2條制定土土石方開(kāi)挖方方案:應(yīng)根據(jù)據(jù)開(kāi)挖工程量量和場(chǎng)地的環(huán)環(huán)境狀況編制制,并將技術(shù)術(shù)安全列為重重點(diǎn),由項(xiàng)目目技術(shù)負(fù)責(zé)人人組織編制,公公司審批。第3條土石方方開(kāi)挖1.石方開(kāi)挖采采用人工開(kāi)鑿鑿。2.將土方挖完完后,及時(shí)測(cè)測(cè)量基巖面的的方格網(wǎng),計(jì)計(jì)算開(kāi)挖巖石石的工程量。3.根據(jù)現(xiàn)場(chǎng)實(shí)實(shí)際情況,在在地面上離開(kāi)開(kāi)挖邊線(xiàn)一定定距離設(shè)500高磚砌擋水水墻(水泥砂砂漿抹面),防防止地面水流流入坑內(nèi)。施施工現(xiàn)場(chǎng)排水水溝的布置詳詳施工總平面面布置圖。4.備用2-33臺(tái)抽水機(jī)排排坑內(nèi)積水。施施工中在坑底底設(shè)2-3個(gè)集水坑。第三節(jié)基礎(chǔ)礎(chǔ)工程第1條鉆孔樁樁施工1.按照《建筑筑樁基技術(shù)規(guī)規(guī)范》(JGJ994—94)的要求組織織施工。施工工前根據(jù)布樁樁情況,選擇擇幾個(gè)有代表表性和深度較較大的樁做試試樁,探索地地質(zhì)情況和成成孔的方法。2.施工順序::測(cè)量放線(xiàn)→鉆孔樁施工→樁坑驗(yàn)底→安鋼筋籠→澆灌樁身砼→安上部結(jié)構(gòu)構(gòu)墻柱插筋。3.鉆孔施工前清除樁位位雜物,平整整場(chǎng)地至樁頂頂設(shè)計(jì)標(biāo)高,鉆鉆孔順序依據(jù)據(jù)土質(zhì)、樁孔孔布置及工程程進(jìn)度而定。出出土必須提運(yùn)運(yùn)至孔邊1m以外,并及及時(shí)集中運(yùn)出出場(chǎng)地外。樁的凈距小于22倍樁徑且小小于2.5m時(shí),應(yīng)間隔隔施工。相鄰兩樁樁底的的高差較大時(shí)時(shí)應(yīng)請(qǐng)?jiān)O(shè)計(jì)人人現(xiàn)場(chǎng)研究處處理。樁中心線(xiàn)控制::鉆孔樁樁孔孔完成后隱蔽蔽驗(yàn)收時(shí),必必須檢查樁中中心的偏差值值應(yīng)在規(guī)范允允許的范圍內(nèi)內(nèi)。若施工中發(fā)現(xiàn)流流砂和涌土成成孔有困難時(shí)時(shí),及時(shí)報(bào)告告項(xiàng)目部和公公司技術(shù)負(fù)責(zé)責(zé)人,通知地地勘單位和設(shè)設(shè)計(jì)人到現(xiàn)場(chǎng)場(chǎng)會(huì)診,研究究可行的施工工方案。4.鉆孔樁為圓圓形,樁底嵌嵌入中風(fēng)化巖巖層,巖石天天然濕度單軸軸抗壓強(qiáng)度及及嵌巖深度按按設(shè)計(jì)要求,經(jīng)經(jīng)取芯巖樣檢檢驗(yàn)符合,并并經(jīng)設(shè)計(jì)和監(jiān)監(jiān)理、質(zhì)檢等等單位確認(rèn)后后,再進(jìn)行樁樁的后續(xù)施工工。5.開(kāi)挖至達(dá)到到設(shè)計(jì)要求的的巖石強(qiáng)度,辦辦理隱蔽驗(yàn)收收手續(xù)后,立立即安放鋼筋筋籠。6.安放鋼筋籠籠:根據(jù)各樁樁成孔深度,下下料制作綁扎扎鋼筋籠。鋼鋼筋骨架可整整體制作或分分節(jié)制作,塔塔吊吊裝就位位,每隔2m設(shè)置加勁筋筋一道或按設(shè)設(shè)計(jì)。經(jīng)檢查查合格的鋼筋筋籠,由塔吊吊送到孔內(nèi),就就位時(shí)應(yīng)使鋼鋼筋籠中心與與樁孔中心一一致,吊直扶扶穩(wěn),緩慢下下沉,避免碰碰撞孔壁。整整個(gè)鋼筋籠下下沉至設(shè)計(jì)位位置核對(duì)樁中中心后應(yīng)及時(shí)時(shí)固定,復(fù)查查清孔后的孔孔底沉渣厚度度,沉淀物厚厚度不得大于于100mm,否則應(yīng)重重新清孔,再再澆灌砼。7.砼澆灌:檢檢查成孔和鋼鋼筋籠安裝質(zhì)質(zhì)量合格后,應(yīng)應(yīng)盡快澆灌砼砼,砼采用機(jī)機(jī)械攪拌,坍坍落度控制在在80~100mm;砼下料采采用串筒分層層澆筑振搗,每每層澆筑高度度不超過(guò)500,用長(zhǎng)振動(dòng)動(dòng)棒隨澆隨振振搗,連續(xù)澆澆筑,不得留留水平施工縫縫。直至樁頂頂標(biāo)高。砼澆澆灌至插筋位位置必須校核核插筋深度、數(shù)數(shù)量是否符合合設(shè)計(jì)要求,并并采取有效的的固定措施。樁樁身砼必須留留試件,每根根樁應(yīng)有1組試件,且且每個(gè)澆筑臺(tái)臺(tái)班不得少于于2組。8.每根樁必須須按規(guī)定要求求及時(shí)辦理隱隱蔽驗(yàn)收。9.安全施工措措施為防止物體墜落落傷人和地面面人員墜入孔孔中,在每個(gè)個(gè)鉆孔樁口設(shè)設(shè)1.0m高安全圍欄欄,圍欄用腳腳手架鋼管搭搭設(shè)。鉆孔樁施工時(shí),機(jī)機(jī)具操作人員員必須戴安全全帽,提運(yùn)土土石時(shí),井下下設(shè)安全區(qū),防防止掉土石傷傷人?,F(xiàn)場(chǎng)設(shè)值班安全全員,特別注注意隨時(shí)隨地地檢查繩索等等吊運(yùn)工具,發(fā)發(fā)現(xiàn)繩索毛糙糙或斷股應(yīng)及及時(shí)更換。棄土應(yīng)遠(yuǎn)離孔口口,防止其周周?chē)淹亮窟^(guò)過(guò)大增加地面面壓力而引起起邊緣場(chǎng)地下下沉,對(duì)鉆孔孔不利,孔周周?chē)嗤炼逊欧艖?yīng)離孔2m以外,當(dāng)天天的土石方應(yīng)應(yīng)當(dāng)天運(yùn)出場(chǎng)場(chǎng)地外。機(jī)動(dòng)動(dòng)車(chē)輛的行駛駛不得對(duì)井壁壁的安全造成成影響。施工現(xiàn)場(chǎng)的一切切電源、電路路的安裝和拆拆除必須由持持證電工操作作,嚴(yán)禁拖地地和埋壓土中中,孔內(nèi)電纜纜、電線(xiàn)應(yīng)有有防磨損、防防潮、防斷裂裂等保護(hù)措施施。施工現(xiàn)場(chǎng)設(shè)置防防護(hù)欄及警戒戒標(biāo)志,未經(jīng)經(jīng)允許非施工工人員不得進(jìn)進(jìn)入施工區(qū)內(nèi)內(nèi),晚上亮紅紅燈警示。施工現(xiàn)場(chǎng)電源應(yīng)應(yīng)有專(zhuān)人負(fù)責(zé)責(zé),如遇停電電或下班應(yīng)切切斷電源,下下班后電源箱箱應(yīng)上鎖。垂垂直運(yùn)輸機(jī)械械設(shè)備應(yīng)有專(zhuān)專(zhuān)人操作及指指揮,并需持持有上崗證者者方可操作指指揮。嚴(yán)格執(zhí)執(zhí)行有關(guān)安全全操作規(guī)程。10.工程質(zhì)量量檢查驗(yàn)收施工中應(yīng)對(duì)成孔孔、清渣、放放置鋼筋籠、灌灌注砼等進(jìn)行行全過(guò)程檢查查。鋼筋籠質(zhì)量檢驗(yàn)驗(yàn)允許偏差::主筋間距±10;長(zhǎng)度±100;箍筋間距±20;直徑±10。砼灌注樁質(zhì)量檢檢驗(yàn)標(biāo)準(zhǔn),如如表:?jiǎn)螛敦Q向承載力力檢驗(yàn),委托托市內(nèi)有權(quán)威威性的檢測(cè)單單位采用可靠靠的動(dòng)測(cè)法進(jìn)進(jìn)行檢測(cè)。第2條地梁施施工基礎(chǔ)梁基槽開(kāi)挖挖時(shí),保證必必要的工作面面,嚴(yán)禁原槽槽澆灌。砼墊墊層比梁底邊邊寬100mm,必須支模模澆灌。鋼筋綁扎時(shí)應(yīng)注注意與樁基的的搭接。其錨錨固長(zhǎng)度、箍箍筋間距,主主筋保護(hù)層必必須符合設(shè)計(jì)計(jì)及規(guī)范的規(guī)規(guī)定。第四節(jié)主體體模板工程第1條模板一一般要求根據(jù)本工程的施施工設(shè)計(jì)圖對(duì)對(duì)鋼筋砼主體體結(jié)構(gòu)的模板板在施工前進(jìn)進(jìn)行專(zhuān)項(xiàng)設(shè)計(jì)計(jì),模板及其其支架應(yīng)具有有足夠的承載載能力、剛度度和穩(wěn)定性,能能可靠地承受受澆筑砼的重重量、側(cè)壓力力及施工荷載載。1.主要采用雙雙面覆膜板、九九夾板或鋼模模。樓(屋)面板均采用用雙面覆膜板板。2.底層支撐在在土層上處,則則將土層夯實(shí)實(shí)加強(qiáng),并在在土層上做擴(kuò)擴(kuò)大砌體基礎(chǔ)礎(chǔ),加墊木枋枋,確保支撐撐不發(fā)生沉陷陷,引起結(jié)構(gòu)構(gòu)體變形。3.跨度和安裝裝高度大于8.0m的構(gòu)件,施施工前模板應(yīng)應(yīng)專(zhuān)項(xiàng)設(shè)計(jì),報(bào)報(bào)公司技術(shù)負(fù)負(fù)責(zé)人審批后后實(shí)施。其它它構(gòu)件模板及及支撐方案由由項(xiàng)目技術(shù)負(fù)負(fù)責(zé)人審批。4.安裝上層模模板及其支架架時(shí),下層樓樓板應(yīng)具有承承受上層荷載載的能力;上上下層支架的的立柱應(yīng)對(duì)準(zhǔn)準(zhǔn),并鋪設(shè)墊墊木(枋)。5.梁柱接頭處處的模板采用用模板組合拼拼裝成定型塊塊重復(fù)使用。6.模板拼裝接接縫做到緊密密,梁柱模要要用泡沫條、膠膠條或其它材材料嵌縫,覆覆膜板拼縫處處用50~80寬油氈平鋪鋪。使不發(fā)生生漏漿,產(chǎn)生生蜂窩麻面。7.固定在模板板上的預(yù)埋件件、預(yù)留孔洞洞均不得遺漏漏,且安裝必必須牢固。8.模板在安裝裝前涂刷脫模模劑,既保證證砼面光潔又又增加模板壽壽命。但不得得沾污鋼筋砼砼接槎處。9.模板安裝時(shí)時(shí)應(yīng)按規(guī)范和和設(shè)計(jì)要求起起拱。10.在澆筑砼砼之前,應(yīng)對(duì)對(duì)模板工程進(jìn)進(jìn)行驗(yàn)收。模模板安裝和澆澆筑砼時(shí)應(yīng)對(duì)對(duì)模板及其支支架進(jìn)行觀(guān)察察和維護(hù)。發(fā)發(fā)生異常情況況,應(yīng)及時(shí)處處理。11.模板的拆拆除:非承重重模板,應(yīng)在在砼強(qiáng)度能保保證其表面及及棱角

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論