版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、,1,7 Diamond Process七顆鉆石流程,2,What is the 7 Diamond Process?七顆鉆石的流程是什么?,The 7 Diamond Process is one of many tools that can be used in the problem solving process. 七顆鉆石流程是可以用來解決質(zhì)量問題的工具之一。 This tool is used to investigate discrepancies discovered by the following: 它可以用來調(diào)查以下方面發(fā)現(xiàn)的差異 Global Customer Audi
2、t System (GCAS) 全球顧客評審 Yard Walk Audits 生產(chǎn)線上巡檢 Verification Stations 檢驗(yàn)工位,3,Purpose of the 7 Diamond Process 7顆鉆石流程的目的,The 7 Diamond Process is a structured way of assessing our manufacturing process to determine whether of not it has failed to meet the quality standard demanded by our customers. 7顆
3、鉆石流程是一個(gè)構(gòu)建好的評價(jià)我們的制造流程是否滿足了顧客所要求的質(zhì)量標(biāo)準(zhǔn)的一個(gè)方法,4,7 Diamond Process 流程,Responsibility 責(zé)任,QET PST (Lead) 5b,SMT RGM (Lead) 6,Statistical Engineering (Red X Strategies) 統(tǒng)計(jì)工程(紅-X方法) 7,Will Process Change Resolve? 工藝更改能解決問題嗎,Product Change Required? 產(chǎn)品更改需要嗎?,Hardy Perennial or Extremely Complex Problem 非常復(fù)雜的問題
4、,SQA - Supplier Quality Assurance QET - Quality Engineering Team PST - Plant Support Team SMT- Systems Management Team RGM - Reliability Growth Management,5,Review of Responsibility職責(zé)回顧,Diamonds 1-4Production The customer enthusiasm limit is 18 lbs.this is enough to keep the door panel in position a
5、t low cost.一旦確定Red X 為門外板裝飾件,我們決定改變策略, 從車型到車型變到卡車到卡車,因?yàn)殚T外板裝飾件對Cadillac車型來說是唯一的。換句話說,同樣的門板裝在805/830 車型上卻產(chǎn)生了差異,原因是一些門板從門上拽出需要20磅的力,二另一些只需要小于10磅的力; 顧客的要求是18磅,這已經(jīng)足夠保證門板以較低的成本固定到相應(yīng)的位置。,BOB,WOW,BIG CONTACT AREA,SMALL CONTACT AREA,大間隙BIGGAP,小間隙SMALLGAP,門邊緣DOOR FLANGE,門邊緣 DOOR FLANGE,The main characteristic
6、 that cause difference between the door panels 805/830 model is the poor contact of the flange on the door due that there are panels that present some deformation on the top edge and cause the poor contact.引起805/830 車型門外板差異的主要特征飾門邊緣連接不良,導(dǎo)致門板上邊緣變形,BOB vs WOW door panel最好、最壞門外板對比,DOOR FLANGE CURRENT U
7、SED,DOOR FLANGE PROPOSED,This picture shows that if we change the door flange 1.5 mm lenght we guarantee that all door panels require almost 18 lbs to pull out it position because the contact area will be bigger against door flange current,DOOR FLANGE CURRENT USED,DOOR FLANGE PROPOSED,這張圖片表明如果我們把門邊緣
8、加長1.5mm,我們確保開門力會增大18磅,原因是接觸面積比當(dāng)前增大了。,當(dāng)前使用的門邊緣,推存使用的門邊緣,B = Vehicles with new flange longer than 8.5 mm. C = Vehicles with current flange smaller than 7.9 mm. Req: confidence = 95%,Passed B vs C with 95% of confidence that the new flange length 1.5 mm is the Red X with complete separation and end cou
9、nt of 6.,B vs C Six pack,B=門邊緣比當(dāng)前長8.5mm的汽車 C=門邊緣比當(dāng)前小7.9mm的汽車 可信度為95%,檢測數(shù)據(jù)通過了B vs C ,95%可以相信加長1.5mm的門邊緣是完全獨(dú)立的紅X,并且累計(jì)數(shù)是6。,CUSTOMER SATISFACTION LIMIT,CURRENT PROCESS,BREAK POINT,Effort (lbs),Green Y Run Chart,RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL
10、RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL,WEEK 40 WEEK 41 WEEK 42 WEEK 43 WEEK 44 WEEK 45 WEEK 46 WEEK 47,DATE,綠Y運(yùn)行表,當(dāng)前進(jìn)程,斷點(diǎn),14,Product Engineering產(chǎn)品工程,SQA - Supplier Quality Assurance QET - Quality Engineering Team PST - Plant Support Team SMT- Systems Management Team RGM - Reliability Growth Management,Line Balance Mandatory Sequence,Stage 3,Engineering Change,Responsibility,QET PST (Lead) 5b,SMT RGM (Lead) 6,Statistical Engineering (Red X Strategies) 7,Will Process Change Resolve?,Product Change Required?,Hardy Per
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年汨羅市文學(xué)藝術(shù)服務(wù)中心公開選調(diào)工作人員備考題庫及答案詳解一套
- 2026年宣威市板橋街道公開招聘村級衛(wèi)生室鄉(xiāng)村醫(yī)生備考題庫及答案詳解參考
- 2026年中鐵七局集團(tuán)第二工程有限公司招聘備考題庫及1套完整答案詳解
- 2026年北京一零一中溫泉校區(qū)招聘備考題庫有答案詳解
- 2026年吐魯番市消防救援支隊(duì)面向社會公開招聘政府專職消防員16人備考題庫及完整答案詳解1套
- 完善資產(chǎn)內(nèi)控制度
- 檔案室內(nèi)控制度
- 五項(xiàng)費(fèi)用內(nèi)控制度
- 內(nèi)控制度如何匯編
- 免房租內(nèi)控制度
- 售后服務(wù)流程管理手冊
- 2020-2021學(xué)年新概念英語第二冊-Lesson14-同步習(xí)題(含答案)
- 混凝土構(gòu)件的配筋計(jì)算
- 國家開放大學(xué)《政治學(xué)原理》章節(jié)自檢自測題參考答案
- GB/T 5758-2023離子交換樹脂粒度、有效粒徑和均一系數(shù)的測定方法
- 防雷裝置維護(hù)保養(yǎng)制度
- 中醫(yī)治療“膏淋”醫(yī)案67例
- 黃金冶煉行業(yè)三廢處理綜述
- 統(tǒng)編版高中語文選擇性必修上冊 在民族復(fù)興的歷史豐碑上-2020中國抗疫記 教學(xué)課件
- GB/T 2792-2014膠粘帶剝離強(qiáng)度的試驗(yàn)方法
- 小波分析及其應(yīng)用教材課件
評論
0/150
提交評論