版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
ICS27.180
P61
RecordNumber:J2649-2019NB
ENERGYSECTORSTANDARD
OFTHEPEOPLE’SREPUBLICOFCHINA
中華人民共和國能源行業(yè)標(biāo)準(zhǔn)
PNB/T10107-2018
SpecificationforGeotechnicalTestsofOffshore
WindPowerProjects
海上風(fēng)電場(chǎng)工程巖土試驗(yàn)規(guī)程
(征求意見稿)
IssuedateDecember25,2018ImplementationdateMay1,2019
IssuedbyNationalEnergyAdministrationofthePeople’sRepublicofChina
ENERGYSECTORSTANDARDOFTHEPEOPLE’SREPUBLICOFCHINA
SpecificationforGeotechnicalTestsofOffshoreWindPowerProjects
NB/T10107-2018
*
PublishedbyChinaWater&PowerPress
(SuiteD,1SouthYuyuantanRoad,HaidianDistrict,Beijing100038,P.R.China)
http:
E-mail:sales@
Tel:(010)68367658(MarketingCenter)
BeijingKeshuiBookSalesCenter(Retail)
Tel:(010)88383994,63202643,68545874
DistributedbyXinhuaBookstoresandrelevantpublicationssalesoutletsinChina
*
140mm×203mmFormat1/32
FirstEditioninMay2019FirstPrintinginMay2019
NumberofPrintings0001-00000
*
BookNo.:155170·
Price:RMB
Ifthereisanymissingpage,reversepageoroffpageinthespecificationfromourpress,you
cancontactourmarketingcenterforexchange.
AllRightsReserved
Introduction
ThisEnglishversionisoneofChina’senergysectorstandardseriesinEnglish.Itstranslation
wasorganizedbyChinaRenewableEnergyEngineeringInstituteauthorizedbyNational
EnergyAdministrationofthePeople’sRepublicofChinaincompliancewithrelevant
proceduresandstipulations.ThisEnglishversionwasissuedbyNationalEnergy
AdministrationofthePeople’sRepublicofChinainAnnouncement[2018]No.16datedDec
25,2018.
ThisversionwastranslatedfromtheChinesestandardNB/T10107-2018,Specificationfor
GeotechnicalTestsofOffshoreWindPowerProjects,publishedbyChinaWater&Power
Press.ThecopyrightisreservedbyNationalEnergyAdministrationofthePeople’sRepublic
ofChina.Intheeventofanydiscrepancyintheimplementation,theChineseversionshall
prevail.
Manythanksgotothestafffromtherelevantstandarddevelopmentorganizationsandthose
whohaveprovidedgenerousassistanceinthetranslationandreviewprocess.
ForfurtherimprovementoftheEnglishversion,allcommentsandsuggestionsarewelcome
andshouldbeaddressedto:
ChinaRenewableEnergyEngineeringInstitute
No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China
Website:
Translatingorganization:
Translatingstaff:
Reviewpanelmembers:
翻譯出版說明
本譯本為國家能源局委托水電水利規(guī)劃設(shè)計(jì)總院按照有關(guān)程序和規(guī)定,統(tǒng)一組織翻
譯的能源行業(yè)標(biāo)準(zhǔn)英文版系列譯本之一。2018年12月25日,國家能源局以2018年第
16號(hào)公告予以公布。
本譯本是根據(jù)中國水利水電出版社出版的《海上風(fēng)電場(chǎng)工程巖土試驗(yàn)規(guī)程》NB/T
10107-2018翻譯的,著作權(quán)歸國家能源局所有。在使用過程中,如出現(xiàn)異議,以中文版
為準(zhǔn)。
本譯本再翻譯和審核過程中,本標(biāo)準(zhǔn)編制單位及編制組有關(guān)成員給予了積極協(xié)助。
為不斷提高本譯本的質(zhì)量,歡迎使用者提出意見和建議,并反饋給水電水利規(guī)劃設(shè)
計(jì)總院。
地址:北京市西城區(qū)六鋪炕北小街2號(hào)
郵編:100120
網(wǎng)址:
本譯本翻譯單位:
本譯本翻譯人員:
本譯本審核人員:
AnnouncementofNationalEnergyAdministrationof
thePeople’sRepublicofChina
[2018]No.16
AccordingtotherequirementsofDocumentGNJKJ[2009]No.52NoticeonReleasing
theEnergySectorStandardizationAdministrationRegulations(tentative)anddetailed
implementationrulesissuedbyNationalEnergyAdministrationofthePeople'sRepublicof
China,204sectorstandardssuchasCodeforEngineeringGeologicalInvestigationof
PhotovoltaicPowerProjects,including32energysector(NB)standardsand172electric
powersector(DL)standards,areissuedbyNationalEnergyAdministrationofthePeople's
RepublicofChinaafterduereviewandapproval.
Attachment:DirectoryofSectorStandards
NationalEnergyAdministrationofthePeople'sRepublicofChina
December25,2018
Attachment:
DirectoryofSectorStandards
SerialReplacedStandardApprovalImplementa
StandardNo.Title
numberstandardNo.No.date
tiondate
...
Specificationfor
GeotechnicalTestsofDecember
8NB/T10107-2018May1,2019
OffshoreWindPower25,2018
Projects
...
Foreword
AccordingtotherequirementsofDocumentGNKJ[2015]No.12“NoticeonReleasing
theSecondBatchofIndustrialStandardFormulation(Revision)PlaninEnergySectorin
2014”issuedbyNationalEnergyAdministrationofthePeople'sRepublicofChina,this
Specificationispreparedbytheprocedurepreparationteamafterextensiveinvestigationand
researchthroughcarefullysummarizingpracticalexperiencesandreferringtorelevant
internationalandforeignadvancedstandardsonthebasisofextensiveconsultation.
ThemajortechnicalcontentsofthisSpecificationare:PreparationandSaturationof
Specimen,PhysicalPropertyTestsofSoil,MechanicalPropertyTestsofSoil,In-situTests,
WaterQualityAnalysis,SoilQualityAnalysis,ClayMineralsAnalysis,SubmarineShallow
GasandGassySoilTests,andPhysicalandMechanicalPropertyTestsofRock.
UnderthemanagementoftheNationalEnergyAdministrationofthePeople'sRepublic
ofChina,thisSpecificationisproposedanddailymanagedbytheChinaRenewableEnergy
EngineeringInstitute,andexplainedbytheWindPowerPlantPlanningandDesignTechnical
Sub-committeeoftheWindPowerStandardizationTechnicalCommitteeintheEnergySector.
Incaseofanycommentsorsuggestionsintheimplementationprocess,pleasesendto:
ChinaRenewableEnergyEngineeringInstitute
No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China
Chiefdevelopmentorganization:
POWERCHINAHuadongEngineeringCorporationLimited
Participatingdevelopmentorganizations:
ZhejiangHuadongConstructionEngineeringCo.,Ltd.
ZhejiangHuadongEngineeringSafetyTechnologyCo.,Ltd.
HohaiUniversity
ChangjiangRiverScientificResearchInstituteofChangjiangWater
ResourcesCommission
WuHanUniversity
NanjingUniversity
WuhanInstituteofRockandSoilMechanics,theChineseAcademyof
Sciences
Chiefdraftingstaff:
WangMingyuanShanZhigangRaoXibaoHuangBin
XuGaofengShenYangWangkuanjunLiXinyi
HuShenggangZuoYongzhenYangTaoWangYong
WangZhenhongZhouYuefengZhouLipeiZhuXiaoCai
ChengWuweiXuXueyongWangYanliDiShengjie
DuWenboBuLingfangXuHanZhangKun
ChenYunXiongXiaoSunMiaoJunXunCaiyun
Reviewerpanelmembers:
WangHuimingLiWengangZhongJianpingLiXiaoquan
AoDahuaYangShouhuaFengBeileiLaiXianghua
HuangBincaiLuXinjingLiuYanhuaWangDong
WangYajunLiMoQinWeifengPuLing
LiShisheng
1GeneralProvisions
1.0.1Thisspecificationisformulatedtostandardizetheworkingcontentsandtechnical
requirementsforgeotechnicaltestsofoffshorewindpowerprojects,andensurethequalityof
testsandresults.
1.0.2Thisspecificationisapplicabletothegeotechnicaltestsofoffshorewindpowerprojects.
1.0.3Inadditiontothisspecification,thegeotechnicaltestsofoffshorewindpowerprojects
shallalsomeettherequirementsofcurrentrelevantnationalstandards.
1
2TermsandSymbols
2.1Terms
2.1.1thermalconductivity
theheatpassingthroughunitareasoilinunittimeunderunittemperaturegradient.
2.1.2ringsheartest
alarge-displacementsheartestfortorsionalshearofaringspecimen,keepingboththeshear
areaandthenormalstressconstant.
2.1.3soil-steelpileinterfacebehaviourtest
atesttodeterminetherelationshipbetweentheshearstressandsheardisplacementonthe
interfaceaswellasthestrengthcurveontheinterfacebyapplyingacertainnormalstresson
theinterfacebetweensoilandsteelpipepiletoenabletheinterfacetogenerateshear
displacementalongthetangentialdirection.
2.1.4triaxialcreeptest
atypeoftriaxialcompressiontesttomeasurethetime-dependentaxialstrainandvolume
strainofspecimenbyapplyingaxialpressureingradesorseparatelyunderacertainconfining
pressuretokeepaconstantload.
2.1.5truetriaxialtest
atypeoftriaxialcompressiontestsubjecttothreeindependentprincipalstresses.
2.1.6hollowcylinderdynamictorsionalsheartest
atesttodeterminethedynamicstress-strainrelationship,dynamicstrength,dynamicshear
modulus,dynamicelasticmodulusanddampingratiobysynchronouslyapplyingaxialforce
andtorquevariedonaregularbasisonahollowcylinderunderacertainlateralpressure.
2.1.7miniaturevanesheartest
atesttodeterminetheundrainedshearstrengthofsaturatedsoftclaybypressingtheminiature
vanewithacertainsizeverticallyintothesoilandshearingitatacertaintorsionrate.
2.1.8T-barpenetrationtest
atypeoffull-flowstaticpenetrationtestinwhichaT-barprobeispenetratedintothesoilata
specifiedrateandtheresistanceoftheprobeismeasuredsimultaneouslyinthepenetration
process.
2.1.9ballpenetrationtest
atypeoffull-flowstaticpenetrationtestinwhichaballprobeispenetratedintothesoilata
specifiedrateandtheresistanceoftheprobeismeasuredsimultaneouslyinthe
2
penetrationprocess.
2.1.10gassysoil
atypeofsubmarinedepositcontainingclosedgasatapressurehigherthanatmospheric
pressure.
2.1.11submarineshallowgas
thegasmainlyconsistingofmethane,carbondioxide,hydrogensulfideandethanedepositedin
thesubmarineshallowsediments.
2.2Symbols
2.2.1Sizeandtime
N——numberofvibrations;
V——specimenvolume;
ω——circularfrequency.
2.2.2Physicalindicators
Cu——non-uniformitycoefficient;
Dr——relativedensity;
e——voidratio;
Gs——specificgravityofsoilgrain;
IL——liquidityindex;
IP——plasticityindex;
m——specimenmass;
Sr——saturationdegree;
w——watercontent;
wL——liquidlimit;
wP——plasticlimit;
ρd——drydensityofsoil.
3
2.2.3Mechanicalindicators
av——compressioncoefficient;
Bq——coefficientofporepressureinpiezoconepenetrationtest;
Cs——swellingindex;
Cv——consolidationcoefficient;
Cα——secondaryconsolidationcoefficient;
Ee——swellingmodulus;
Es——compressionmodulus;
E0——deformationmodulus;
Ese——undrainedsecantmodulus;
fs——sidefrictionofconepenetrationtest;
Gd——dynamicshearmodulus;
K0——coefficientofstaticlateralpressure;
mv——volumecompressioncoefficient;
pc——pre-consolidationpressure;
ps——specificpenetrationresistance;
qc——coneresistance;
qu——unconfinedcompressivestrength;
St——sensitivity;
u——porewaterpressure;
Vp——velocityofcompressionwave;
Vs——velocityofshearwave;
ε50——axialstraincorrespondingto50%peakprincipalstressdifferenceinthe
4
unconsolidatedandundrainedsheartest.
5
3BasicRequirements
3.0.1Thegeotechnicaltestsofoffshorewindpowerprojectsshallbedeterminedaccordingto
thesitegeologicalconditionsanddesignrequirements.
3.0.2Therocksandsoilofoffshorewindpowerprojectsshallbeclassifiedinaccordance
withtherelevantprovisionsofthecurrentnationalstandardGB50021,CodeforInvestigation
ofGeotechnicalEngineering.
3.0.3Thetestmethodsforphysicalandmechanicalpropertiesofrockandsoilinoffshore
windpowerprojectsshouldbeselectedaccordingtoAppendixAofthisSpecification,and
therequirementsandmanagementofspecimensshallcomplywiththerequirementsof
AppendixBofthisSpecification.Thespecimenmassgradingrequirementsforlaboratory
testsandthesamplingmethodsofspecimensfordifferentlevelsshallcomplywiththe
relevantprovisionsofthecurrentnationalstandardGB50021,CodeforInvestigationof
GeotechnicalEngineering.
3.0.4Dataprocessingandstatisticalanalysisofgeotechnicaltestsshallcomplywiththe
relevantprovisionsofthecurrentnationalstandardGB50021,CodeforInvestigationof
GeotechnicalEngineering.
3.0.5Theinstrumentsandequipmentusedinthegeotechnicaltestsshallcomplywiththe
relevantprovisionsofthecurrentnationalstandardGB/T15406,PrimaryParameterand
GeneralSpecificationforGeotechnicalEngineeringInstrument”,andshallbetestedor
calibratedandverified.
3.0.6Thesensoroftheinstrumentandequipmentshallbecalibratedregularlyorbeforethe
test.Incaseofanyabnormalityinuse,itshallberecalibrated.Thesensors,wiresand
measuringinstrumentsusedinthecalibrationshallbethesameasthoseusedinthetest.
3.0.7Nationalcertifiedreferencematerialsshallbeusedforchemicalanalysisfortraceability.
3.0.8Thediscardedspecimensofgeotechnicaltestshallbeplacedinsuchpositionas
specifiedbythecompetentenvironmentaladministrativedepartment,whichshallnotbe
dumpedorstackedcasually.
3.0.9Specialmeasuresshallbetakentoensurethesafetyofequipmentandpersonnel
accordingtothesiteconditionspriortothein-situtests.
3.0.10Exceptforspecialrequirements,thewaterusedintestshallbepurewater.
6
4PreparationandSaturationofSpecimen
4.1GeneralRequirements
4.1.1Thegrainsizeofthepreparedspecimenshouldnotbegreaterthan20mm,andthe
specimenwithagrainsizeofgreaterthan20mmshallbeinaccordancewiththerelevant
provisionsofthecurrentnationalstandardGB50123,StandardforSoilTestMethod.
4.1.2Oneortwomorespecimensshouldbepreparedforstandby.Themaximumallowable
densitydifferenceofthesamegroupofundisturbedspecimensshouldnotbegreaterthan
0.03g/cm3,andthemaximumallowabledifferenceofwatercontentshouldnotbegreaterthan
2%.Theallowabledifferencebetweenthedensityofdisturbedspecimensofthesamegroup
andthatrequiredasperthepreparationstandardshouldnotbegreaterthan0.02g/cm3,andthe
allowabledifferencebetweenthewatercontentandthatrequiredasperpreparationstandard
shouldnotbegreaterthan1%.
4.2SpecimenPreparation
4.2.1ThepreparationforconsolidationTest,directsheartestandpermeabilityTestof
undisturbedsoilspecimenshallsatisfythefollowingrequirements:
1Thesoilspecimenshallbeplacedinthecorrectdirectionasindicatedonthesoil
specimencylinder,andthestructureofthesoilspecimenshallbecheckedoncethecylinderis
opened.Incasethesoilspecimenisseriouslydisturbedorthequalityofthesoilspecimenfails
tosatisfytherequirements,noundisturbedsoilspecimenshallbeprepared.Theupperand
lowerlayersofthesoilspecimenshallbeidentifiedfurther,andbothendsofthesoilspecimen
shallbeleveled.
2Athinlayerofvaselineshallbecoatedontheinnerwallofthecuttingringforthetest
beforetheplacementofthecuttingedgeonthesoilspecimendownward.Cutthesoil
specimenintoasoilcolumnwiththediameterslightlylargerthanthatofthecuttingring,and
thenpressdownthecuttingringverticallyuntilthesoilspecimenextendsoutofthecutting
ring.Thespecimenandthecuttingringshallbeconnectedclosely.Removetheremainingsoil
atbothendsandlevelit.Cleantheouterwallofthecuttingring,andweighthetotalmassof
thecuttingringandthesoilwithanaccuracyof0.1g.
3Observethesoilspecimencarefullyinthecuttingprocess.Describethelayer,smell
andcolorofthespecimen.Inaddition,recordanyimpurity,uniformityandcrackofthe
specimen.
4Theremainingundisturbedsoilspecimenshouldbewrappedinwaxpaperandputin
7
thehumidcontainerforsupplementarytestuse;theremainingrepresentativecutsoilmaybe
usedforthephysicaltest.
5Determinewhetherthespecimenissaturateddependingonitsnatureandtest
requirements.Whenthespecimenisnottestedimmediatelyorsaturated,itshallbestoredin
thehumidcontainertemporarily.
4.2.2Thespecimenpreparationofundisturbedsoilforunconfinedcompressivestrengthtest,
triaxialcompressiontest,triaxialcreeptest,dynamictriaxialtestandresonantcolumn
testshallmeetthefollowingrequirements:
1Theratioofheighttodiameterofthesoilspecimenshallbe2.0to2.5.Whenthe
diameterofthespecimenislessthanorequalto100mm,themaximumallowablegrainsizeis
1/10ofthespecimendiameter.Whenthediameterisgreaterthan100mm,themaximum
allowablegrainsizeis1/5ofthediameter.
2Thesoilspecimenshallbeplacedinthecorrectdirectionasindicatedonthe
specimencylinder,andthestructureofthesoilspecimenshallbecheckedonceopened.In
casethesoilspecimenisseriouslydisturbedorthequalityofthesoilspecimenfailstosatisfy
therequirements,noundisturbedsoilspecimenshallbeprepared.
3Forasoftsoilspecimen,cutandobtainasoilcolumnslightlylargerthanthespecified
sizewithawiresaworasoilcutter,andplaceitbetweentheupperandlowerpartsofthe
cuttingplate.Thencutthecolumnfromtoptobottombythewiresaworsoilcutterclosetothe
sideplateandrotatetheplatewhilecuttinguntilspecimendiameterreachesthespecified
value.Leveltheupperandlowerendsbythespecimenheight.
4Forahardsoilspecimen,cutandobtainasoilcolumnslightlylargerthanthespecified
sizewithasoilcutterorwiresaw,andleveltheupperandlowerends.Placethespecimenon
thecutterframebythelayerdirectionrequiredbyspecimen,andcutwithasoilcutter.Firstly,
applyathinlayerofoilontheinnerwallofthecutterblade,andalignthecutterbladewith
thetopsurfaceofthespecimen.Cutthespecimenwhilepressingthecutteruntilitisabout
2cmhigherthantherequiredspecimen.Thendisassemblethecutter,takeoutthespecimen,
andlevelthetwoendstoarequiredheight.
5Thetwofacesofthespecimenshallbeflat,evenandinparallel,andthesidesshallbe
perpendiculartothefaces.Intheprocessofsamplecutting,holesformedbygravelonthe
surfaceofspecimenmaybefilledwithresidualsoil.
6Weighthecutspecimen.Theweightofthespecimenwithadiametergreaterthan
100mmshallbeaccurateto1.0g,whilethatwithadiameterlessthanorequalto100mmshall
beaccurateto0.1g.Taketheresidualsoilandtestthewatercontentatthesametime.Thetest
8
forthewatercontentshallnotbelessthantwogroups,andthedifferenceofthewater
contentshallmeettherequirementsofArticle4.1.2ofthisSpecification.
4.2.3Thepreparationforthedisturbedfine-grainedsoilspecimenshallmeetthefollowing
requirements:
1Describethecolor,soiltype,smellandinclusionsofthedisturbedsoilspecimen.The
disturbedsoilmaybefullymixed,andtaketherepresentativespecimentomeasurethewater
content.
2Putthedisturbedblockspecimenonarubberplateforcrushingwithawoodrolleror
soilcrusher,andthegrainshallnotbecrushed.Whenthewatercontentishigh,itcanbe
air-drieduntilitiseasytobecrushed.
3Sievethecrushedspecimen.Whenthediameterofspecimenislessthanorequalto
100mm,themaximumallowablegrainsizeis1/10ofthediameter.Whenthediameterof
specimenisgreaterthan100mm,themaximumallowablegrainsizeis1/5ofthediameter.
4Usequarterdiagonalsamplingmethodorsandseparatortotakeenoughrepresentative
specimensuponsieving,andputsuchspecimensintotheglasscylinder.Suchspecimenshall
belabeled.Forair-driedsoil,thewatercontentshallbetested.
5Calculatetheamountofair-driedsoilandwaterrequiredforspecimenpreparation
accordingtothedrydensityandwatercontentasrequiredbymoldvolume.Spraythewater
tobeaddedonthesoilandmixthemwell.Putthemixtureintoaplasticbagafterawhile,and
thenputsuchinaclosedcontainerforatleast20hourstomakethewatercontenteven.Take
outthesoilandretestthewatercontent,whichshouldmeettherequirementsofArticle4.1.2
ofthisSpecification.
6Pourthewetsoilintothemoldandfixitinthecompactoronthebottomplate.Forthe
specimensoftriaxialcompressiontest,dynamictriaxialtestandresonantcolumntest,they
shouldbecompactedinlayersbyspecimenheight.Dividethesiltinto3-5layers,andthe
cohesivesoilisdividedinto5-8layers.Fortheconsolidationtest,directsheartestand
permeabilitytest,thespecimenshouldnotbecompactedinlayers.Levelthetwoendsofthe
specimeninsamplecylinderandtakeitouttoweighitsmass.
Note:AccordingtothecurrentnationalstandardGB/T50145,StandardforEngineering
ClassificationofSoil,fine-grainedsoilreferstosuchwithagrainsizeoflessthan0.075mmaccountingfor
nolessthan50%.
4.2.4Specimenpreparationofdisturbedsandshallmeetthefollowingrequirements:
1Specimenpreparationoftriaxialcompressiontest,dynamictriaxialtest,andresonant
columntestshallbecarriedoutinstepsasfollows:
9
1)Sievethesoilspecimen.Whenthediameterofspecimenislessthanorequalto
100mm,themaximumallowablegrainsizeis1/10ofthediameter.Whenthe
diameterofspecimenisgreaterthan100mm,themaximumallowablegrainsizeis
1/5ofthediameter.
2)Weighandtaketherequiredamountofair-driedsandspecimenaccordingtothedry
densityandspecimenvolumeasrequiredbythetest,anddividesuchspecimeninto
threeequalparts.Boiltheminwater,andthencoolsuchforstandby.
3)Opentheporewaterpressurevalveandmeteringvalvetomakethebaseofpressure
chamberfilledwithwater.Slidetheboiledpermeableplateontothebaseof
pressurechamberandwrapitwithrubberbandtopreventsandfromleakinginto
thebase.Closetheporewaterpressurevalveandmeteringvalve,andputoneend
oftherubbermembraneonthebaseofthepressurechamberandtieittightly.Put
thesplitmoldonthebase,andturntheupperendoftherubbermembraneout.
Then,extracttheairtomaketherubbermembraneclosetotheinnerwallofsplit
mold.
4)Injectairlesswaterintotherubbermembranetoabout1/3ofthespecimenheight.
Putapieceofboiledandcooledsandspecimenintothemembranewitha
long-handledspoon,andfillittotherequiredheight.Forthespecimenwith
fine-grainedsoilandahighdrydensity,drysandmaybeusedforpreparation,and
waterheadsaturationorbackpressuresaturationmaybeadopted.
5)Uponthecompletionoffillingthefirstlayerofsandspecimen,continuetoinject
waterto2/3ofthespecimenheight,andthenfillthesecondlayerofsandspecimen.
Continuethefillingofspecimenuntilthemoldisfull.Whenthedrydensityis
requiredtobelarge,thesplitmoldmaybetappedgentlyinthefillingprocessto
maketheweighedsandspecimentobefilledatthespecifiedvolume.Theninstall
thepermeableplateandspecimencap,turnovertherubbermembrane,andtieiton
thespecimencap.
6)Openthemeteringvalvetolowerthemeteringpipesothatthewatersurfaceinthe
pipeisabout0.2mbelowtheelevationofthecenterofthespecimen.Whenthe
specimendiameteris101mm,itshallbeabout0.5mbelowtheelevationofthe
center.Acertainnegativepressureisgeneratedinthespecimentomakethe
specimenstandup.Removethesplitmoldtomeasuretheheightanddiameterof
specimen,andrecheckthedrydensity.
2Specimenpreparationforconsolidationtestanddirectsheartestshallbecarriedoutin
10
stepsasfollows:
1)Take1,200grepresentativeair-driedsandspecimenssievedby2mmsievefor
standby.Weightherequiredamountofair-driedsandforeachspecimenaccording
totherequireddrydensityinanaccuracyof0.1g.
2)Duringthedirectsheartest,aligntheupperandlowerboxes,andinsertthefixing
pin.Putthecleanpermeableorimpermeableplateintotheshearbox.
3)Pourthepreparedsandspecimenintothecuttingringofshearboxorconsolidation
container,andflattenthesurface.Putthehardwoodblockonthesurface,andgently
tapitwithhandstomakethespecimenreachtherequireddrydensity.
4.2.5Specimenpreparationforringsheartestshallmeetthefollowingrequirements:
1Soakthedisturbedsoilspecimensinpurewaterfor24h,distributethemuniformlyto
soilpasteinliquidlimitstate,andthenfillthemintothelimitring.
2Inthefillingprocess,fillaroundthelimitringfirstandthenthemiddlepart.Thegasin
thespecimenshallbeeliminated.
3Scrapethespecimentoptobeflushwiththeuppersurfaceofthespecimenbox.
4.2.6Specimenpreparationfortruetriaxialtestshallmeetthefollowingrequirements:
1Thespecimenshouldbeincuboidorcube,ofwhichthesixfaces(up,down,left,right,
frontandback)shallbeflat,andtheoppositefacesshallbeparalleltoeachotherandvertical
tothefaces.Theratioofspec
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 保安部軍體培訓(xùn)制度
- 幼兒園外出培訓(xùn)核銷制度
- 重慶兒童平衡車培訓(xùn)制度
- 國企培訓(xùn)日常管理制度
- 小學(xué)全員培訓(xùn)工作制度
- 局治安防范培訓(xùn)制度
- 旅游社員工進(jìn)修培訓(xùn)制度
- 環(huán)衛(wèi)工保潔培訓(xùn)制度
- 供應(yīng)室護(hù)士培訓(xùn)制度
- 培訓(xùn)學(xué)校現(xiàn)場(chǎng)管理制度
- 交通安全企業(yè)培訓(xùn)課件
- 2025年廣東省中考物理試卷及答案
- 皮革項(xiàng)目商業(yè)計(jì)劃書
- 主管護(hù)師護(hù)理學(xué)考試歷年真題試卷及答案
- 華文慕課《刑法學(xué)》總論課后作業(yè)答案
- 公路護(hù)欄波型梁施工方案
- 2025版煤礦安全規(guī)程新增變化條款考試題庫
- 基于SOLO分類理論剖析初中生數(shù)學(xué)開放題解決水平:現(xiàn)狀差異與提升策略
- 2025至2030全球及中國用戶研究軟件行業(yè)產(chǎn)業(yè)運(yùn)行態(tài)勢(shì)及投資規(guī)劃深度研究報(bào)告
- 砌筑施工安全教育培訓(xùn)課件
- GB/T 7122-2025高強(qiáng)度膠粘劑剝離強(qiáng)度的測(cè)定浮輥法
評(píng)論
0/150
提交評(píng)論