金融大廈深基坑支護(hù)及土方開(kāi)挖安全施工專(zhuān)項(xiàng)方案2_第1頁(yè)
金融大廈深基坑支護(hù)及土方開(kāi)挖安全施工專(zhuān)項(xiàng)方案2_第2頁(yè)
金融大廈深基坑支護(hù)及土方開(kāi)挖安全施工專(zhuān)項(xiàng)方案2_第3頁(yè)
金融大廈深基坑支護(hù)及土方開(kāi)挖安全施工專(zhuān)項(xiàng)方案2_第4頁(yè)
金融大廈深基坑支護(hù)及土方開(kāi)挖安全施工專(zhuān)項(xiàng)方案2_第5頁(yè)
已閱讀5頁(yè),還剩76頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

金融大廈深基坑支護(hù)及土方開(kāi)挖

安全專(zhuān)項(xiàng)施工方案

目錄

1編制依據(jù)..................................................................................1

2工程概況..................................................................................3

2.1項(xiàng)目簡(jiǎn)介...............................................................................3

2.2基坑支護(hù)工程概況........................................................................3

2.3支護(hù)結(jié)構(gòu)設(shè)計(jì)概況........................................................................5

2.4基坑周邊建筑及地下管線(xiàn)情況.............................................................8

1、周邊建筑情況........................................................................8

2、地下管線(xiàn)情況情況....................................................................9

2.5場(chǎng)地工程地質(zhì)條件.......................................................................11

2.4.1巖土層分布特征...................................................................11

2.4.2不良地質(zhì)作用及地下水............................................................12

2.6施工準(zhǔn)備..............................................................................12

2.6.1技術(shù)準(zhǔn)備.........................................................................12

2.6.2人員準(zhǔn)備........................................................................13

2.6.3施工機(jī)械、主要材料準(zhǔn)備..........................................................14

1、大型設(shè)備的選擇.....................................................................14

2、土方開(kāi)挖機(jī)械選擇...................................................................14

3、大型機(jī)械設(shè)備表.....................................................................14

3施工部署及管理目標(biāo)........................................................................15

3.1施工分項(xiàng)..............................................................................15

3.2施工總體部署...........................................................................15

3.2.1施工平面布置概況.................................................................15

3.2.2施工順序安排....................................................................17

3.3基坑排水措施...........................................................................17

3.4施工管理與組織機(jī)構(gòu).....................................................................19

3.4.1施工組織機(jī)構(gòu).....................................................................19

3.4.2組織管理措施....................................................................19

3.4.3管理人員配備表..................................................................19

3.5管理目標(biāo)..............................................................................20

4施工方案.................................................................................20

4.1施工順序..............................................................................20

4.2各主要施工工序的施工方法...............................................................21

4.2.1施工準(zhǔn)備........................................................................21

422定位放線(xiàn).........................................................................23

I,施工放線(xiàn)內(nèi)容.......................................................................23

2、施工放線(xiàn)要點(diǎn).......................................................................23

3、施工測(cè)量放線(xiàn)規(guī)范要求...............................................................23

4、工程定位施工放線(xiàn)檢查、復(fù)核、驗(yàn)收:.................................................24

4.2.3支護(hù)樁的施工....................................................................24

424土方分層開(kāi)挖.....................................................................30

1,土方工程概況.......................................................................30

2、土方開(kāi)挖施工順序...................................................................30

3、土方開(kāi)挖與支護(hù)各工序之間的關(guān)系.....................................................30

2、土方開(kāi)挖安全技術(shù)措施...............................................................31

3、降水...............................................................................32

4、施工車(chē)輛上下基坑坡道...............................................................32

4.2.5石方破除........................................................................33

4.2.6噴錨支護(hù)及噴碎護(hù)面施工..........................................................34

4.2.7預(yù)應(yīng)力錨索施工..................................................................40

1、預(yù)應(yīng)力錨索設(shè)計(jì)概況.................................................................40

2、預(yù)應(yīng)力錨索施工部署.................................................................42

3、預(yù)應(yīng)力錨索施工工藝.................................................................42

4、預(yù)應(yīng)力錨索主要施工方法.............................................................42

5、預(yù)應(yīng)力錨索施工安全技術(shù)措施.........................................................44

6、預(yù)應(yīng)力錨索施工質(zhì)量控制措施.........................................................44

5施工進(jìn)度計(jì)劃.............................................................................45

6危險(xiǎn)源識(shí)別及監(jiān)控項(xiàng)目.....................................................................47

6.1重大危險(xiǎn)源的識(shí)別與監(jiān)控............................................................47

6.2引發(fā)事故的原因分析及預(yù)防措施......................................................48

6.3危險(xiǎn)源的監(jiān)控項(xiàng)目..................................................................48

6.4各類(lèi)危險(xiǎn)情況的應(yīng)急措施............................................................49

7應(yīng)急預(yù)案.................................................................................51

7.1應(yīng)急救援指揮部的組成、職責(zé)和分工..................................................51

7.2安全事故處理程序..................................................................52

7.3應(yīng)急通訊聯(lián)絡(luò)......................................................................54

7.4安全事故應(yīng)急處理措施..............................................................54

7.5主要安全事故應(yīng)急預(yù)案..............................................................55

8安全保證措施.............................................................................59

8.1安全生產(chǎn)管理目標(biāo)及組織體系........................................................59

8.2安全控制及安全交底................................................................62

8.3雨季施工..........................................................................70

8.4基坑監(jiān)測(cè)及保證措施................................................................71

8.5工程移交及基坑支護(hù)保護(hù)措施........................................................77

深基坑支護(hù)及土方開(kāi)挖安全專(zhuān)項(xiàng)施工方案

1編制依據(jù)

(一)XXXX地質(zhì)工程勘察院編制的《巖土工程勘察報(bào)告》(工程編號(hào):XX桂勘字

[2014]033號(hào))。

(二)由XX基礎(chǔ)勘察工程有限責(zé)任公司設(shè)計(jì)的《XX金融大廈基坑支護(hù)工程》施工

圖紙。

(三)建設(shè)部、標(biāo)準(zhǔn)化協(xié)會(huì)頒發(fā)的有關(guān)施工規(guī)范、工藝標(biāo)準(zhǔn)、質(zhì)量驗(yàn)收標(biāo)準(zhǔn):

1、《建筑深基坑工程施工安全技術(shù)規(guī)范》(JGJ311-2013);

2、《建筑樁基技術(shù)規(guī)范》(JGJ94-2008);

3、《建筑地基處理技術(shù)規(guī)范》(JGJ79-2012);

4、《巖土錨桿(索)技術(shù)規(guī)程》(ESC22:2005);

5、《土層錨桿設(shè)計(jì)與施工規(guī)范》(ESC22:90);

6、《建筑基坑支護(hù)技術(shù)規(guī)程》(JGJ120-2012);

7、《建筑邊坡工程技術(shù)規(guī)范》(GB50330-2013);

8、《建筑基坑工程監(jiān)測(cè)技術(shù)規(guī)范》(GB50497-2009);

9、《建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范》(GB50007-20U);

10、《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》(GB50010-2010);

11、《錨桿噴射混凝土支護(hù)技術(shù)規(guī)范》(GB50086-2001);

12、《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50204-2002)2011版;

13、《工程測(cè)量規(guī)范》(GB50026-2007);

14、《建筑變形測(cè)量規(guī)范》(JGJ/T8-2007);

15、《鋼筋焊接及驗(yàn)收規(guī)程》(JGJ18-2012);

16、《混凝土強(qiáng)度檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》(GB50107-2010);

17、《建筑施工安全檢查標(biāo)準(zhǔn)》(JGJ59-2011);

18、《施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范》(JGJ46-2005);

19、《建筑施工高處作業(yè)安全技術(shù)規(guī)范》(JGJ80-1991);

20、《XX市建筑安全防護(hù)施工規(guī)定》及相關(guān)法律法規(guī);

21、《危險(xiǎn)性較大的分部分項(xiàng)工程安全管理辦法》(建質(zhì)[2009]87號(hào)文);

22、《中華人民共和國(guó)建筑法》(主席令第四十六號(hào));

23、《中華人民共和國(guó)安全生產(chǎn)法》(中華人民共和國(guó)主席令第70號(hào));

24、《建設(shè)工程安全生產(chǎn)管理?xiàng)l例》(中華人民共和國(guó)務(wù)院令393號(hào));

25、《建筑機(jī)械使用安全技術(shù)規(guī)范》(JGJ3

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論