漿砌片石基礎(chǔ)1_第1頁
漿砌片石基礎(chǔ)1_第2頁
漿砌片石基礎(chǔ)1_第3頁
漿砌片石基礎(chǔ)1_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

云南安楚高速公路,,,,,,,,,,,,,,,,0.005,

公路工程泥結(jié)碎石路面現(xiàn)場質(zhì)量檢驗(yàn)表,,,,,,,,,,,,,,,,,0.010

承包單位:,,西南交通建設(shè)工程總公司,,,,,,起止樁號(hào):,,K38+000~K48+000,,表號(hào):檢驗(yàn)表(312-1),,,,0.005,

監(jiān)理單位:,,云南云路工程監(jiān)理咨詢公司,,,,,,合同段號(hào):,,02,,編號(hào):,,,,,

工程名稱,,泥結(jié)碎石路面,,,樁號(hào)及部位,,K0+000~+340(鄉(xiāng)村便道),,,施工時(shí)間,2005年3月10日,檢查時(shí)間,2005年3月15日,,,0.003,

項(xiàng)次,檢查項(xiàng)目,,,規(guī)定值或允許偏差,,檢查方法和頻率,,,檢查結(jié)果,,,,,合格率,,0.002,

1,密實(shí)度(kg/m3),,,2100,,按密度法每200m1處,,,,,,,,,,,0.002

2,平整度(mm),,,10,,"3m直尺,每100m2處×3尺,每尺1點(diǎn)",,,"2,5,7,2,5,3,1,0,5,4,5,6,3,2,5,1,1,5",,,,,100%,,,0.01

3,縱斷面高程(mm),,,±15,,水準(zhǔn)儀:每100m3點(diǎn),,,"-5,+10,-5,-3,-2,+2,+10,+12,+10,+2,+2",,,,,100%,,,0.012

4,厚度(mm),,,±30,,挖驗(yàn):每200m1點(diǎn),,,"+25,+10,+11,+15,+11",,,,,100%,,,

5,寬度(mm),,,不小于圖紙規(guī)定值,,尺量:每100m2處,,,"+15,+25,+26,+20,+25,+16,+54,+56",,,,,100%,,,0.01

6,"橫坡

(mm)",,,±0.5,,水準(zhǔn)儀:每100m2個(gè)斷面,,,"+0.1,+0.2,-0.2,-0.2,+0.1,0,0",,,,,100%,,,0.002

外觀鑒定:,,,,,,,,,外觀鑒定:,,,,,,,,0.002

,"表面平整,邊線整齊.",,,,,,,,,"表面平整,邊線整齊.",,,,,,,

"承包人自檢意見:

技術(shù)負(fù)責(zé)人:年月日",,,,,,,,,"監(jiān)理工程師檢驗(yàn)意見:

專業(yè)監(jiān)理工程師:

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論