GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范:英文_第1頁
GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范:英文_第2頁
GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范:英文_第3頁
GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范:英文_第4頁
GB 51151-2016 城市軌道交通公共安全防范系統(tǒng)工程技術(shù)規(guī)范:英文_第5頁
已閱讀5頁,還剩50頁未讀 繼續(xù)免費閱讀

付費閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLE'SREPUBLICOFCHINA

TECHNICALCODEFORENGINEERINGOF

PUBLICSECURITYANDPROTECTIONSYSTEMOF

URBANRAILTRANSIT

GB51151-2016

DevelopedbyTheMinistryofHousingandUrbanRuralDevelopment

-

ofthePeople'sRepublicofChina

ApprovedbyTheMinistryofHousingandUrbanRuralDevelopment

-

ofthePeople'sRepublicofChina

ImplementationDateDecember1,2017專用

人人文庫

ChinaPlanningPress

Beijing2024

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2017

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2024

byChinaPlanningPress

th

4Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,Xicheng專用District

Beijing,100038

www.jhpress.com

PrintedinChinabyBeijinghouchengzemingPrintingTechnologyCo.,Ltd

?2017bytheMinistry人人文庫ofHousingandUrban-RuralDevelopmentof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-1721-2

NOTICE

ThiscodeiswritteninChineseandEnglish.TheChinesetextshallbetakenastherulingonein

theeventofanyinconsistencybetweentheChinesetextandtheEnglishtext.

專用

人人文庫

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeople'sRepublicofChina

No.1092

AnnouncementoftheMinistryofHousingandUrbanRural

-

DevelopmentonPublishingtheNationalStandardof

TechnicalCodeforEngineeringofPublicSecurityand

ProtectionSystemofUrbanRailTransit

TechnicalCodeforEngineeringofPublicSecurityandProtectionSystemofUrbanRailTransit

hasbeenapprovedasanationalstandardwithaserialnumberofGB51151-2016,andwillbe

implementedonDecember1,2017.Articles4.2.1and4.2.3aremandatoryonesandmustbeimplemented

strictly.

ThiscodeispublishedanddistributedbyChinaPlanning專用Pressundertheorganizationofour

ResearchInstituteofStandardsandNorms.

MinistryofHousingandUrbanRuralDevelopmentofthePeople'sRepublicofChina

-

April15,2016

人人文庫

Foreword

AccordingtotherequirementsofDocumentJIANBIAO[2009]No.88issuedbytheMinistryof

HousingandUrbanRuralDevelopment(MOHURD)ofthePeople'sRepublicofChina—"Noticeon

-

PrintingandDistributing'theDevelopmentandRevisionPlanofNationalEngineeringConstruction

Standardsin2009'",thiscodedevelopmentgrouphascompiledthiscodeafterextensiveinvestigation

andresearch,deeplysummarizingthepracticalexperience,referringtorelevantinternationalstandards

andinnovativeforeignstandards,andafterextensivesolicitationofopinions.

Thiscodeconsistsof10chaptersand1appendix,covering:generalprovisions,terms,basic

requirements,designfortechnicalprotectionsystem,designforphysicalprotectionsystem,designfor

engineeringofsecurityandprotectionsystemofprotectedobject,otherdesignrequirements,project

constructionandsystemcommissioning,engineeringinspectionandacceptance,operational

managementevaluation,etc.

Theprovisionsprintedinboldtypearemandatoryonesandmustbeimplementedstrictly.

Thiscodeisunderthejurisdictionof,anditsmandatoryprovisionsareinterpretedbytheMinistry

ofHousingandUrbanRuralDevelopment.TheThirdResearchInstituteoftheMinistryofPublic

-

Securityisinchargeofexplanationoftechnicalspecifications專用.Pleasedirectanyarisencommentsor

suggestionsduringtheimplementationtotheThirdResearchInstituteoftheMinistryofPublicSecurity

forreferencewhenrevising(Address:76YueyangRoad,Shanghai.Postcode:200031).

ChiefDevelopmentOrganizations,CoDevelopmentOrganizations,ChiefDrafters,Chief

-

ReviewersandChiefTranslatorsofthiscode:

ChiefDevelopmentOrganizations:

TheThirdResearchInstituteoftheMinistryofPublicSecurity

ThePublicSecurity人人文庫AdministrationoftheMinistryofPublicSecurity

Co-DevelopmentOrganizations:

PublicSecurityCorpsofShanghaiMunicipalPublicSecurityBureau

UrbanRailandBusTransportCorpsofShanghaiMunicipalPublicSecurityBureau

ShanghaiAdvancedResearchInstituteofChineseAcademyofSciences

ChinaAcademyofUrbanPlanning&Design

GuangzhouMetroGroupCo.,Ltd.

ShanghaiShentongMetroResearch&ConsultancyCo.,Ltd.

ChengduRailTransitGroupCo.,Ltd.

PlanningandConstructionLeadingGroupofWuxiRailTransit

BusTransportBranchofShenzhenMunicipalPublicSecurityBureau

BusandRailTransportBranchofChengduMunicipalPublicSecurityBureau

HangzhouHikvisionDigitalTechnologyCo.,Ltd.

ChinaRailwayShanghaiDesignInstituteGroupCo.,Ltd.

ChinaRailwaySignalandCommunicationShanghaiEngineeringBureauGroupCo.,Ltd.

UrbanMassTransitMagazineofTongjiUniversity

1··

ShanghaiInternationalTechnologyandTradeUnitedCo.,Ltd.

ShanghaiZhongkeCityPublicSafetyStandardizationTechnologyCo.,Ltd.

ShanghaiDorconTechnologyCo.,Ltd.

H3CTechnologiesCo.,Ltd.

ShanghaiMissionInformationTechnologiesDevelopmentCo.,Ltd.

WuxiSensingNetIndustrializationResearchInstitute

ChiefDrafters:

ZHOUZuoyingFENGSonglinCHENGYunfeiDAIMinCHENYanshen

LIUAibinCAOShengweiZHAOYuanmingWANGQiaolinLIUGuangwu

RENHaiBIXiangliSHIChuanYUWeiPANZhifuFUYuanlei

LUShurongZHANGLidongHEWeiCHENSikaiHUZhiyiZHOUXiaoping

ZHAOQingMABokangZHURihuaLIUFanZHANGJieGUZhengyi

WANGZhilinPUQiLIUXiaoxinZHANGSuyanZHUYezhongCHENTao

QIANZhenyuXINGTaoLIUWeiYEYiminZHENGYanyan

LUOFengxiaPENGXinghuiHAOShanQIANWeiyongZHONGYankai

ZHANGQingrongFEIYousongSHAOXiaoCHENGWentao

ChiefReviewers:

SUNZhangZOUChuanjiLANTaoTONGXuerangSHIHaiouLIULi

XUYanhuaWUBoSUXiuyuYANZhongyinCAOGuohuiCHENGZhenxing

ChiefTranslators:專用

ZHOUZuoyingXUEXiaopingRENHaiMAJingxiaoCHANGQingqing

LIWeijiaoFUYuanleiGUZhengyiZHANGLidongXUSuminHUZhiyi

ZHOUMingCHENGYunfeiLIAngLIUFanJIWenliTAOJunjie

LIUXiaoxinLIQinweiZHENGLuanyunWANGXiaZHAOWanting

CHENSikaiFENGAiyuan

人人文庫

2··

Contents

1Generalprovisions………………(1)

2Terms…………………………(2)

3Basicrequirements……………(3)

3.1Generalrequirements……………(3)

3.2Comprehensiveplanningandlayout………………(3)

4Designfortechnicalprotectionsystem…………(5)

4.1Generalrequirements……………(5)

4.2Generaldesign…………………(5)

4.3Videosurveillanceandcontrolsystem……………(6)

4.4Intrusionalarmsystem…………(8)

4.5Securityinspectionanddetectionsystem……………(9)

4.6Accesscontrolsystem……………(9)

4.7Guardtoursystem………………(10)

4.8Integratedsecurityplatform………………………(11)

5Designforphysicalprotectionsystem…………專用(13)

5.1Generalrequirements……………(13)

5.2Fencesandwalls………………(13)

5.3Securitylighting………………(14)

5.4Vehiclecontrolandparkingfacilities………………(14)

5.5Vehiclebarrier…………………(14)

5.6Stationenvironmentaldesign……………………(15)

5.7Othersecuritymeasures…………人人文庫(15)

6Designforengineeringofsecurityandprotectionsystemofprotectedobject…(17)

6.1Generalrequirements……………(17)

6.2Publicsecuritysurveillanceandcontrolcenter………(17)

6.3Operationandcontrolcenter……………………(17)

6.4Station…………………………(18)

6.5Rollingstockdepot………………(19)

6.6Section………………………(20)

6.7Substationorotherrelevantbuildings………………(21)

7Otherdesignrequirements……………………(23)

7.1Vehicles………………………(23)

7.2Communications………………(24)

7.3Powersupply,lightningprotectionandgrounding……………………(24)

7.4Equipmentroomofthesecuritysystem……………(25)

8Projectconstructionandsystemcommissioning………………(26)

8.1Constructionpreparation…………(26)

1··

8.2Pipelinelaying…………………(26)

8.3Equipmentinstallation…………(26)

8.4Constructionforpowersupply,lightningprotectionandgrounding……(27)

8.5Systemcommissioning…………(27)

9Engineeringinspectionandacceptance…………(31)

9.1Generalrequirements……………(31)

9.2Engineeringinspection…………(31)

9.3Engineeringacceptance…………(33)

9.4Projecthandover………………(35)

10Operationalmanagementevaluation…………(36)

10.1Generalrequirements…………(36)

10.2Currentsituationinvestigation……………………(36)

10.3Evaluationandanalysis…………(36)

10.4Rectification…………………(37)

AppendixASecurityrisklevelandprotectionmeasuresdesign…………………(38)

Explanationofwordinginthiscode………………(44)

Listofquotedstandards……………(45)

專用

人人文庫

2··

1Generalprovisions

1.0.1Thiscodeisformulatedtoregulateengineeringconstructionandmanagementforthepublic

securityandprotectionsystemofurbanrailtransitandtoensuretheprojectquality,toprotectthe

personalpropertyintheurbanrailtransitareas,andtoguaranteethesecurityofurbanrailtransit

operations.

1.0.2Thiscodeisapplicabletothedesign,construction,inspection,acceptanceandoperational

managementofthepublicsecurityandprotectionsystemengineeringofurbanrailtransitfornew

construction,extensionandrenovation.Thiscodeisnotapplicabletothetramsystems.

1.0.3Theconstructionofthepublicsecurityandprotectionsystemengineeringofurbanrailtransit

shallcoordinatewiththeurbanrailtransitsystem.Securityprincipleshalltakepriority,whereasopen

accesstotheurbanrailtransitbythepublicshallnotbeaffected.Thedesignandimplementationof

securityandprotectionmeasuresshallmeettherequirementsofurbanrailtransitforfast,efficientand

punctualoperation.

1.0.4Thepublicsecurityandprotectionsystemengineeringofurbanrailtransitshalltakemultiple

measuressuchastechnicalprotection,physicalprotection,personnelprotection,etc.,inorderto

constructanintegratedpublicsecurityandprotectionsystem專用ofurbanrailtransit.Technicalprotection

andphysicalprotectionshallcoordinatewitheachotherandbecapableofsupportingpersonnel

protection.

1.0.5Thepublicsecurityandprotectionsystemengineeringofurbanrailtransitshallbesafe,open,

scalableandflexibleinitsusage,anddesignedwiththeadvancedtechnologyforreliabilityandcost

effective;thetechnicalprotectionsystemsshallhaveinteroperablecommunicationcapabilities.

-

1.0.6Theengineeringdesign,construction,inspection,acceptanceandoperationalmanagementofthe

publicsecurityandprotectionsystem人人文庫ofurbanrailtransitshallnotonlycomplywiththiscode,butalso

complywiththecurrentrelevantnationallaws,regulationsandstandards.

1··

2Terms

2.0.1protectedobject

Objectthatneedtobeprotectedduetocertainrisks,andinthiscodethisspecificallyrefersto

people,vehicles,buildings,facilities,andequipmentintheurbanrailtransitareas.

2.0.2securityrisk

Peopleandtheirbehaviorsthatthreatenorattempttothreatenthesecurityoftheurbanrailtransit.

2.0.3integratedsecurityplatform

Hierarchicallydistributedcomputerintegratedsystemthatautomatesthemanagementand

--

monitoringofthetechnicalprotectionsystemsthroughaunifiedcommunicationsplatformand

managementsoftware.

2.0.4securityinspectionanddetectionsystem

Theelectronicequipmentandnetworksthatcheckwhetherdangerousgoods,weapons,andother

prohibitedgoodsarecarriedbypeopleorintheirluggage.

2.0.5informationsecurity

Theavailability,confidentialityandintegrityoftheinformation;italsoreferstotheauthenticity,

nonrepudiationandreliabilityoftheinformation.

-專用

2.0.6facerecognitiontechnology

Thecomputertechnologyforidentificationbyanalyzingandcomparingthevisualfeatures

informationofahumanface.

2.0.7intelligentvideoanalysis

Automaticanalysisandunderstandingofthecontentandrelationshipswithinvideoframesby

extractingvariousfeatureinformationfromvideoimagedata,resultinginastructureddescriptionof

videoimagestoachievethegoalof人人文庫obtainingkeyobjectprofilefromthevideo.

2.0.8publicsecuritysurveillanceandcontrolcenter

Thecentralcontrolroomofthesecurityandprotectionsystem.Thelocationwherethesecurity

managementsystemreceivesandprocessesthevideoinformation,thealarmsinformation,thestatus

information,etc.,fromthesecuritysurveillancesubcenterandeachsubsystem,andsendstheprocessed

-

alarminformationandmonitoringinstructionstothesecuritysurveillancesubcenterandrelated

-

subsystems.Alsoreferredtoasthesecuritysurveillanceandcontrolcenter.

publicsecuritysurveillanceandcontrolsubcenter

2.0.9-

Anodeinthesecurityandprotectionsystemthatcollects,processesandsharesinformationata

certainlevelorinacertainarea.Itisusedtoreceive,display,record,andprocessvideoinformation,

alarmsinformation,statusinformation,etc.,sentfromthefrontendandvarioussubsystems,to

communicatewiththeupperlevelsecuritysurveillancecenter,andtoacceptthemanagementofthe

-

higherlevelsecuritysurveillancecenter.Alsoreferredtoasthesecuritysurveillanceandcontrolsub

--

center.

2··

3Basicrequirements

3.1Generalrequirements

3.1.1Theengineeringdesignofthepublicsecurityandprotectionsystemofurbanrailtransitshallbe

basedontheoptimumusageoftheavailablepublicsecurityresources,andshallcomplywiththe

securitypolicies,preventativeproceduresandpreventativemeasurestoconstructasecuritysystemthat

coordinatesdeterrence,prevention,detection,delayandresponse.Thedesignshallalsoenhancethe

capabilitiesofpreventionandcontrol,reducethepossibilityofsecuritythreatsoccurringwithinthe

urbanrailtransitarea,andminimizepersonnelinjuriesandpropertylossesincaseathreatoccurs.

3.1.2Theprotectedobjectsintheurbanrailtransitshallbedeterminedaccordingtothearea,location,

andthetechnicalcharacteristics.Thesecurityandprotectionsystemengineeringshallbecapableof

employingcompleteandrelativelyindependentsecuritytechnologiesandmeasures.

3.1.3Theengineeringdesigncontentofthepublicsecurityandprotectionsystemofurbanrailtransit

shallcomprisethedesignoftechnicalprotection,physicalprotection,personnelprotection,and

emergencyresponseprocedure.

3.1.4Theengineeringdesignofthepublicsecurityandprotectionsystemofurbanrailtransitshall

reservespaceandarrangeevacuationroutesbasedonemergency專用rescue.Thedesignshallinclude

passengerevacuationareas,firstaidareas,rescuecommandposts,materialdistributionareasand

temporarystorageareas.

3.2Comprehensiveplanningandlayout

3.2.1Theoverallplanninganddesignofthepublicsecurityandprotectionsystemengineeringof

urbanrailtransitshallincludegeneralsecurityandprotectiondesign,securityandprotectiondesignof

protectedobjects,andcorresponding人人文庫emergencyresponsespacedesign.Thesecuritystrategiesand

measuresshallbedetermined,safetychannelsandspacesshallbeplanned,andevacuationspacesshall

beformed.Whensupportingsecuritycontrolcenteristobeprovided,itshallbeconstructedaccording

tothecorrespondingstandardsandregulations.

3.2.2Thedesignofthepublicsecurityandprotectionsystemengineeringshallcomprisethefollowing

strategiesandmeasures:

1Deterrenceandpreventativemeasures,includingvisibleandnotablesecurityfacilitiesand

equipment,warningsigns,environmentaldesignsusedforpreventingandclearlywarning,andphysical

protectionmeasures.

2Detectionandmonitoringmeasures,includingsecurityinspectionanddetection,video

surveillance,andidentificationtechnologies.

3Reinforcementandoptimizationmeasures,includingreinforcementandbackupofkeyfacilities

andequipment,useofelasticmaterials,designofsecuritydistances,andanoptimizedlayout.

4Rescueandrecoverymeasures,includingoptimizingevacuationroutesandsettingtheirsigns,

establishingtemporaryshelters,rescuesites,andrelevantrescuefacilitiesandequipmentoutsideurban

railtransitstations.

3··

3.2.3Theplanninganddesignofthepublicsecurityandprotectionsystemengineeringshallmeetthe

protectionrequirementsoftheprotectedobjects.Theprotectedobjectsthatareclearlyspecifiedinthis

codeshallbeprotectedinaccordancewiththerequirementsofthiscode.Theprotectedobjectsthatare

notcoveredinthiscodeshouldbeassessedinaccordancewiththeprovisionsinAppendixAofthis

code,andtheprotectionmeasuresshallbecompatiblewiththesecurityrisklevelsoftheprotected

objects.

3.2.4Theplanninganddesignofpublicsecurityandprotectionsystemengineeringshallrunthrough

theentireprocessoftheurbanrailtransitengineeringdesign,andshallbeincludedinthecorresponding

phasereportsoftheurbanrailtransitengineeringdesign.Thedesignresultsofeachphaseshallinclude

thefollowingcontents:

1Feasibilitystudystageoftheurbanrailtransitengineering:

1)Securityobjectivesandtheanalysisplanofsecuritystrategy.

)Costeffectivenessanalysisoftheprotectionmeasuresfortheprotectedobjects.

2-

3)Technicalplanforthesecuritymeasureandsecuritytechnology.

4)Feasibilityplan,includingsystemcomposition,themajorfunctionality,comparisonand

selectionofkeytechnicalmethodandcharts.

5)Investmentestimation.

2Preliminarystageofthedesignoftheurbanrailtransitengineering:

1)Systemcomponents,mainfunctions,selectionofmaintechnicalmeasures,maintechnical

specificationsandinterfacesofthesystem.專用

2)Quantitylistsofmajorprojects,majorequipmentandmaterials,andsketches.

3)Budgetestimate.

3Constructiondrawingdesignstageoftheurbanrailtransitengineering:

1)Technicalspecificationswhichincludesystemcomposition,systemfunctionalrequirements,

majortechnicalspecificationsofthesystemandequipment,specificequipmentconfiguration,

interfacerequirements,majorengineeringquantitylist,majorequipmentandmaterials

quantitylist,anddrawings人人文庫.

2)Detaileddesigndocuments,includingdesigndescription,tableofthenumberofprojects,

quantitytableofequipmentandmaterials,anddetailedconstructiondrawings.

4··

4Designfortechnicalprotectionsystem

4.1Generalrequirements

4.1.1Thetechnicalprotectionsystemofurbanrailtransitshallmeettheprotectionrequirementsof

theprotectedobjects.

4.1.2Thetechnicalprotectionsystemshallbeincorporatedintotheoverallurbanrailtransitsystem

andbedesignedwiththeoperationalsecuritysystem.

4.1.3Thesystemdesign,emergencyresponseandperipherytrafficmanagementoutsidethestation

shallbecoordinatedandconnectedtoeachother.

4.1.4Inthesystemdesign,thedesignunitshallmakerationaluseofsecurityresources,balance

securityinvestment,designprotectivemeasures,andformanintegratedpublicsecurityandtechnical

protectionsystem.

4.1.5Thesystemshallbeflexibleinuse,andshallbecapableofflexiblyformulatingoperatingprocedures

accordingtothemanagementrequirementsandmeettheusermanagementsecurityrequirements.

Thesystemshallbestandard,integrated,structured,modularandnetworkbased,scalable,and

4.1.6-

accommodatetherequirementsofsystemmaintenance,upgrades,capacityexpansionandtechnological

development.Whenthesystemisupgradedandexpanded,it專用shallbeensuredthatthehistoryrecords

continuetobeaccessibleeasily.

4.1.7Thesystemshallbehighlyreliable,andwithredundancyandbackuptechniques.Thedatabase

andsoftwarefordatarecordinginthetechnicalprotectionsystemshallhavestoragefunctions.

4.2Generaldesign

4.2.1Thepublicsecurityandtechnicalprotectionsystemengineeringofurbanrailtransitshall

beplanned,constructed,inspected人人文庫andacceptedsynchronouslyinlinewiththeoverallprojectof

thenewlyconstructedurbanrailtransit.Theexistingurbanrailtransitsecurityfacilitiesshallbe

renovatedandextendedinaccordancewiththerequirementsofthiscodewhentheexistingurban

railtransitsystemisrenovatedorexpanded.

4.2.2Technicalprotectionsystemofurbanrailtransitshallbeequippedwithvideosurveillanceand

controlsystem,intrusionalarmsystem,securityinspectionanddetectionsystem,accesscontrolsystem,

guardtoursystemandintegratedsecurityplatform.

4.2.3Thesubsystemsofthepublicsecurityandtechnicalprotectionsystemofurbanrailtransit

shallbeintegrated,andthenmanagedbyanindependentintegratedsecurityplatform.

4.2.4Thesystemsecuritydesignandelectromagneticcompatibilitydesignshallcomplywiththecurrent

nationalstandardGB50348TechnicalCodeforEngineeringofSecurityandProtectionSystem.

Thesysteminformationsecuritydesignshallmeettherequirementsofthesecondlevelof

4.2.5-

informationsystemsecurityandprotectiongradespecifiedinthecurrentnationalstandardGB/T22239

InformationSecurityTechnology—BaselineforClassifiedProtectionofInformationSystemSecurity,

andshallcomplywiththecurrentnationalstandardGB/T22080InformationTechnology—Security

Techniques—InformationSecurityManagementSystems—RequirementsandGA/T669.8Technical

5··

StandardofCityAreaMonitoringandAlarmingNetworkSystem-Part8:TechnicalSpecificationof

TransportNetwork.

4.2.6TheequipmentinthesystemshallcomplywiththecurrentnationalstandardGB/T26718

TechnicalRequirementsforSafetySystemofUrbanMassTransit.

4.3Videosurveillanceandcontrolsystem

4.3.1Thevideosurveillanceandcontrolsystemshallconsistofcameras,videoprocessingequipment,

storageequipment,monitoringandoperationterminals,managementsoftware,transmissionnetwork

andauxiliaryequipment.

4.3.2ThevideosurveillanceandcontrolsystemshallcomplywiththecurrentnationalstandardGB

50395CodeofDesignforVideoMonitoringSystems.

Thevideosurveillanceandcontrolsystemshallbecapableofcarryingoutrealtimeandeffective

4.3.3-

videosurveillanceoftheurbanrailtransitareas.Thesystemfunctionalityshallmeetthefollowing

requirements:

1Itshallbecapableofdisplayingandrecordingthecharacteristicsofpeopleandobjectsinthe

monitoredareainrealtime.

-

2Itshallbecapableofretrieving,replayinganddownloadingtherecordedhistoricalimageswhen

required.

3Thedisplayofthemonitoringscreenshallbeprogrammable,andshallsupportbothautomatic

andmanualswitching;theindexnumberandlocationofeach專用camera,andtimeanddateinformation

shallbedisplayedonthescreen.

4Itshallbesynchronizedwiththeclocksystemofurbanrailtransit.

5Itshallbecapableofemittingwarningmessagesaccordingtothesetalarmtriggerconditions.

6Anoperationlogshallberecorded,andthestoredinformationshallnotbelostafterapower

failureorshutdown.Therecordinformationshallnotbestoredforlessthan90danddeletioncannotbe

allowedduringthattimeperiod.

7Adigitalnetworkingmodel人人文庫shallbeincluded.

4.3.4Thevideosurveillanceandcontrolsystemdesignshallmeetthefollowingrequirements:

Thecameraconfigurationshallprimarilybefixedcameras,andpantiltzoom(PTZ)cameras

1--

canbeimplementedforassistanceifneeded.

2Therecordedimageinformationshallnotbemodified.

3Thecamerasensitivityshallbecompatiblewiththeambientilluminance.

4Itshallbecapableofrunningandoperatingindependently,sendinginformationtotheintegrated

securityplatform,beingconnectedtothepublicsecurityinformationsharingplatform,andcoordinating

withothersubsystemsofthetechnicalprotectionsystem.Theinformationtransmission,information

exchange,andinformationcontrolofthevideosurveillanceandcontrolsystemofurbanrailtransitand

thepublicsecurityvideosurveillancenetworksystemshallcomplywiththecurrentnationalstandard

GB/T28181TechnicalRequirementsforInformationTransport,SwitchandControlinVideo

SurveillanceNetworkSystemforPublicSecurity.

5Thereshallbenoobstructioninthemonitoringrange.

6Themonitoringdurationrequirementsoftheurbanrailtransitoperationsshallbemet;the

monitoringequipmentinkeyprotectedareas,keysitesandunmannedlocationsshallmeetthe

6··

requirementof24hoperation.

7Thepicturetakenbythecamerashallnotbedeformedordistorted,andthequalitylevelofthe

realtimedisplayandvideoplaybackimageofthesystemshallnotbelowerthanthesubjective

-

evaluationratinglevel4specifiedinthecurrentnationalstandardGB50198TechnicalCodeforProject

ofCivilClosedCircuitMonitoringTelevisionSystem.Theresolutionofthevideoimagesstoredand

playedbacklocallyatthestationshallbenolowerthan1280×720pixels,andtheimageframerate

shallbenolessthan25fps.

8Theelectromagneticcompatibilityofthesystemshallcomplywiththecurrentnational

standardGB50395CodeofDesignforVideoMonitoringSystem.

9Thesystemshallhaveabackuppowersupply,anditshallbecapableofcontinuingtowork

normallyfornolessthan2hwhenapowerfailureoccurs.

10Thecamerasinstalledattheentranceandexitofrollingstockdepotsshallbecapableof

clearlycapturingtheplatenumbersofallenteringandexitingvehicles.

11Forthecamerasinstalledattheentranceandexitofstations,itisnecessarytohaveatleast

onecamerathatcaneffectivelycaptureandmonitortheactivitiesofpeopleandobjectswithina15m

rangeoutsidetheentrance.Duringaperson'stimeinthestation,atleast2frontalimagesshallbetaken

foridentificationpurposes.

12Thesurveillancecameradeployedonthestationplatformshallcoverthedoorareaofthetrain

passengercompartmentandfocusclearlyonpassengerswaitingforthetrain,aswellasthosegettingon

andoffthetrain.Additionally,therecordedimagesshallbe專用capableofbeingseamlesslystitched

together.Incasethecivilstructureofatrainstationplatformreservesextralengthforadditional

carriages,thesurveillancecamerasystemconstructionshallhavethecapacitytoaccommodate

additionalcameradeployments.

13Thecamerainstallationanglesandthequalityoftherecordedimagesinstationpassagesand

ticketgatesshouldmeettherequirementsoffacerecognitionandintelligentvideoanalysis.

4.3.5Thevideosurveillanceandcontrolsystemshouldcombinefacerecognitionandintelligentvideo

analysistechnology,andshouldmeet人人文庫thefollowingrequirements:

1Theintelligentvideoanalysissystembasedonthevideosurveillanceandcontrolsystemshould

havethefollowingfunctions:

1)Functionalityofidentifyingandalarmingthepredefinedabnormalbehaviorsandsuspicious

objects.

2)Abilitytoobserveandsearchforpredefinedabnormaleventsinadvancewithinapredetermined

rangeandtime.

3)Functionalityofcontinuoustracking,displayandvideosearchforpredefinedtargets.

4)Functionalityofmeasuringthepassengerflow.

2Thefacerecognitionsystembasedonthevideosurveillanceandcontrolsystemshouldhave

collection,storage,prelayoutandretrievalfunctions,andshouldmeetthefollowingrequirements:

-

1)Whensettingupcamerasforthevideosurveillancesysteminthecorridorandstationturnstile

areas,itshouldcapturefrontalfacialimagesofpeopleenteringandexitingthearea,andthe

imagequalityshallmeettherequirementsofthecurrentnationalstandardGB/T26718

TechnicalRequirementsforSafetySystemofUrbanMassTransit.

2)Thecollectedfrontalimagesofthefacesshouldbestored,andthefrontalscreenshotofthe

7··

faceandscenephotosshouldbesavedtoformafaceimagecapturedatabase.

3)Thecollectedfaceimagesshouldbecomparedwiththearchivedfaceimagedata,ortheface

imagesfromthestoreddatafileformanualverification.

4)Whenthesystemisappliedonalargescalewithmultiplemachines,itshouldsupport

distributednetworkingfunctions.

4.4Intrusionalarmsystem

Theintrusionalarmsystemshallbecomposedoffrontendequipment,transmissionequipment,

4.4.1-

aswellascontrol,display,processingandrecordingequipment.

4.4.2TheintrusionalarmsystemshallcomplywiththecurrentnationalstandardGB50394Codeof

DesignforIntrusionAlarmSystemsEngineering.

Theintrusionalarmsystemshalleffectivelydetectandalarmtheillegalintrusionsintheset

4.4.3-

conditionareaoftheurbanrailtransit,andthesystemfunctionsshallmeetthefollowingrequirements:

1Itshallbecapableofdetectingtheentryofunauthorizedpersonsinrealtime,andshallissue

acousticopticalalarminformation.

-

2Itshallbecapableofarbitrarilyprogrammingthesetandunsetprotectionstatusaccordingto

thetime,areaandsite.Thereshallbeacleardifferencebetweenthesetandunsetprotectionstatus

configuration.

Itshallhaveantivandalismandfaultalarmfunctions.

3-

4Itshallhavethecapabilityofdisplayingandrecording專用informationrelatedtoalarms,faults,

sabotage,operationrequests,etc.Therecordedinformationshallincludetime,location,typeofincident,

etc.,anditshallbenonmodifiable.

-

4.4.4Theintrusionalarmsystemshallmeetthefollowingrequirements:

1Thedesignshallbebasedontheprinciples,functions,andperformanceofdifferentsensors,and

betailoredtosecurityrequirements.Itshallformacomprehensiveprotectionsystembycombining

points,lines,areas,spacesortheircombinations.

2Itshallbecapableofrunning人人文庫andoperatingindependently,sendingalarmmessagestothe

integratedsecurityplatform,receivingandexecutingcontrolsignalsfromthesecuritysurveillance

centerorsecuritysurveillancesubcenter,andbecapableofcooperatingwithothersubsystemsinthe

-

technicalprotectionsystem.

Inperimeterandunmannedareas,thesystemshallhave24houralarmingfunction.

3-

4Theresponsetimeforthesystemtotriggeranalarmshallnotexceed2s.

5Thefencesystemutilizingpulseelectronicfencesorothertypesoffencesshallbeemployedin

cooperationwiththevideosurveillanceandcontrolsystemsandsecuritylighting.Thepulsevoltageof

thepulseelectronicfencesshallrangebetween5000Vand10000V,andbecapableofadjustingin

multiplegearswhenneeded.Thefunctionsofelectricshockdeterrenceandpositioningalarmdisplay

shallbeprovided.

6Thesystemshallhaveabackuppowersupply,anditshallbecapableofcontinuingtowork

normallyfornolessthan8hafterapowerfailure.

7Thefollowingrequirementsshallbecompliedwithinthecaseofsystemalarm,falsealarm,set

andunsetcondition:

1)Thereshallbenoalarmfailureduringthenormaloperationofthesystem.

8··

2)Theacousticopticalalarminformationshallbecapableofbeingmaintaineduntilamanual

-

resetoperation,andthealarmsignalinformationshallnotbelost.

)Theemergencyalarmdevicesshallhaveanondisarmsettingfunctionandmeasuresto

3-

preventthemfromfalsetriggering,andshallbeselflockedwhentriggered.

-

4.5Securityinspectionanddetectionsystem

4.5.1Securityinspectionanddetectionsystemsshouldcomprisedetectionsystemsforexplosives,

hazardousliquid,poisonousgas,radiativematerials,conventionalweaponsandmetaldetectorsandXray

-

inspectionsystems.Securityinspectionanddetectionsystemsshallincludeportableandfixedsystems.

4.5.2Thefunctionsofthesecurityinspectionanddetectionsystemshallmeetthefollowing

requirements:

1ItshallbecapableofdetectingthehazardousmaterialslistedintheDangerousGoodsCatalog

formulatedbythenational,localandrelevantdepartments.

2Whenhazardousmaterialisinspectedanddetected,alarmsanddatarecordsshallbe

implemented.

Thesecurityinspectionanddetectionsystemshouldbenetworked,toformanetwork

3-

supportedsecurityinspectionanddetectionsystem;itshouldalsobecapableoftrackingthedispersion

ofhazardousmaterialsanddeterminethesubsequentradiusoftheireffectsandinduceddamages.

4Itshallhavewiredorwirelesstransmissionfunctionalities.Data,alarmsignalsanddirections,

equipmentstatusandotherinformationshallbetransmittedtothe專用integratedsecurityplatform.

4.5.3Thesecurityinspectionanddetectionsystemshallmeetthefollowingrequirements:

1Thesettingofthedetectionequipmentshallmeetthefollowingrequirements:

1)Poisonousandharmfulgasdetectionsensorsshouldbeinstalledinareassuchasventilation

wellsinurbanrailtransitareasandpassengertrafficconcentratedpassagewaysinstations.

2)Explosivedetectors,hazardousliquidsdetectors,weaponsandmetaldetectors,andradioactive

materialdetectorsshallbeinstalledinthepassagewayforpassengersenteringthestation.

2Thesystemshallnotcause人人文庫harmtothehumanbodiesorobjects,shallnotdetonateexplosives

origniteflammablegas,andshallnotcausesecondarydisasters.

3Thesystemshallhaveanetworkedsystemdesign.Alldetectorsshallbenetworkedwiththe

securitysurveillancecenterorsubcenter.

-

4Whenthesystemgeneratesanalarm,thevideosurveillanceandcontrolsystemshallbelinked

forvisualreview.

5Thealarmmessageshallbestoreduntilmanualreset.

6Portablesecurityinspectionanddetectionsystemsshallnotusedeviceswithradioactive

isotopes.

TheradioactivesubstancedetectorshallconductrayleakagedetectionforXrayinspection

7-

systemsandotherequipmentatanytime.

8Securitypersonnelshallbeprotected.

4.6Accesscontrolsystem

4.6.1Theaccesscontrolsystemshallconsistofreadingunits,informationtransmissionunits,

informationmanagementunitsandexecutionunits.

9··

4.6.2TheaccesscontrolsystemshallcomplywiththecurrentnationalstandardGB50396Codeof

DesignforAccessControlSystemsEngineering.

4.6.3Forallkindsofentranceandexitthatneedtobecontrolledintheurbanrailtransitarea,the

accesscontrolsystemshallhavethefunctionalityofrealtimecontrolandmanagementoftheaccessof

-

differentpassingobjectsaccordingtotheaccessclassificationsofthepassingobject.Thesystem

functionshallmeetthefollowingrequirements:

Realtimecontrolshallbecarriedoutonthelocation,passingobjectsandpassingtimeofthe

1-

controlledarea.

2Thesystemshallhaveanalarmfunction.

Thesystemshouldhaveantitailgatingmeasures.

3-

4Thesystemshallmeettherequirementsforevacuationduringanemergencyescape.

4.6.4Thedesignofaccesscontrolsystemshallmeetthefollowingrequirements:

1Thesystemshallbecapableofrunningandoperatingindependently.Itshallbecapableof

sendingalarmmessagestotheintegratedsecurityplatform,receivingandexecutingcontrolsignalsfrom

thesecuritysurveillancecenterorsecuritysurveillancesubcenter,andshallbelinkedwiththevideo

-

surveillanceandcontrolsystem.

2Whenthepowersupplyisabnormalorthepowerfailureoccurs,thesecretkeyinformationand

variousrecordsofthesystemshallnotbelost.

3Thebackuppowersupplyofthesystemshallensurethatthesystemcouldoperatecontinuously

fornolessthan48h.專用

4Thestoragetimeofsystemrecordsshallbenolessthan180d.

4.7Guardtoursystem

4.7.1Theguardtoursystemshallconsistofinformationdevices,collectiondevices,information

conversionandtransmissiondevicesandmanagementterminals.

4.7.2TheguardtoursystemshallcomplywiththecurrentprofessionalstandardGA/T644

SpecificationsforElectronicPatrol人人文庫System.

4.7.3Theguardtoursystemshallsuperviseandrecordtheworkconditionsofinspectorsthrough

informationreadingandothermethods.Thesystemfunctionshallmeetthefollowingrequirements:

1Differentinspectionplansshallbemadefordifferentinspectionlocations,timesandpersonnel.

2Thecollectiondeviceshallbecapableofaccuratelyrecordingthedetailedtime,locationand

personnelinformationofthescheduledareaandrouteinspection.

3Thecollectiondeviceshallbecapableofstoringnolessthan4000piecesofinspection

information,andthestoragetimeofthestoredmessagesshallbenolessthan10d.

4Themanagementterminalshallpossessthecapabilitytoextractinformationfromthe

collectiondevicetogeneratearecordforeasyqueryingandstatisticalanalysis.Therecorded

informationshallberetainedforaminimumof30d.Themanagementterminalshallhavetheabilityto

synchronizethecollectiondevice'stime.

4.7.4Theguardtoursystemshallmeetthefollowingrequirements:

1Thesystemshallbeconnectedtotheintegratedsecurityplatform.

2Theinstallationlocationofthecollectiondeviceshallcovertherollingstockdepot,the

operationcontrolcenter,etc.

10··

4.8Integratedsecurityplatform

Theintegratedsecurityplatformshallbecomposedofsitelevelandlinecenterlevelstructures

4.8.1---

inaccordancewiththerequirementsofthepublicsecuritysurveillancemanagement.Districtleveland

-

linenetworklevelstructuresshouldbeimplementedaccordingtothescalesoftheurbanrailtransit.

--

Eachleveloftheintegratedsecurityplatformcanbecomposedofservers,workstations,datastorage

devices,p

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論