下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、- 1 - / 7路面結(jié)構(gòu)課程設(shè)計譚詩亮2018210076381、背景基于KENLAYER計算機(jī)程序的路面結(jié)構(gòu)設(shè)計2、輸入數(shù)據(jù)KENLAYER程序中菜單欄的目錄項(xiàng)依次輸入下列數(shù)據(jù)。Gen eralMATL=1,NDAMA=0,NPY=1,NLG=1,DEL=0.001,NL=3,NZ=3,ICL=80,NSTD=9,NBOND=1,NLBT=1,NLTC=1,NUNIT=1Zcoord ZC1=1,ZC2=9.9,ZC3=15.1Layer TH1=10,TH2=15,PR1=0.35, PR2=0.35,PR3=0.45Moduli E仁700000,E2=300000, E3=20000
2、,Load LOAD=1,CR=10,CP=700,YW=30,XW=0,NP OR NPT=2XPT仁0, YPT1=-10, XPY2=0, YTP2=15基于上述基數(shù),變換bascB度,同時設(shè)兩個時期,E:60C,E:-10C輸出結(jié)果如下:以h15.1為例,表示h=15時,60C下的結(jié)果輸出,如下:INPUT FILE NAME -C:KENPAVEh15-1.DATNUMBER OF PROBLEMS TO BE SOLVED = 1TITLE -h152MATL = 1 FOR LINEAR ELASTIC LAYERED SYSTEMNDAMA = 0, SO DAMAGE ANA
3、LYSIS WILL NOT BE PERFORMEDNUMBER OF PERIODS PER YEAR (NPY = 1NUMBER OF LOAD GROUPS (NLG = 1TOLERANCE FOR INTEGRATION (DEL - = .001NUMBER OF LAYERS (NL- = 3NUMBER OF Z COORDINATES (NZ=3LIMIT OF INTEGRATION CYCLES (ICL- = 80COMPUTING CODE (NSTD-= 9- 2 - / 7SYSTEM OF UNITS (NUNIT- = 1Len gth and displ
4、aceme nt in cm, stress and modulus in kPaunit weight in kN/mA3, and temperature in CTHICKNESSES OF LAYERS (TH ARE : 10 15POISSONS RATIOS OF LAYERS (PR ARE : .35 .35 .45VERTICAL COORDINATES OF POINTS (ZC ARE: 1 9.9 25.1ALL INTERFACES ARE FULLY BONDEDFOR PERIOD NO. 1 LAYER NO. AND MODULUS ARE :1 7.000
5、E+05 2 3.000E+053 2.000E+04LOAD GROUP NO. 1 HAS 2 CONTACT AREASCONTACT RADIUS (CR- = 10CONTACT PRESSURE (CP- = 700NO. OF POINTS AT WHICH RESULTS ARE DESIRED (NPT- = 2WHEEL SPACING ALONG X-AXIS (XW- = 0WHEEL SPACING ALONG Y-AXIS (YW- = 30RESPONSE PT. NO. AND (XPT, YPT ARE: 1 0.000 -10.000 2 0.000 15.
6、000PERIOD NO. 1 LOAD GROUP NO. 1POINT VERTICAL VERTICAL VERTICAL MAJOR MINOR INTERMEDIATEDISPL.PRINCIPAL PRINCIPAL PRINCIPALNO. COORDINATE (HORIZONTAL STRESS STRESS STRESS STRESSP. STRAIN (STRAIN (STRAIN (STRAIN (STRAIN11.000000.16026337.592701.439169.481 662.674(STRAIN 2.618E-04 -1.157E-04 5.860E-0
7、4 -4.399E-04 5.112E-0419.900000.15909176.331274.446-144.993 -111.160(STRAIN -2.888E-04 3.309E-04 5.201E-04 -2.888E-04 -2.235E-04125.100000.1505638.84042.5937.3768.964(STRAIN -7.912E-04 1.490E-03 1.762E-03 -7.912E-04 -6.761E-0421.000000.175621.334608.6221.333410.986(STRAIN 2.821E-04 -5.079E-04 6.633E
8、-04 -5.079E-04 2.821E-0429.900000.17711137.955137.955-146.987132.767(STRAIN -3.453E-04 2.042E-04 2.042E-04 -3.453E-04 1.942E-04225.100000.1673648.68948.6898.05813.392(STRAIN -9.939E-04 1.952E-03 1.952E-03 -9.939E-04 -6.072E-04POINT VERTICAL NORMAL X NORMAL Y SHEAR XY SHEAR YZ SHEAR XZSTRESS STRESS S
9、TRESS STRESS STRESSNO. COORDINATE (STRAIN (STRAIN (STRAIN (STRAIN (STRAIN11.00000 6.627E+02 5.333E+02 0.000E+00 -2.473E+02 0.000E+00(STRAIN 5.112E-04 2.618E-04 0.000E+00 -9.539E-04 0.000E+00- 3 - / 719.90000 -1.450E+02 -1.304E+01 0.000E+00-1.679E+020.000E+00(STRAIN -2.888E-04 -3.430E-050.000E+00 -6.
10、478E-04 0.000E+00125.10000 7.376E+00 1.272E+01 0.000E+00-1.059E+010.000E+00(STRAIN -7.912E-04 -4.040E-040.000E+00 -1.535E-03 0.000E+0021.00000 6.086E+02 4.110E+020.000E+000.000E+000.000E+00(STRAIN6.633E-042.821E-04 0.000E+000.000E+000.000E+0029.90000 -1.470E+02 1.328E+02 0.000E+000.000E+000.000E+00(
11、STRAIN -3.453E-041.942E-04 0.000E+000.000E+000.000E+00225.10000 8.058E+00 1.339E+01 0.000E+000.000E+00 0.000E+00(STRAIN -9.939E-04 -6.072E-040.000E+000.000E+000.000E+00從上述輸出結(jié)果可以看出,在E=700MPa的情況下,A點(diǎn)壓應(yīng)變(VERTICALSTRAIN=1.952E-03 B點(diǎn)拉應(yīng)力(NORMAL X STRESS=-1.470E+02C點(diǎn)剪應(yīng)力(SHEAR YZ STRESS=-2.473E+02 = 1NUMBER
12、OF LOAD GROUPS (NLG = 1TOLERANCE FOR INTEGRATION (DEL - = .001NUMBER OF LAYERS (NL- = 3NUMBER OF Z COORDINATES (NZ=3LIMIT OF INTEGRATION CYCLES (ICL- = 80COMPUTING CODE (NSTD-= 9SYSTEM OF UNITS (NUNIT- = 1Len gth and displaceme nt in cm, stress and modulus in kPaunit weight in kN/mA3, and temperatur
13、e in CTHICKNESSES OF LAYERS (TH ARE : 10 15POISSONS RATIOS OF LAYERS (PR ARE : .35 .35 .45VERTICAL COORDINATES OF POINTS (ZC ARE: 1 9.9 25.1ALL INTERFACES ARE FULLY BONDEDFOR PERIOD NO. 1 LAYER NO. AND MODULUS ARE :1 1.000E+07 2 3.000E+053 2.000E+04LOAD GROUP NO. 1 HAS 2 CONTACT AREASCONTACT RADIUS
14、(CR- = 10CONTACT PRESSURE (CP-= 700- 4 - / 7NO. OF POINTS AT WHICH RESULTS ARE DESIRED (NPT- = 2WHEEL SPACING ALONG X-AXIS (XW- = 0WHEEL SPACING ALONG Y-AXIS (YW- = 30RESPONSE PT. NO. AND (XPT, YPT ARE: 1 0.000 -10.000 2 0.000 15.000PERIOD NO. 1 LOAD GROUP NO. 1POINT VERTICAL VERTICAL VERTICAL MAJOR
15、 MINOR INTERMEDIATEDISPL.PRINCIPAL PRINCIPAL PRINCIPALNO. COORDINATE (HORIZONTAL STRESS STRESS STRESS STRESSP. STRAIN (STRAIN (STRAIN (STRAIN (STRAIN1.000000.11582333.6762049.151(STRAIN 7.592E-05 -9.412E-05 1.375E-04 -1.049E-04 8.673E-0519.90000 0.1156661.81664.931 -2131.948 -1496.364(STRAIN -1.631E
16、-04 1.331E-04 1.335E-04 -1.631E-04 -7.729E-05125.10000 0.1111820.78021.9654.7965.408(STRAIN -3.761E-04 7.828E-04 8.686E-04 -3.761E-04 -3.317E-0421.00000 0.12383-0.773 2324.611-0.773 1785.773(STRAIN 9.724E-05 -1.439E-04 1.700E-04 -1.439E-04 9.724E-0529.90000 0.1237870.72070.720 -2563.319 -1706.254(ST
17、RAIN -1.991E-04 1.565E-04 1.565E-04 -1.991E-04 -8.338E-05225.10000 0.1182524.45024.4505.0256.256(STRAIN -4.396E-04 9.687E-04 9.687E-04 -4.396E-04 -3.504E-04POINT VERTICAL NORMAL X NORMAL Y SHEAR XY SHEAR YZ SHEAR XZSTRESS STRESS STRESS STRESS STRESSNO. COORDINATE (STRAIN (STRAIN (STRAIN (STRAIN (STR
18、AIN11.000002.049E+03 1.593E+030.000E+00 -3.274E+020.000E+00(STRAIN1.375E-04 7.592E-050.000E+00 -8.839E-050.000E+0019.90000 -2.132E+03 -1.493E+03 0.000E+00 -6.967E+010.000E+00(STRAIN -1.631E-04 -7.687E-05 0.000E+00 -1.881E-050.000E+00125.10000 4.796E+00 6.593E+000.000E+00-4.267E+000.000E+00(STRAIN -3
19、.761E-04 -2.458E-04 0.000E+00 -6.187E-040.000E+0021.00000 2.325E+03 1.786E+030.000E+000.000E+00 0.000E+00(STRAIN1.700E-04 9.724E-050.000E+00 0.000E+000.000E+0029.90000 -2.563E+03 -1.706E+03 0.000E+00 0.000E+000.000E+00(STRAIN -1.991E-04 -8.338E-05 0.000E+000.000E+00 0.000E+00225.10000 5.025E+00 6.25
20、6E+000.000E+00 0.000E+000.000E+00(STRAIN -4.396E-04 -3.504E-04 0.000E+000.000E+00 0.000E+00從上述輸出結(jié)果可以看出,在E=700MPa的情況下,A點(diǎn)壓應(yīng)變(VERTICAL253.6641673.24- 5 - / 7STRAIN=9.687E-04 B點(diǎn)拉應(yīng)力(NORMAL X STRESS=-2.563E+03C點(diǎn)剪應(yīng)力(SHEARYZ STRESS=-3.274E+02B 點(diǎn)拉應(yīng)力(NORMAL XSTRESSC 點(diǎn)剪應(yīng)力(SHEAR YZSTRESSE=700MPaE=10000MPaE=700M
21、PaE=10000MPaE=700MPaE=10000MPah=151.952E-039.687E-04-1.470E+02-2.563E+03-2.473E+02-3.274E+02h=201.564E-038.604E-04-8.183E+01-2.260E+03-2.431E+02-3.213E+02h=251.274E-037.539E-04-5.312E+01-2.037E+03-2.406E+02-3.168E+02h=301.052E-036.585E-04-4.103E+01-1.874E+03-2.390E+02-3.136E+02h=358.809E-045.762E-04
22、-3.690E+01-1.755E+03-2.379E+02-3.113E+02h=407.463E-045.061E-04-3.664E+01-1.667E+03-2.372E+02-3.096E+02h=456.391E-044.466E-04-3.826E+01-1.602E+03-2.367E+02-3.083E+02考察上述數(shù)據(jù),找出在兩種不同模量情況下滿足TcO.5mpa,(T b1.5mpa, 9.7mic的厚度。從上表可以看出,從h=35起,A點(diǎn)壓應(yīng)變滿足要求,C點(diǎn)剪應(yīng)力也滿足要求,B點(diǎn)拉應(yīng)力在E=700MPa寸也滿足要求,僅僅B點(diǎn)拉應(yīng)力 在E=10000MPa時不滿足要求,且
23、基層厚度達(dá)到最大h=45時B點(diǎn)拉應(yīng)力在E=10000MP時也不滿足要求。因此需要改變面層厚度。B、瀝青面層和半剛性基層底面拉應(yīng)力驗(yàn)算指標(biāo)是用于避免結(jié)構(gòu)層的不合理組 合或材料的不合理- 6 - / 7選用,引起相對薄弱環(huán)節(jié)處出現(xiàn)某種類型的破壞,所以設(shè)置 了相應(yīng)的單項(xiàng)控制指標(biāo)。但是在層間接觸為連續(xù)的情況下,瀝青面層底面的應(yīng) 力雖處于受壓狀態(tài),在層間接觸為滑動的情況下,瀝青面層底面的應(yīng)力雖處于 受拉狀態(tài),但瀝青面層的疲勞壽命仍大于半剛性基層,因而,瀝青面層底面拉 應(yīng)力驗(yàn)算指標(biāo)在設(shè)計中不會起控制作用。我國瀝青路面設(shè)計體系采用的是力學(xué) 經(jīng)驗(yàn)法,其路面模型借鑒于SHEL的理論設(shè)計法,把路面作為一種多層彈性
24、體系 。設(shè)計彎沉是表征路面整體剛度大小的指標(biāo),是路面厚度設(shè)計的主要依據(jù),層 底拉應(yīng)力作為驗(yàn)算指標(biāo)。更改設(shè)計參數(shù),重新輸入設(shè)計數(shù)據(jù),即可輸出數(shù)據(jù)。下面列出在基層厚度h=35,面層厚度h0=12;基層厚度h=35,面層厚度h0=13;基層厚度h=40,面層厚度h0=12三種情況下A、B、C點(diǎn)的應(yīng)力應(yīng)變情 況。分析討論是否滿足要求?;鶎雍穸萮) 面層厚度C 點(diǎn)剪應(yīng)力(SHEAR YZSTRESSE=700MPaE=10000MPaE=700MPaE=10000MPaE=700MPaE=10000MPah=35(h0=128.110E-044.879E-04-7.563E+01-1.585E+03-2.330E+02-2.835E+02h=35(h0=137.787E-044.500E-04-8.895E+01-1.500E
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 中共中央對外聯(lián)絡(luò)部事業(yè)單位2026年度公開招聘工作人員備考題庫及完整答案詳解1套
- 暑假前安全教育課件下載
- 2026-2030中國足部滋潤霜行業(yè)市場分析及競爭形勢與發(fā)展前景預(yù)測研究報告
- 2025-2030中國包裝設(shè)計行業(yè)發(fā)展分析及競爭格局與發(fā)展趨勢預(yù)測研究報告
- 2025至2030中國區(qū)塊鏈技術(shù)應(yīng)用場景及投資潛力分析報告
- 2026年武義縣大田鄉(xiāng)人民政府招聘備考題庫及一套答案詳解
- 2025至2030私募股權(quán)行業(yè)市場發(fā)展分析及前景趨勢與投資策略研究報告
- 2025至2030港口機(jī)械行業(yè)政策導(dǎo)向分析及區(qū)域市場潛力與資產(chǎn)證券化路徑研究報告
- 中央戲劇學(xué)院2025年招聘備考題庫(智能戲劇藝術(shù)空間教育部重點(diǎn)實(shí)驗(yàn)室)及1套參考答案詳解
- 2025-2030中國交流斷路器行業(yè)市場發(fā)展趨勢與前景展望戰(zhàn)略研究報告
- 重癥醫(yī)學(xué)科醫(yī)院感染控制原則專家共識(2024)解讀
- 綜合門診部管理制度
- 定制手機(jī)采購合同協(xié)議
- 數(shù)據(jù)治理實(shí)施方案
- 煤磨動火作業(yè)施工方案
- 工程施工及安全管理制度
- 虛擬電廠解決方案
- 嗜酸性粒細(xì)胞與哮喘發(fā)病關(guān)系的研究進(jìn)展
- 《陸上風(fēng)電場工程可行性研究報告編制規(guī)程》(NB/T 31105-2016)
- 京瓷哲學(xué)手冊樣本
- 五年級簡便計算100題
評論
0/150
提交評論