1、- PAGE 9 -NTC 南京汽輪電機(jī)集團(tuán)Nanjing Turbine & Electric Machinery Group.通用燃煤電廠工程General Coal-fired Power Plant Project 收集資料清單Data Collection List南 京 汽 輪 電 力 工 程 設(shè) 計(jì) 院 有 限 公 司 NANJING TURBINE POWER STATION ENGINEERING DESIGN INSTITUTE CO.,LTD No.80 NORTH ZHONGYANG ROAD, NANJING, CHINATEL:0086 025 84066449 F
2、AX:0086 025 85515306 設(shè)計(jì)基礎(chǔ)資料清單Design basic data list 工程名稱project title:設(shè) 計(jì) 號(hào)design no:建設(shè)單位Construction unit :設(shè)計(jì)階段Design phase:序 號(hào)no基 礎(chǔ) 資 料 名 稱basic data description 份 數(shù)number提交日期Submit date1熱機(jī)專業(yè)thermo-dynamic part 1.1煤質(zhì)全分析資料、煤價(jià)、產(chǎn)地、運(yùn)輸方式等。Coal complete analysis data, coal cost, producing area, transpor
3、tation method etc 1.2熱負(fù)荷情況:壓力、溫度、用量、生產(chǎn)情況、(工業(yè)、采暖、制冷)。Thermo load condition: pressure, temperature, usage quantity, produce condition(industrial, heating, refrigeration) 1.3當(dāng)?shù)貙?duì)脫硫和除塵的要求;灰渣綜合利用情況。Local requirement on desulfurize and dedusting; ash comprehensive using condition 1.4當(dāng)?shù)貙?duì)煙囪高度是否有限制;建設(shè)場(chǎng)地附近有否文物
4、古跡。Whether local has the restriction on the chimney height, whether around construction area has cultural relics and historic sites2電氣專業(yè) electric part 2.1發(fā)電機(jī)出線電壓、并網(wǎng)電壓、并網(wǎng)點(diǎn)系統(tǒng)短路容量或短路電流。(要考慮到發(fā)展規(guī)劃,并折算到電廠母線)Generator outgoing feeder voltage, grid combination voltage, grid combination point system short ci
5、rcuit capacity or short circuit current 2.2出線方向、距離。Outgoing feeder direction, distance 2.3電網(wǎng)分布情況、用電負(fù)荷及用電情況。Power grid distribution condition, electro-load and electricity consumption condition3土建專業(yè) civil part3.1地 形topography3.1.1區(qū)域位置地形圖。Regional Location Topographic Chart3.1.2廠址地形圖(測(cè)量范圍在廠區(qū)周圍100米或更大一
6、些范圍)要求比例1:1000或1:2000。opographic Map (Measurement area runs the compass of 100 meters or even more around the plant),required scale is 1:1000 or 1:2000.3.1.3廠區(qū)地形圖1:500,能反映平面和豎向情況的圖紙,包括水源位置、交通接入位置等。Plant Area Topographic Map 1:500, which could reflect plane and vertical drawings, including water orig
7、in location, transportation juncutre point etc.3.2氣 象Climate3.2.1氣溫和濕度Temperature and Humidity年平均、最高、最低溫度。Annual Average, Max., Min temperature 平均、最大、最小相對(duì)濕度和絕對(duì)濕度。Annual Average, Max., Min. Relative Humidity and Absolute Humidity c.平均、最大晝夜溫差。Average, Max. Day and Night Temperature Differential3.2.2降水
8、量precipitation volume 歷年平均、最大、最小降雨量。Annual, Max., Min., precipitation volumn3.2一晝夜、小時(shí)最大降雨量。Max. Precipitation Volume Per Day& Night, Per Hour一次暴雨持續(xù)時(shí)間和最大降雨量。Continuous Time Duration and Max. Rainfall Volume Per Torrential rain3.2.3風(fēng)wind平均、最大風(fēng)速、風(fēng)壓。Average, Max. Wind Velocity, Wind Pressure全年和夏季風(fēng)頻和風(fēng)向。W
9、ind Frequency and Wind Direction of All-year and summer3.2.4氣壓。Air pressure 年平均、絕對(duì)最高、絕對(duì)最低氣壓。Annual average, absolute highest, absolute lowest air pressure 3.3交 通Traffic 3.3.1公路:當(dāng)?shù)毓返倪\(yùn)輸能力、公路接入點(diǎn)的坐標(biāo)和標(biāo)高:公路等級(jí)和路面寬度。Highroad: Conveyance Capacity of Local Highway, Coordintate and Elevation of Highway Junctu
10、re Point: Highway Grading and Surface Width3.3.2水運(yùn):航運(yùn)條件和最大船只噸位、吃水深度:現(xiàn)有碼頭的裝卸能力和駁船條件。Water Carriage: Freight Carrier Condition, Max. Vessel Tonnage, Sea Gauge Depth: Loading and Unloading Capacity of Exisiting Jetty and Barge Specification3.4相鄰地區(qū)情況Condition of Region in proximity3.4.1居民點(diǎn)的位置、影響和描述。Loca
11、tion, Impact and Descriptive Over-view of Local Resident Habitat3.4.2鄰近工業(yè)企業(yè)的位置、影響和環(huán)境衛(wèi)生方面的描述。Description of Location, Influence and environmental sanitation of Industrial plant in vicinity. 3.4.3當(dāng)?shù)剞r(nóng)業(yè)生產(chǎn)的情況描述及對(duì)本企業(yè)的影響。Description of Local Agricultural Production and Its Subsequent Implications on our En
12、terprise.3.5地表水Ground Surface Water3.5.1取水和排水地點(diǎn)的資料,如水岸情況、水深、流速等。Data of water Intake and Water Discharge Location, e.g.: water embankment condition, water depth, water flow velocity etc.3.5.2取水和航運(yùn)的關(guān)系。Relations between water intake and Shipment3.5.3取水和排水的關(guān)系。Relations between water intake and water di
13、scharge3.5.4化水和工業(yè)冷卻用水是否需要預(yù)處理Whether chemical water and industrial cooling water need pre-treatment 3.5.5循環(huán)冷卻水是開(kāi)式循環(huán)還是閉式循環(huán)Circulate cooling water is open circulation or closed circulation海水seawater3.5.6循環(huán)冷卻水采用海水開(kāi)式循環(huán)Circulation cooling water applies seawater open circulate 3.5.7化水和工業(yè)冷卻用水采用海水淡化Chemical
14、water and industrial cooling water applies seawater desalting 3.6施工條件Construction Condition3.6.1磚、瓦、砂、石、水泥、鋼材、木材的生產(chǎn)供應(yīng)情況,磚的規(guī)格。Supplying Specification of tile, brick, sand, stone, cement, steel materials, timber manufacturer, brick specification 3.6.2地方施工能力的評(píng)估,建筑機(jī)械條件;材料的存儲(chǔ)和堆放;大型施工機(jī)械的提供。Evaluation of I
15、ndigent Construction Capacity, Construction Mechanical Availabilities, Storage and Stacking of Materials, supplying conditionof large size construction machine 3.6.3勞動(dòng)力來(lái)源、人數(shù)和生活安排Labor Sources, Manpower and Living Arrangement3.6.4施工用水、點(diǎn)、通訊的來(lái)源;氧氣、乙炔氣的供給等。Sources of Construction using water, electricit
16、y, communication3.7建 筑Architecture3.7.1當(dāng)?shù)爻S玫慕ㄖ问?、結(jié)構(gòu)類型。Construction Method, Architecture Type commonly adopted locally3.7.2擴(kuò)建的必要性,可能性。Necessity, Possibility of Future Extension3.8風(fēng)荷載Wind load當(dāng)?shù)?0年一遇基本風(fēng)壓(按離地面10米高,自記10min平均最大風(fēng)速計(jì)算)。reference wind pressure for 50 years at site for intend (the maximum of
17、average wind velocity which get from leave ground 10 meter in 10 minutes, for 50 years)3.9地震作用Earthquake Function3.9.1計(jì)基準(zhǔn)期超越概率10的地震加速設(shè)計(jì)取值。 Base period adopts the design value that is probability 10% exceed earthquake acceleration. 3.9.2本地地震遠(yuǎn)近分組和場(chǎng)地土類別(或擬建場(chǎng)地地震影響系數(shù)特征周期)。The native earthquake distance t
18、o divide the set with the field ground soil category (or earthquake influence coefficient design characteristic period of ground motion at site for intend)3.10結(jié)構(gòu)要求Structure requirement 本地有無(wú)規(guī)定對(duì)結(jié)構(gòu)設(shè)計(jì)和荷載組合有特殊要求。Whether any local code requirement for structure design and load combination exists3.11勘探資料Reconnoitre data 擬建場(chǎng)地原位地質(zhì)詳細(xì)勘探資料。The un-situ tests geotechnical investigation report of site for intend to4化學(xué)專業(yè)Chemical Water Treatment Part4.1水質(zhì)全分析報(bào)告(見(jiàn)附件一)。Water Qual
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 職業(yè)健康檔案電子化自助查詢與報(bào)告生成系統(tǒng)
- 職業(yè)健康師資團(tuán)隊(duì)文化建設(shè)
- 駐馬店2025年河南駐馬店市確山縣遴選城區(qū)及街道辦事處學(xué)校教師教研員140人筆試歷年參考題庫(kù)附帶答案詳解
- 鎮(zhèn)江2025年江蘇鎮(zhèn)江揚(yáng)中市選調(diào)事業(yè)單位人員13人筆試歷年參考題庫(kù)附帶答案詳解
- 赤峰2025年內(nèi)蒙古赤峰市使用市直事業(yè)單位引進(jìn)企業(yè)急需緊缺高層次人才16人筆試歷年參考題庫(kù)附帶答案詳解
- 蕪湖安徽蕪湖經(jīng)濟(jì)技術(shù)開(kāi)發(fā)區(qū)招聘小學(xué)聘用教師62人筆試歷年參考題庫(kù)附帶答案詳解
- 溫州2025年下半年浙江溫州市市級(jí)事業(yè)單位選調(diào)16人筆試歷年參考題庫(kù)附帶答案詳解
- 畢節(jié)2025年貴州黔西市人民醫(yī)院招聘68人筆試歷年參考題庫(kù)附帶答案詳解
- 新疆2025年新疆生產(chǎn)建設(shè)兵團(tuán)第五師雙河市事業(yè)單位招聘127人筆試歷年參考題庫(kù)附帶答案詳解
- 忻州2025年山西原平市醫(yī)療集團(tuán)招聘41人筆試歷年參考題庫(kù)附帶答案詳解
- 生活垃圾填埋場(chǎng)環(huán)境污染的排查與治理方案
- 2023年食堂食用油著火演習(xí)方案
- 診斷癥狀學(xué):頭痛
- DB32/T 4399-2022 高層建筑工程抗震設(shè)防超限界定標(biāo)準(zhǔn)
- 做身心健康的陽(yáng)光好少年
- 教育培訓(xùn)市場(chǎng)的發(fā)展趨勢(shì)及機(jī)遇分析
- 2025年時(shí)事政治考試100題(含參考答案)
- 部隊(duì)禁酒課件
- 2025-2030年中國(guó)油套管產(chǎn)業(yè)規(guī)模分析及發(fā)展前景研究報(bào)告
- DB37-T 5318-2025 有機(jī)保溫板薄抹灰外墻外保溫系統(tǒng)應(yīng)用技術(shù)標(biāo)準(zhǔn)
- DB11-T 1811-2020 廚房、廁浴間防水技術(shù)規(guī)程
評(píng)論
0/150
提交評(píng)論