版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
土方開挖檢驗(yàn)批Soilexcavationengineeringqualityacceptancerecord(GB50202-2002)Table6.2.4No.:010101ProjectName:JinleHainingInternationalHomeFurnishingPlazaPhaseIIConstructionUnit:ZhejiangTiankeConstructionCo.,Ltd.ConstructionExecutionStandard:GB50202-2002SubcontractingUnit:N/ASubprojectName:Excavationoffoundationpitfromaxis6to17,supervisedbyNiZhenyu,thesoilprojectmanagerProfessionalForeman(ConstructionStaff):N/ASubcontractingProjectManager:ChenYongjiangConstructionTeamLeader:N/AQualityAcceptanceSpecificationRequirements(mm):InspectionItem:Pipe,ColumnFoundation,FoundationPit,FoundationTrench,Manual/MechanicalExcavation,Trench-50±30±50-50(ExcavationField)GroundLeveling:50(Ground/RoadSurface),BaseLayerConstructionUnitSelf-InspectionRecord,Supervision(Construction)UnitAcceptanceRecord:ControlItem:1.Elevation:Meetsdesignrequirements,Complete,Complete,LengthandWidth:+200+300+5002.(Measuredfromthedesigncenterline+100-50-100-150tobothsides)3.Slopedesignrequirements:20/20/50/20/20GeneralItem:2.BaseSoilProperties:SurfaceSmoothnessDesignRequirementsConstructionOperationBasis:QualityInspectionRecordConstructionUnitInspectionResultsEvaluation:QualifiedQualityInspector:TechnicalLeaderDate:2011Supervision(Construction)UnitAcceptanceConclusion:ProfessionalSupervisionEngineer:(ConstructionUnitProjectTechnicalLeader)Date:2009土方開挖工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄工程名稱:云川名都#地下室施工單位:浙江卡森建設(shè)有限公司分包單位:無分項(xiàng)工程名稱:土方開挖驗(yàn)收部位:基坑土方項(xiàng)目經(jīng)理:汪惠德專業(yè)工長:無分包項(xiàng)目經(jīng)理:周福平施工班組長:無施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002質(zhì)量驗(yàn)收規(guī)范的規(guī)定:表6.2.4編號(hào):010101質(zhì)量要求(mm):管:-50±30柱基:±50基坑:-50基槽:無人工機(jī)械:無溝:無挖方場(chǎng)地平整:無地(路)面基層:50質(zhì)量檢查項(xiàng)目:1.標(biāo)高:符合設(shè)計(jì)要求,完整,長度、寬度:+200+300+5002.邊坡設(shè)計(jì)要求:符合設(shè)計(jì)要求,一般3.基底土性:1)表面平整度設(shè)計(jì)要求:無施工單位自檢記錄、監(jiān)理(建設(shè))單位驗(yàn)收記錄主控項(xiàng)目:1.標(biāo)高:符合設(shè)計(jì)要求,完整,長度、寬度:+200+300+5002.邊坡設(shè)計(jì)要求:符合設(shè)計(jì)要求,一般3.基底土性:1)表面平整度設(shè)計(jì)要求:無質(zhì)量檢查員:無技術(shù)負(fù)責(zé)人:汪惠德專業(yè)監(jiān)理工程師:無監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:合格年月日:2010年監(jiān)理單位驗(yàn)收結(jié)論:土方開挖工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50202-2002)表6.2.4編號(hào):010101工程名稱:和平村車間施工單位:浙江中海建設(shè)有限公司分包單位:無分項(xiàng)工程名稱:土方開挖工程驗(yàn)收部位:基槽施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002專業(yè)工長(施工員):張其生分包項(xiàng)目經(jīng)理:無施工班組長:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:質(zhì)量要求(mm)檢查項(xiàng)目:管、柱基、基坑、基槽、人工機(jī)械、溝、地(路)面、基層質(zhì)量要求:-50±30±50-50施工單位自檢記錄、監(jiān)理單位驗(yàn)收記錄主控項(xiàng)目:1.標(biāo)高:符合設(shè)計(jì)要求,長度、寬度+200+300+5002.邊坡設(shè)計(jì)要求:符合設(shè)計(jì)要求一般項(xiàng)目:1.基底土性:表面平整度符合設(shè)計(jì)要求2.施工操作依據(jù)、質(zhì)量檢查記錄完整3.施工單位檢查結(jié)果評(píng)定合格4.項(xiàng)目專業(yè)質(zhì)量檢查員:技術(shù)負(fù)責(zé)人監(jiān)理單位驗(yàn)收結(jié)論:土方回填工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50202-2002)表6.3.4編號(hào):010102工程名稱:和平村車間施工單位:浙江中海建設(shè)有限公司分包單位:無分項(xiàng)工程名稱:土方回填工程驗(yàn)收部位:基槽施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002專業(yè)工長(施工員):張其生分包項(xiàng)目經(jīng)理:無施工班組長:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:質(zhì)量要求(mm)檢查項(xiàng)目:柱基、基坑、基槽、場(chǎng)地平整、人工機(jī)械、管、溝、地(路)面、基層質(zhì)量要求:-50施工單位自檢記錄、監(jiān)理單位驗(yàn)收記錄主控項(xiàng)目:1.標(biāo)高:分層壓實(shí)系數(shù)符合要求,回填土料分層厚度及含水量符合要求2.表面平整度符合設(shè)計(jì)要求一般項(xiàng)目:1.施工操作依據(jù)、質(zhì)量檢查記錄完整2.施工單位檢查結(jié)果評(píng)定合格3.項(xiàng)目專業(yè)質(zhì)量檢查員:技術(shù)負(fù)責(zé)人4.專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人)控項(xiàng)目地基平整度灰土厚度灰土質(zhì)量設(shè)計(jì)要求符合要求符合要求符合要求施工操作依據(jù)質(zhì)量檢查記錄項(xiàng)目專業(yè)項(xiàng)目專業(yè)質(zhì)量檢查員:技術(shù)負(fù)責(zé)人:2010年月日監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人)年月日表6.3.4編號(hào):010102工程名稱:海寧新真茂3#車間施工單位:海寧嘉業(yè)建設(shè)有限公司分包單位:無分項(xiàng)工程名稱:土方項(xiàng)目驗(yàn)收部位:柱基、基坑、基槽、場(chǎng)地平整、人工機(jī)械、管、溝、地(路)面、基層施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002施工項(xiàng)目經(jīng)理:沈海華專業(yè)工長(施工員):無分包項(xiàng)目經(jīng)理:宓根清施工班組長:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:質(zhì)量要求(mm)檢查項(xiàng)目:柱基、基坑、基槽、場(chǎng)地平整、人工機(jī)械、管、溝、地(路)面、基層符合要求:均符合要求設(shè)計(jì)要求:柱基、基坑、基槽、場(chǎng)地平整、人工機(jī)械、管、溝、地(路)面、基層均符合設(shè)計(jì)要求施工單位自檢記錄:有監(jiān)理(建設(shè))單位驗(yàn)收記錄:有主控項(xiàng)目:2項(xiàng)一般項(xiàng)目:無表7.5.6編號(hào):010207工程名稱:無施工單位:無分包單位:無分項(xiàng)工程名稱:鋼及混凝土支撐系統(tǒng)驗(yàn)收部位:圍囹標(biāo)高、立柱樁、立柱位置、平面、支撐位置、預(yù)加頂力施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002施工項(xiàng)目經(jīng)理:無專業(yè)工長(施工員):無分包項(xiàng)目經(jīng)理:無施工班組長:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:參見本規(guī)范第五章檢查項(xiàng)目:立柱樁、立柱位置、支撐位置、預(yù)加頂力、開挖超深、支撐安裝時(shí)間符合要求:立柱樁、立柱位置、支撐位置、預(yù)加頂力均符合要求設(shè)計(jì)要求:開挖超深不在此范圍施工單位自檢記錄:有監(jiān)理(建設(shè))單位驗(yàn)收記錄:有主控項(xiàng)目:2項(xiàng)一般項(xiàng)目:開挖超深、支撐安裝時(shí)間表4.2.4編號(hào):010301工程名稱:無施工單位:無分包單位:無分項(xiàng)工程名稱:灰土地基驗(yàn)收部位:地基平整度、灰土厚度、灰土質(zhì)量施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002施工項(xiàng)目經(jīng)理:無專業(yè)工長(施工員):無分包項(xiàng)目經(jīng)理:無施工班組長:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:無檢查項(xiàng)目:地基平整度、灰土厚度、灰土質(zhì)量符合要求:地基平整度、灰土厚度、灰土質(zhì)量均符合要求設(shè)計(jì)要求:無施工單位自檢記錄:有監(jiān)理(建設(shè))單位驗(yàn)收記錄:有主控項(xiàng)目:1項(xiàng)一般項(xiàng)目:無項(xiàng)目名稱:高豐地塊拆遷安置房#樓分項(xiàng)工程工程部位:基槽、砂石驗(yàn)收記錄編號(hào):010101、010302土方開挖工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄以下檢查項(xiàng)目符合設(shè)計(jì)要求:-地基承載力-配合比-壓實(shí)系數(shù)-石灰粒徑≤5mm質(zhì)量檢查記錄和監(jiān)理單位驗(yàn)收記錄均合格。砂和砂石地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄質(zhì)量檢查記錄顯示,所有檢查項(xiàng)目符合要求。施工單位自檢記錄和監(jiān)理單位驗(yàn)收記錄均合格。注意:原文中有很多格式錯(cuò)誤和明顯有問題的段落,已經(jīng)在改寫過程中刪除或修正。監(jiān)理單位驗(yàn)收記錄砂石料質(zhì)量驗(yàn)收記錄工程名稱:高豐地塊拆遷安置房127#樓分項(xiàng)工程名稱施工單位:浙江卡森建設(shè)有限公司施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào):GB50202-2002分包單位:無驗(yàn)收部位:基槽項(xiàng)目經(jīng)理:汪惠德專業(yè)工長(施工員):褚金彪分包項(xiàng)目經(jīng)理:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:符合GB50202-2002檢查項(xiàng)目:1.砂石料有機(jī)質(zhì)含量:≤5%2.砂石料含泥量:≤5%3.石料粒徑:般3項(xiàng)4.含水量(與最優(yōu)含水量比較):目5≤100mm5.分層厚度(與設(shè)計(jì)要求比較):2%≤50mm施工單位自檢記錄:符合要求監(jiān)理單位驗(yàn)收記錄:地基承載力符合設(shè)計(jì)要求配合比符合設(shè)計(jì)要求壓實(shí)系數(shù)符合設(shè)計(jì)要求結(jié)果評(píng)定:項(xiàng)目專業(yè):合格質(zhì)量檢查員:無技術(shù)負(fù)責(zé)人:2009年月日專業(yè)監(jiān)理工程師(建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人):年月日土工合成材料質(zhì)量驗(yàn)收記錄工程名稱:高豐地塊拆遷安置房127#樓分項(xiàng)工程名稱施工單位:浙江卡森建設(shè)有限公司施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào):GB50202-2002分包單位:無驗(yàn)收部位:無項(xiàng)目經(jīng)理:無專業(yè)工長(施工員):無分包項(xiàng)目經(jīng)理:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:符合GB50202-2002檢查項(xiàng)目:1.土工合成材料強(qiáng)度:≤5%2.土工合成材料延伸率:≤3%3.地基承載力符合設(shè)計(jì)要求4.土工合成材料搭接長度:≥300mm5.土石料有機(jī)質(zhì)含量:≤5%6.層面平整度:≤20mm7.每層鋪設(shè)厚度:25mm目4施工單位自檢記錄:符合要求監(jiān)理單位驗(yàn)收記錄:土工合成材料強(qiáng)度符合設(shè)計(jì)要求土工合成材料延伸率符合設(shè)計(jì)要求地基承載力符合設(shè)計(jì)要求土工合成材料搭接長度符合設(shè)計(jì)要求土石料有機(jī)質(zhì)含量符合設(shè)計(jì)要求層面平整度符合設(shè)計(jì)要求每層鋪設(shè)厚度符合設(shè)計(jì)要求結(jié)果評(píng)定:項(xiàng)目專業(yè):合格質(zhì)量檢查員:無技術(shù)負(fù)責(zé)人:2009年月日專業(yè)監(jiān)理工程師(建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人):年月日項(xiàng)目2砂樁直徑、長度符合設(shè)計(jì)要求3砂樁間距符合設(shè)計(jì)要求質(zhì)量要求施工單位自檢記錄監(jiān)理(建設(shè))單位驗(yàn)收記錄..一般項(xiàng)目1灌注深度符合設(shè)計(jì)要求2砂樁垂直度符合設(shè)計(jì)要求3灌注壓力符合設(shè)計(jì)要求4灌注速度符合設(shè)計(jì)要求施工操作依據(jù)質(zhì)量檢查記錄施工單位檢查結(jié)果評(píng)定項(xiàng)目專業(yè)項(xiàng)目專業(yè)質(zhì)量檢查員:技術(shù)負(fù)責(zé)人:年月日專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人)年月日監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論施工單位檢查結(jié)果評(píng)定項(xiàng)目專業(yè):粉煤灰地基質(zhì)量檢查員:技術(shù)負(fù)責(zé)人日期:年月日專業(yè)監(jiān)理工程師:建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人日期:年月日驗(yàn)收結(jié)論:編號(hào)為010304的粉煤灰地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄符合質(zhì)量驗(yàn)收規(guī)范的規(guī)定。檢查項(xiàng)目包括壓實(shí)系數(shù)和地基承載力是否符合設(shè)計(jì)要求。監(jiān)理(建設(shè))單位驗(yàn)收記錄也符合規(guī)范要求,檢查項(xiàng)目包括粉煤灰粒徑、氧化鋁及二氧化硅含量、燒失量、每層鋪筑厚度和含水量(與最優(yōu)含水量比較)。施工單位檢查結(jié)果評(píng)定項(xiàng)目專業(yè):強(qiáng)夯地基質(zhì)量檢查員:技術(shù)負(fù)責(zé)人日期:年月日專業(yè)監(jiān)理工程師:建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人日期:年月日驗(yàn)收結(jié)論:編號(hào)為010305的強(qiáng)夯地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄符合質(zhì)量驗(yàn)收規(guī)范的規(guī)定。檢查項(xiàng)目包括地基強(qiáng)度和地基承載力是否符合設(shè)計(jì)要求。施工單位自檢記錄和監(jiān)理(建設(shè))單位驗(yàn)收記錄也符合規(guī)范要求,檢查項(xiàng)目包括夯錘落距、錘重、夯擊遍數(shù)及順序、夯點(diǎn)間距、夯擊范圍和前后兩遍間歇時(shí)間是否符合設(shè)計(jì)要求。施工單位檢查結(jié)果評(píng)定項(xiàng)目專業(yè):砂樁地基質(zhì)量檢查員:技術(shù)負(fù)責(zé)人日期:年月日專業(yè)監(jiān)理工程師:建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人日期:年月日驗(yàn)收結(jié)論:編號(hào)為010307的砂樁地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄符合質(zhì)量驗(yàn)收規(guī)范的規(guī)定。檢查項(xiàng)目包括灌砂量、砂樁直徑和長度、砂樁間距、灌注深度、砂樁垂直度、灌注壓力和灌注速度是否符合設(shè)計(jì)要求。施工單位自檢記錄和監(jiān)理(建設(shè))單位驗(yàn)收記錄也符合規(guī)范要求。項(xiàng)2:地基強(qiáng)度符合設(shè)計(jì)要求,質(zhì)量要求≥95%。監(jiān)理(建設(shè))單位驗(yàn)收記錄。地基強(qiáng)度符合設(shè)計(jì)要求,質(zhì)量要求達(dá)到95%以上,監(jiān)理(建設(shè))單位驗(yàn)收記錄。目3:地基承載力符合設(shè)計(jì)要求,考慮砂料的含泥量、有機(jī)質(zhì)含量、樁位、砂樁標(biāo)高、垂直度等因素,施工操作依據(jù)質(zhì)量檢查記錄。結(jié)果評(píng)定≤3%。地基承載力符合設(shè)計(jì)要求,考慮砂料的含泥量、有機(jī)質(zhì)含量、樁位、砂樁標(biāo)高、垂直度等因素,施工操作依據(jù)質(zhì)量檢查記錄。結(jié)果評(píng)定不超過3%。注漿地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50202-2002)表4.7.4編號(hào):010311工程名稱、施工單位、施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào)、分包單位、分項(xiàng)工程名稱、驗(yàn)收部位、項(xiàng)目經(jīng)理、專業(yè)工長(施工員)、施工班組長、分包項(xiàng)目經(jīng)理、質(zhì)量驗(yàn)收規(guī)范的規(guī)定、檢查項(xiàng)目、原材料、控制料、水泥符合設(shè)計(jì)要求、注粒徑小于2.5mm、漿細(xì)度模數(shù)小于2.0、砂含泥量及有機(jī)物含量不超過3%、注塑性指數(shù)大于14等。施工單位自檢記錄和監(jiān)理(建設(shè))單位驗(yàn)收記錄。水泥粉煤灰碎石樁復(fù)合地基檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50202-2002)表4.13.4編號(hào):010312工程名稱、施工單位、施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào)、分包單位、分項(xiàng)工程名稱、驗(yàn)收部位、項(xiàng)目經(jīng)理、專業(yè)工長(施工員)、施工班組長、分包項(xiàng)目經(jīng)理、施工單位自檢記錄、質(zhì)量驗(yàn)收規(guī)范的規(guī)定、檢查項(xiàng)目、原材料符合設(shè)計(jì)要求、樁徑誤差不超過20mm、樁身強(qiáng)度符合設(shè)計(jì)要求、地基承載力符合設(shè)計(jì)要求、樁身完整性按樁基檢測(cè)技術(shù)規(guī)范、樁位偏差、樁垂直度、樁長、褥墊層夯填度等。監(jiān)理(建設(shè))單位驗(yàn)收記錄。施工操作依據(jù)、質(zhì)量檢查記錄和施工單位檢查結(jié)果評(píng)定是施工質(zhì)量的重要依據(jù)。滿堂布樁和條基布樁的要求分別是主樁徑≤0.40D和≤0.25D,以及垂直度≤1.5%和機(jī)頭提升速度偏差≤0.9。在驗(yàn)收記錄中,需要檢查樁長、樁體干密度、地基承載力、土料有機(jī)質(zhì)含量、含水量、土料粒徑、水泥質(zhì)量、樁位偏差、樁孔垂直度和褥墊層夯填度等項(xiàng)目。專業(yè)監(jiān)理工程師和技術(shù)負(fù)責(zé)人需要對(duì)質(zhì)量檢查記錄和施工單位檢查結(jié)果進(jìn)行評(píng)定,并根據(jù)設(shè)計(jì)要求和參數(shù)指標(biāo)進(jìn)行驗(yàn)收結(jié)論。混凝土灌注樁鋼筋籠檢驗(yàn)批質(zhì)量驗(yàn)收記錄編號(hào):010405工程名稱:金鷺、海寧國際家居廣場(chǎng)二期施工單位:杭州華成地基基礎(chǔ)工程有限公司分包單位:無施工執(zhí)行標(biāo)準(zhǔn):建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范(GB50007-2002)分項(xiàng)工程名稱:樁基驗(yàn)收部位:樁基樁號(hào):無項(xiàng)目經(jīng)理:陳鋼專業(yè)工長:許利明施工員:無施工班組長:許利明分包項(xiàng)目經(jīng)理:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:主控項(xiàng)目:1.主筋間距:±10mm2.長度:±100mm一般項(xiàng)目:1.箍筋間距:±20mm2.直徑:±10mm質(zhì)量要求:符合設(shè)計(jì)要求施工單位自檢記錄:完整監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:合格混凝土灌注樁檢驗(yàn)批質(zhì)量驗(yàn)收記錄編號(hào):010405工程名稱:金鷺、海寧國際家居廣場(chǎng)二期施工單位:杭州華成地基基礎(chǔ)工程有限公司分包單位:無施工執(zhí)行標(biāo)準(zhǔn):建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范(GB50007-2002)分項(xiàng)工程名稱:樁基驗(yàn)收部位:樁基樁號(hào):無項(xiàng)目經(jīng)理:陳鋼專業(yè)工長:許利明施工員:無施工班組長:許利明分包項(xiàng)目經(jīng)理:無質(zhì)量驗(yàn)收規(guī)范的規(guī)定:主控項(xiàng)目:1.樁位偏差:+300mm2.孔深偏差:符合要求3.樁體質(zhì)量檢驗(yàn):符合要求4.混凝土強(qiáng)度:符合要求5.承載力:符合要求6.樁垂直度:符合要求7.樁徑:符合要求一般項(xiàng)目:1.泥漿比重(粘土或砂性土中):1.15~1.202.泥漿面標(biāo)高(高于地下水位):≤50mm3.沉渣厚度:≤150mm4.混凝土坍落度:0.5~1.0m5.端承樁:按基樁檢測(cè)技術(shù)規(guī)范。如鉆芯取樣,大直徑嵌巖樁應(yīng)鉆至樁尖下50cm6.摩擦樁:見規(guī)范表5.1.47.水下灌注:見規(guī)范表5.1.4質(zhì)量要求:符合要求施工單位自檢記錄:完整監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:合格防水混凝土工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄編號(hào):010501工程名稱:(填寫)施工單位:(填寫)分包單位:(填寫)分項(xiàng)工程名稱:(填寫)驗(yàn)收部位:(填寫)項(xiàng)目經(jīng)理:(填寫)專業(yè)工長:(填寫)施工員:(填寫)分包項(xiàng)目經(jīng)理:(填寫)施工班組長:(填寫)施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào):(填寫)檢查項(xiàng)目:1.防水混凝土的原材料、配合比及坍落度必須符合設(shè)計(jì)要求。2.防水混凝土的抗壓強(qiáng)度和抗?jié)B壓力必須符合設(shè)計(jì)要求。3.防水混凝土的變形縫、施工縫、后澆帶、穿墻管道、埋設(shè)件等設(shè)置和構(gòu)造,均須符合設(shè)計(jì)要求,嚴(yán)禁有滲漏。4.防水混凝土結(jié)構(gòu)表面應(yīng)堅(jiān)實(shí)、平整,不得有露筋、蜂窩等缺陷,埋設(shè)件位置應(yīng)正確。防水混凝土結(jié)構(gòu)表面的裂縫寬度不應(yīng)大于0.2mm,并不得貫通。防水混凝土結(jié)構(gòu)厚度不應(yīng)小于250mm。迎水面鋼筋保護(hù)層厚度不應(yīng)小于50mm。質(zhì)量要求:按照GB50208-20024.1.7條、4.1.8條、4.1.9條、4.1.10條的規(guī)定。施工單位自檢記錄:符合要求。質(zhì)量檢查記錄:監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:合格。項(xiàng)目專業(yè)項(xiàng)目專業(yè)質(zhì)量檢查員:(填寫)技術(shù)負(fù)責(zé)人:(填寫)專業(yè)監(jiān)理工程師:(填寫)(建設(shè)單位項(xiàng)目專業(yè)負(fù)責(zé)人):(填寫)年月日:(填寫)監(jiān)理(建設(shè))單位驗(yàn)收記錄一般項(xiàng)目水泥砂漿防水層表面應(yīng)平整、密實(shí),不得有裂紋、起砂或麻面等缺陷。陰陽角處應(yīng)做成圓弧形。(4.2.9條)水泥砂漿防水層施工縫留槎位置應(yīng)正確,接槎應(yīng)按層次順序操作,層層搭接緊密。(4.2.10條)水泥砂漿防水層的平均厚度應(yīng)符合設(shè)計(jì)要求,最小厚度不得小于設(shè)計(jì)值的85%。(4.2.11條)施工單位自檢記錄質(zhì)量檢查記錄:符合要求符合要求符合要求監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:項(xiàng)目專業(yè):技術(shù)負(fù)責(zé)人:年月日專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人)年月日涂料防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50208-2002)表4.4編號(hào):010504工程名稱:金鷺·海寧國家居廣場(chǎng)二期施工單位:浙江天科建設(shè)有限公司分項(xiàng)工程名稱:涂料防水層驗(yàn)收部位:項(xiàng)目經(jīng)理倪震宇地下室外墻軸施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào):GB50208-2002分包單位:無分包項(xiàng)目經(jīng)理:無專業(yè)工長(施工員):陳永江主控項(xiàng)目:涂料防水層所用材料及配合比必須符合設(shè)計(jì)要求。(4.4.7條)涂料防水層及其轉(zhuǎn)角處、變形縫等細(xì)部做法均須符合設(shè)計(jì)要求。(4.4.8條)基層應(yīng)牢固、基面應(yīng)潔凈、平整,不得有空鼓等現(xiàn)象;基層陰陽角處應(yīng)做成圓弧形。(4.4.9條)防水層應(yīng)與基層粘結(jié)牢固,表面平整,涂刷均勻,不得有流淌、皺折等缺陷。(4.4.10條)平均厚度應(yīng)符合設(shè)計(jì)要求,最小厚度不得小于設(shè)計(jì)的80%。(4.4.11條)保護(hù)層與防水層粘結(jié)牢固,結(jié)合緊密,厚度均勻一致。(4.4.12條)施工單位自檢記錄質(zhì)量檢查記錄:符合要求符合要求符合要求符合要求符合要求符合要求監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:項(xiàng)目專業(yè):技術(shù)負(fù)責(zé)人:年月日專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人)年月日卷材防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄(GB50208-2002)表4.3編號(hào):010503工程名稱:金鷺·海寧國家居廣場(chǎng)二期施工單位:浙江天科建設(shè)有限公司分項(xiàng)工程名稱:卷材防水層驗(yàn)收部位:項(xiàng)目經(jīng)理施工執(zhí)行標(biāo)準(zhǔn)名稱及編號(hào):GB50208-2002分包單位:無分包項(xiàng)目經(jīng)理:無專業(yè)工長:無主控項(xiàng)目:卷材防水層應(yīng)符合設(shè)計(jì)要求,其鋪設(shè)應(yīng)整齊、平直,不得有皺折、翹起等現(xiàn)象。(4.3.5條)卷材防水層應(yīng)與基層粘結(jié)牢固,表面平整,不得有流淌、皺折等缺陷。(4.3.6條)卷材防水層的平均厚度應(yīng)符合設(shè)計(jì)要求,最小厚度不得小于設(shè)計(jì)值的80%。(4.3.7條)施工單位自檢記錄質(zhì)量檢查記錄:符合要求符合要求符合要求監(jiān)理(建設(shè))單位驗(yàn)收結(jié)論:項(xiàng)目專業(yè):技術(shù)負(fù)責(zé)人:年月日專業(yè)監(jiān)理工程師:(建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人)年月日施工班組長應(yīng)按照規(guī)定進(jìn)行分包項(xiàng)目管理。施工單位必須遵守質(zhì)量驗(yàn)收規(guī)范,記錄自檢結(jié)果。在卷材搭接方面,允許偏差為-10mm。卷材防水層和其配套材料必須符合設(shè)計(jì)要求,并且細(xì)部做法也必須遵守設(shè)計(jì)要求。基層應(yīng)當(dāng)牢固,基面應(yīng)當(dāng)平整,陰陽角處應(yīng)做成圓弧。搭接縫應(yīng)該粘牢,不得有皺折、翹邊和鼓泡。側(cè)墻卷材防水層的保護(hù)層和防水層應(yīng)該粘結(jié)牢固,結(jié)合緊密,厚度均勻一致。金屬板防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄中,金屬板表面不得有明顯凹面和損傷,焊縫不得有裂紋、未熔合、夾渣、焊瘤等缺陷。焊波應(yīng)該均勻,焊渣和飛濺物應(yīng)該清除干凈;保護(hù)涂層不得有漏涂、脫皮和返銹現(xiàn)象。細(xì)部構(gòu)造所用止水帶等材料必須符合設(shè)計(jì)要求,嚴(yán)禁有滲漏。施工單位應(yīng)該進(jìn)行自檢并記錄結(jié)果,監(jiān)理單位應(yīng)進(jìn)行驗(yàn)收結(jié)論。細(xì)部構(gòu)造包括變形縫、施工縫、后澆帶等,必須符合設(shè)計(jì)要求。在中埋式止水帶的施工中,止水帶的中心線應(yīng)與變形縫中心線重合,同時(shí)止水帶必須固定平直,不能出現(xiàn)扭曲現(xiàn)象。穿墻管止水環(huán)與主管或翼環(huán)與套管的連接必須連續(xù)滿焊,并進(jìn)行防腐處理。在接縫處,混凝土表面應(yīng)該密實(shí)、潔凈、干燥;密封材料應(yīng)該嵌填嚴(yán)密、粘結(jié)牢固,不能出現(xiàn)開裂等現(xiàn)象。針對(duì)先張法預(yù)應(yīng)力管樁的檢驗(yàn)批質(zhì)量驗(yàn)收記錄,需要按照GB50202-2002的規(guī)定進(jìn)行檢驗(yàn)。在檢查樁體質(zhì)量時(shí),施工單位需要自行記錄,并由監(jiān)理(建設(shè))單位進(jìn)行驗(yàn)收記錄。驗(yàn)收部位為樁基,需要滿足一定的質(zhì)量要求,如樁沿基礎(chǔ)梁中心線的偏差、承載力等。同時(shí)也需要檢查樁體的外觀成品質(zhì)量,包括樁徑、管壁厚度、樁尖中心線、頂面平整度、樁體彎曲、焊縫質(zhì)量等。在施工過程中,需要依據(jù)執(zhí)行標(biāo)準(zhǔn)GB50202-2002進(jìn)行操作,同時(shí)施工單位需要進(jìn)行自檢記錄,由專業(yè)監(jiān)理工程師進(jìn)行評(píng)定。最終,由建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人進(jìn)行監(jiān)理驗(yàn)收結(jié)論。質(zhì)量檢查員:技術(shù)負(fù)責(zé)人:年月日監(jiān)理單位驗(yàn)收結(jié)論專業(yè)監(jiān)理工程師:建設(shè)單位項(xiàng)目專業(yè)技術(shù)負(fù)責(zé)人:年月日鋼筋混凝土預(yù)制樁檢驗(yàn)批質(zhì)量驗(yàn)收記錄工程名稱:金鷺、海寧國際家居廣場(chǎng)二期施工單位:杭州華成地基基礎(chǔ)工程有限公司施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002表5.4.5名稱及編號(hào):010403分包單位:無分項(xiàng)工程名稱:無驗(yàn)收部位:樁體質(zhì)量檢驗(yàn)項(xiàng)目經(jīng)理:無專業(yè)工長:無施工員:無施工班組長:無分包項(xiàng)目經(jīng)理:無質(zhì)量要求:?jiǎn)挝粩?shù)值按基樁檢測(cè)技術(shù)規(guī)范和質(zhì)量驗(yàn)收規(guī)范的規(guī)定檢查項(xiàng)目:1.樁體質(zhì)量檢驗(yàn)2.承載力按基樁檢測(cè)技術(shù)規(guī)范3.成品樁外形設(shè)計(jì)要求4.砂、石、水泥、鋼材質(zhì)量(現(xiàn)場(chǎng)預(yù)制時(shí))5.成品樁裂縫(收縮或起吊、裝運(yùn)、堆放引起的裂縫)6.成品樁尺寸7.焊縫質(zhì)量8.電焊接樁注:H為施工現(xiàn)場(chǎng)地面標(biāo)高與樁頂設(shè)計(jì)標(biāo)高的距離。樁位:1.樁沿基礎(chǔ)梁中心線mm100+0.01H蓋有基礎(chǔ)垂直基礎(chǔ)梁中心線2.樁沿基礎(chǔ)梁中心線mm150+0.01H位于梁的樁3.樁數(shù)為1~3根樁基中的樁mm100允許偏差4.樁數(shù)為4~16根樁基中的樁1/2樁徑或邊長5.最外邊的樁1/3樁徑或邊長6.根樁基中的樁中間樁1/2樁徑或邊長(mm)質(zhì)量驗(yàn)收記錄:1.表面平整、顏色均勻,掉角深度<10mm,蜂窩面積<總面積0.5%2.深度<20mm,寬度<0.25mm,橫向不超過邊長的1/23.mm<104.mm<105.mm<1/1000l6.mm<27.見規(guī)范表5.5.4-28.min>1.09.mm<1010.mm<1/1000l11.min12.min13.mm設(shè)計(jì)要求:<2,>7,±50施工操作依據(jù):無質(zhì)量檢查記錄:施工單位自檢記錄監(jiān)理單位驗(yàn)收記錄:無項(xiàng)目專業(yè)項(xiàng)目專業(yè)質(zhì)量質(zhì)量檢查員:技術(shù)負(fù)責(zé)人:年月日監(jiān)理單位驗(yàn)收結(jié)論:合格錨桿靜力壓樁及靜力壓樁檢驗(yàn)批質(zhì)量驗(yàn)收記錄工程名稱:金鷺、海寧國際家居廣場(chǎng)二期施工單位:杭州華成地基基礎(chǔ)工程有限公司施工執(zhí)行標(biāo)準(zhǔn):GB50202-2002表5.2.5名稱及編號(hào):010401分包單位:無分項(xiàng)工程名稱:無驗(yàn)收部位:錨桿靜力壓樁及靜力壓樁檢驗(yàn)批質(zhì)量驗(yàn)收記錄項(xiàng)目經(jīng)理:無專業(yè)工長:無施工員:無施工班組長:無分包項(xiàng)目經(jīng)理:無質(zhì)量要求:?jiǎn)挝粩?shù)值按基樁檢測(cè)技術(shù)規(guī)范和質(zhì)量驗(yàn)收規(guī)范的規(guī)定檢查項(xiàng)目:1.錨桿靜力壓樁2.靜力壓樁質(zhì)量驗(yàn)收記錄:1.錨桿靜力壓樁的錨桿直徑、長度、數(shù)量、埋置深度、錨固長度、錨固方式、錨固位置、錨固力、錨固點(diǎn)混凝土強(qiáng)度等符合設(shè)計(jì)要求2.靜力壓樁的樁長、樁徑、樁數(shù)、錘擊次數(shù)、樁長損失、樁側(cè)摩阻力、樁端摩阻力、樁側(cè)阻力等符合設(shè)計(jì)要求施工操作依據(jù):無質(zhì)量檢查記錄:施工單位自檢記錄監(jiān)理單位驗(yàn)收記錄:無項(xiàng)目專業(yè)項(xiàng)目專業(yè)質(zhì)量檢查員:技術(shù)負(fù)責(zé)人:年月日監(jiān)理單位驗(yàn)收結(jié)論:合格礎(chǔ)梁的樁,施工單位自檢記錄符合要求。監(jiān)理單位驗(yàn)收記錄:垂直基礎(chǔ)梁中心線為100+0.01Hmm,樁沿基礎(chǔ)梁中心線為150+0.01Hmm。樁數(shù)為1-3根樁基中的樁,中間樁偏差控制在2mm以內(nèi);樁數(shù)為4-16根樁基中的樁,偏差控制在1/2樁徑或邊長以內(nèi);樁數(shù)大于16根樁基中的樁,最外邊的樁偏差控制在1/3樁徑或邊長以內(nèi)。2成品樁質(zhì)量:承載力、外觀、外形尺寸、強(qiáng)度等均符合按基樁檢測(cè)技術(shù)規(guī)范的要求。表面平整、顏色均勻,掉角深度小于10mm,蜂窩面積小于總面積的0.5%。滿足設(shè)計(jì)要求,具體數(shù)值見本規(guī)范表5.4-2。3一般檢查項(xiàng)目:硫磺膠泥質(zhì)量符合要求;焊縫質(zhì)量、電焊接樁電焊結(jié)束后停歇時(shí)間、硫磺膠泥接樁膠泥澆注時(shí)間、澆注后停歇時(shí)間、電焊條質(zhì)量、壓樁壓力、接樁時(shí)上下節(jié)平面偏差、接樁時(shí)節(jié)點(diǎn)彎曲矢高、樁頂標(biāo)高等均符合要求。施工操作依據(jù)完整,質(zhì)量檢查記錄完整。施工單位檢查項(xiàng)目專業(yè)項(xiàng)目專業(yè)結(jié)果評(píng)定:質(zhì)量檢查員、技術(shù)負(fù)責(zé)人均認(rèn)為符合要求。4靜力壓樁檢驗(yàn)批質(zhì)量驗(yàn)收記錄編號(hào)為010401,工程名稱為金鷺、海寧國際家居廣場(chǎng)二期,施工單位為杭州華成地基基礎(chǔ)工程有限公司,施工執(zhí)行標(biāo)準(zhǔn)為建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范(GB50007-2002),分包單位為未提及?;A(chǔ)梁樁施工記錄:施工單位自檢記錄:所有樁符合要求。監(jiān)理單位驗(yàn)收記錄
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026上海人保財(cái)險(xiǎn)校園招聘?jìng)淇碱}庫及答案詳解一套
- 2026河南平煤神馬人力資源有限公司招聘96人備考題庫及1套完整答案詳解
- 2026年上半年黑龍江東方學(xué)院師資補(bǔ)充計(jì)劃招聘27人備考題庫及答案詳解一套
- 2026北京海淀區(qū)信息管理學(xué)校招聘2人備考題庫及答案詳解(奪冠系列)
- 2025福建廈門市翔發(fā)集團(tuán)有限公司招聘3人備考題庫(第三期)完整答案詳解
- 2026吉林省長春市吉林大學(xué)白求恩第一醫(yī)院病人服務(wù)中心陪檢員招聘?jìng)淇碱}庫有答案詳解
- 2025江蘇揚(yáng)州南科能源再生有限公司招聘勞務(wù)派遣工作人員1人備考題庫完整答案詳解
- 2026廣東茂名職業(yè)技術(shù)學(xué)院招聘教師20人備考題庫帶答案詳解
- 面包生產(chǎn)車間規(guī)章制度
- 生產(chǎn)力進(jìn)步制度
- 裝配式建筑可行性研究報(bào)告
- 跨境電子商務(wù)教案
- 新人教部編版一年級(jí)下冊(cè)生字表全冊(cè)描紅字帖可打印
- 中國的“愛經(jīng)”(一)-《天地陰陽交⊥歡大樂賦》
- 中學(xué)保安工作管理制度
- 廣元市利州區(qū)何家坪石材廠飾面用灰?guī)r礦礦山地質(zhì)環(huán)境保護(hù)與土地復(fù)墾方案
- 保健按摩師初級(jí)試題
- 2021年度四川省專業(yè)技術(shù)人員繼續(xù)教育公需科目(答案整合)
- 醫(yī)療廢物處理方案
- 船舶靠離泊作業(yè)風(fēng)險(xiǎn)辨識(shí)表
- DB37T 2673-2019醫(yī)療機(jī)構(gòu)能源消耗定額標(biāo)準(zhǔn)
評(píng)論
0/150
提交評(píng)論