版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
本科生畢業(yè)設(shè)計(jì)(論文)題目:朱集煤礦0.9Mt/a新井設(shè)計(jì) 煤礦井下無軌膠輪車的運(yùn)用現(xiàn)狀及發(fā)展趨勢(shì)摘要一般部分針對(duì)淮南朱集礦井進(jìn)行了井型為0.9Mt/a的新井設(shè)計(jì)。朱集礦井位于安徽省淮南市境內(nèi),井田走向長(zhǎng)約7.0km,傾向長(zhǎng)約3.0km,面積約21km2。主采煤層為13-1#煤層,平均傾角2~5°,平均厚度4m。井田工業(yè)儲(chǔ)量為113.12Mt,可采儲(chǔ)量53.09Mt,礦井服務(wù)年限為42.1a。礦井正常涌水量為342m3/h,最大涌水量為462m3/h;礦井相對(duì)瓦斯涌出量為10.3m3/t,屬高瓦斯礦井。根據(jù)井田地質(zhì)條件,設(shè)計(jì)采用雙立井單水平開拓方式,井田采用全帶區(qū)式布置方式,共劃分為八個(gè)帶區(qū),兩個(gè)盤區(qū),軌道大巷、膠帶機(jī)大巷和回風(fēng)大巷皆為巖石大巷,布置在13-1#煤層底板巖層中。考慮到本礦井為高瓦斯礦井,礦井通風(fēng)方式采用兩翼對(duì)角式通風(fēng),并在開采前預(yù)掘底板瓦斯抽排巷進(jìn)行瓦斯提前卸壓抽放。針對(duì)東一帶區(qū)采用了帶區(qū)準(zhǔn)備方式,共劃分7個(gè)分帶工作面,并進(jìn)行了運(yùn)煤、通風(fēng)、運(yùn)料、排矸、供電系統(tǒng)設(shè)計(jì)。針對(duì)13101工作面進(jìn)行了采煤工藝設(shè)計(jì)。該工作面煤層平均厚度為4.0m,平均傾角3°,直接頂為泥巖,老頂為細(xì)砂巖。工作面采用長(zhǎng)壁綜采一次采全高采煤法。采用雙滾筒采煤機(jī)割煤,往返一次割兩刀。采用“三八制”工作制度,兩班半生產(chǎn),半班檢修,截深0.8m,每天5個(gè)循環(huán),循環(huán)進(jìn)尺4.0m,月推進(jìn)度120m。大巷采用膠帶輸送機(jī)運(yùn)煤,輔助運(yùn)輸采用蓄電池式電機(jī)車牽引固定箱式礦車。主井采用兩套帶平衡錘的16t箕斗提煤,副井采用一對(duì)1.5t礦車雙層四車窄罐籠和一個(gè)帶平衡錘的1.5t礦車雙層四車寬罐籠運(yùn)料和升降人員。專題部分題目為《國(guó)內(nèi)外無軌膠輪車的運(yùn)用現(xiàn)狀及發(fā)展趨勢(shì)》,結(jié)合在神東礦區(qū)、濟(jì)三礦的運(yùn)用,介紹了無軌膠輪車的性能特點(diǎn),運(yùn)用現(xiàn)狀,主要車型,以及國(guó)產(chǎn)化進(jìn)程,最后展望無軌膠輪車的發(fā)展趨勢(shì)。翻譯部分題目為《Anewcoalpillarsdesignmethodinordertoenhancesafetyoftheretreatmininginroomandpillarsmines》,主要介紹了一種在利用房柱式開采時(shí),可以提高煤柱安全性的煤柱設(shè)計(jì)方法。關(guān)鍵詞:朱集煤礦;雙立井;帶區(qū)布置;兩翼對(duì)角式;綜采;沿空留巷;無軌膠輪車ABSTRACTThegeneraldesignisabouta0.9Mt/anewundergroundminedesignofZhujicoalmine.ZhujicoalmineislocatedinHuainan,Anhuiprovince.It’sabout7.0kmonthestrikeand3.2kmonthedip,withthe21.0km2totalhorizontalarea.Theminablecoalseamis13-1#withanaveragethicknessof4.0mandanaveragedipof3°.Theprovedreservesofthiscoalmineare113.12Mtandtheminablereservesare53.09Mt,withaminelifeof42.1a.Thenormalmineinflowis342m3/handthemaximummineinflowis462m3/h.Theminegasemissionrateis10.3m3/t,whichcanberecognizedashighgasmine.Basedonthegeologicalconditionofthemine,thisdesignusesaduel-verticalshaftsingle-leveldevelopmentmethod,andfullstrippreparation,whichdividedintoeightbandsandtwodistricts,andtrackroadway,beltconveyorroadwayandreturnairwayareallrockroadways,arrangedinthefloorrockof13-1#coalseam.Takingintoaccountofthehighgasemission,mineventilationmethodusetwodiagonalwingsventilation,andexcavesbottomgasdrainageroadwaybeforeminingtoreliefgaspressureinadvance.ThedesignappliesstrippreparationagainstthefirstbandofEastOnewhichdividedinto5stirpstotally,andconductedcoalconveyance,ventilation,gangueconveyanceandelectricitydesigning.Thedesignconductedcoalminingtechnologydesignagainstthe13101face.Thecoalseamaveragethicknessofthisworkingfaceis4.0mandtheaveragedipis3°,theimmediateroofismudstoneandthemainroofissandstone.Theworkingfaceappliesfullymechanizedlongwallfull-heightcoalcavingmethod,andusesdoubledrumshearercuttingcoalwhichcutstwiceeachworkingcycle."Three-Eight"workingsystemhasbeenusedinthisdesignandthedepth-webis0.8mwithfiveworkingcyclesperday,andtheadvanceofaworkingcycleis4.0mandtheadvanceis120mpermonth.Mainroadwaymakesuseofbeltconveyortotransportcoalresource,andbatterylocomotivetobeassistanttransport.Themainshaftusesdouble16tskipstoliftcoalwithabalancehammerandtheauxiliaryshaftusesatwinsnarrow1.5tfour-cardouble-deckcageandawide1.5tfour-cardouble-deckcagetoliftmaterialandpersonneltransportation.Theprojectsectionon"theuseofthetracklessrubber_tyredcarathomeandabroadpresentsituationanddevelopingtrend",IncombinationwiththeapplicationinShenDongminingarea,JiSanMine,thispaperintroducestheperformancecharacteristicsoftracklessrubber_tyredcar,usingsituation,mainmodels,andthelocalizationprocessandthefuturedevelopmenttrendoftracklessrubber_tyredcar.Thetitleofthetranslatedacademicpaperis"Anewcoalpillarsdesignmethodinordertoenhancesafetyoftheretreatmininginroomandpillarsmines".Mainlyintroducesanewtypeofroomandpillarmining,canimprovethesafetyofcoalpillarcoalpillardesignmethod.Keywords:Zhujicoalmine;doubleverticalshaft;bandmode;twodiagonalwingsventilation;comprehensivemechanizedmining;gob-sideentryretaining;tracklessrubber_tyredcar 第頁(yè)英文原文AnewcoalpillarsdesignmethodinordertoenhancesafetyoftheretreatmininginroomandpillarsminesE.Ghasemi*,K.ShahriarDepartmentofMiningofandMetallurgicalEngineering,AmirkabirUniversityofTechnology,Tehran,IranAbstract:Mostoftheproposedmethodsofcoalpillardesigndeterminepillardimensionsusingpillarestimationonlythroughthetributaryareatheory.Designingpillarbasedonthesemethodsisnotappropriateinroomandpillarmineswithpillarrecoverybecauseretreatminingandgobcreationgenerateabutmentloads.Neglectingabutmentloadsindesignstagemayleadtopillarfailureanddestructiveeffectsduringretreatmining.Thusproperpillardesignhasaremarkableeffectonminingeffectonminingsafety.Inthispaper,astep-bu-stepmethodispresentedtodesignpillarswithsquareshapeinroomandpillarmineswithregardtoexistingpillarsintheactiveminingzone(AMZ)andestimatingabutmentloadsaccordingtoexperiment-method.ThismethodhasbeenappliedtodetermineoptimumpillardimensionsinthemainpanelofTabasCentalMine(TCM),locatedinthemid-easternpartofIran.Obtainedresultsshowtheabutmentloadsaccountfor27%ofthetotalloadsappliedonpillarsinAMZinthispanel.Pillarwidth,basedonthismethod,isalsoobtained11.6m.Keywords:Pillardesign;Roomandpillar;Retreatmining;Activeminingzone;AbutmentloadsIntroductionInundergroundcoalmining,roomandpillaristhemethodofworkingpreferableforflat,tabulardepositsinthinseams,whereroomsofentriesaredriveninthesolidcoaltoformpillarsinthedevelopmentpanels(Hustrulid,1982;Hartman,1978).Pillarsofcoalareleftbehindtosupporttheroofandpreventitscollapse,therebyallowingminerstoextractcoalbetweenthemandtotravelsafely.Insomecases,thepillarsareremovedpartlyorfullyinalateroperation,knownasretreatmining(alsoknownassecondaryminingorpillarrecoveryoperation).Coalminepillardesignhasbeenthesubjectofsustainedandintensiveresearchinthemajorcoalproducingcountriesintheword.Pillardesignandstabilityaretwoofthemostcomplicatedandextensiveproblemsinminingrelatedtorockmechanicsandgroundcontrolsubjects.Althoughtheseproblemshavebeeninvestigatedforalongtime,todateonlyalimitedunderstandingofthesubjecthasbeengained.ThesubjectofpillardesignintheUSgoesbacknearlyacentry.Priortothisthedimensionsofpillarwerelargelydeterminedrulesofthumbsuchresearchastherewastendedtobeisolatedandsporadic.Butnowadays,variouspillardesignformulasaredeveloped,baseduponlaboratorytesting,full-scalepillartesting,andback-analysisoffailedandsuccessfulcasehistories.In1980,fieldstudiesconductedbytheUSBureauofMineshasdevelopedtheclassicpillardesignmethodology.Itconsistedofthreesteps(Mark,2006):1.Estimatingthepillarload;2.Estimatingthepillarstrength,and3.Calculatingthepillarsafetyfactor.Thaveragepillar,inregularlayoutsofpillarscanbeestimatedbytributary-areatheory,eachindividualpillarisassumedtocarrytheweightoftheoverburdenimmediatelyaboveit.Intheotherwords,apillaruniformlysupportstheweightofrockoverlyingthepillarandone-halfthewidthofroomsandentriesoneachsideofthepillar(Peng,1978).Pillarstrengthcanbedefinedasthemaximumresistanceofapillartoaxialcompression(BradyandBrown,1993).Empiricalevidencesuggeststhatpillarstrengthisrelatedtobothitsvolumeanditsshape(SalamonandMunro,1967;BradyandBrown,1993).Numerousformulashavebeendevelopedthatcanbeusedtoestimatethestrengthofpillarsincoalmines,whichTable1showsthemostapplicableofthem.Eachoftheseformulasestimatesthetopillarstrengthintermsoftwovarious;widthtoheightrationandinsitucoalstrength.Bieniawski(1981)representedverygoodclassicapproachtopillardesign.Heatfistdescribedtheissuesinvolvedinpillardesign,andadvantagesandshortcomingsoftheavailablemethodsandthenrepresentedalogical,step-by-stepapproachtodeterminethecoalpillarsdimensionsinroomandpillarmines.Table1 Mostapplicableofempiricalstrengthformulaforcoalpillars.Pillarstrengthformulas(MPa)ReferencePillarcross-sectionRemarksSalamonandMunro(1967)SquareBieniawski(1968)Square—Madden(1991)SquareMarkandChase(1997)Square—Nowadaysinmostoftheroomandpillarminesinordertoincreaserecoveryandproductivity,remanentpillarsinpanelsarerecoveredbyretreatmining.Since,theabovementionedmethodsarenotappropriateforpillardesignbecausethesemethodsneglecttheabutmentloadsduetoretreatminingandcreationofaminedoutgob.Abutmentloadsaffectonthepillarintheadjacentofpillarlineandaloadmorethantheoneestimatedbutributaryareatheoryappliedonpillar(MarkandChase,1997;Peng,1978).StudiesconductedbyvanderMerwe(19990)confirmtheincreaseofloadonthepillarsintheadjacentofthepillarline.Hecalculatedtheactualloadappliedonthepillarduringpillarrecoveryusingatwodimensionalboundaryelementmodelandestimatedthepillarsafetyfactorforthiscondition.Pillardesignwithouttheabutmentloadstofailureofpillarduringretreatmining.Pillarfailurescontinuetobeonethegreatestsinglehazardsfacedbyundergroundcoalminer,Pillarfailureresponsibleforunsatisfactoryconditionsincludes(Marketal.,2003):1.Pillarsqueeze,2.Massivepillarcollapse,and3.Coalpillarbumps.Theoccurrenceofpillarfailureinundergroundminesentailsdetrimentaleffectsonminersintheformofinjury,disabilityorfatalityaswellasminingcompanyduetodowntimes,interruptionsintheminingoperations,equipmentbreakdowns,etc.Forexamplein1992,airblastsduetopillarfailureatasouthernWestVirginiamineledtodestroyingof103ventilationstopping(Marketal.,1997).OnAugust6th,2007,violentcoalbumpoccurredinCrandallCanyonMineinUtah,andcausedtheentrappingofsixothers(Heasley,2009a).So,properpillardesignisthekeytopreventofpillarfailureandtheAnalysisofRetreatMiningPillarStability(ARMPS)programsareusedsuccessfullyfordesigningsaferetreatmining(Tuluetal.,2010).LaModelisaPC-basedprogramforcalculatingthestressesanddisplacementincoalminesorotherthinseamorveintypedeposits(HeasleyandBarton,1999;Heasley,2009b).Itisprimarilydesignedtobeutilizedbyminingengineersforinvestigatingandoptimizingpillardimensionsandlayoutsinrelationtooverburden,abutmentandmultipleseamstresses.Theprogramwasdevelopedbasedondisplacement-discontinuityvariationoftheboundaryelementmethod.MarkandChase(1997)developedtheARMPSprogrambasedonempiricalequations.ARMPSconsideringtheactiveminingzone(AMZ)calculatesstabilityfactor(ARMPSSF)basedonestimatesoftheloadsappliedto,andtheload-bearingcapacitiesof,pillarsduringretreatmining.Morethan150casesofretreatminingwerecollectedinUStoverifytheprogram(ARMPShelp,2008).Analysesofallthesecasesshowthatpillarsqueezeisthemostfrequenttypeoffailureandoccursinabouttwothirdsofcases.14casesofpillarsuddencollapseswereobserved,whichineverycaseoccurredwhentheARMPSSFwaslessthan1.5andwherethepillarwidthtoheightrationislessthan3.Allbut3ofthe17bumpsoccurredwhenthedepthofcoverexceeded400m.MarkandChase(1997)understoodthatalmostnoconsiderablemassivepillarcollapsesoccurswhenthepillarwidthtoheightrationmorethan4isselected.Theyalsoobservedwhenthedepthofcoverislessthan200m;theminimumrequiredstabilityfactortopreventmassivepillarcollapsesis1.5.Oneofthekeystominerssaftyandefficientrecoveryofthereservesistodesignsufficientlysizedpillarsthatwillpreventpillarsqueezes,excessivepillarspallingseverefloorheave,rooffalls,andpillarbumps.Regardingtheabovementionedcomments,anewmethodtodesigncoalpillarswithsquareshapeinroomandpillarminesispresentedinthefollowingsections.Theproposedmethodissuitableindeterminingoptimumpillardimensionsinroomandpillarmineswhereremanent,pillarsaresupposedtobeextractedafterpreliminaryminingcompletion.Thismethod,inadditiontoconsideringabutmentloads,lowerspillarfailurerisk.Thegoalofthismethodistohelpensurethatthepillarsdevelopedforfutureextractionareofadequatesizeforallanticipatedloadingconditions.MethodologySimilartotheARMPSprogram,theproposedmethodinthispaperconsidersthepillarsintheactiveminingzone(AMZ)becausethesepillarsareexposedtomaximumloadthroughoutminingprocessthereforethepillardimensionsobtainedbythismethodismoresatisfactory.Beforedescribingthedesignmethod,adescribingontheAMZisnecessary.AsshowninFig.1,AMZincludesallofthepillarsontheextractionfront(orpillarline),andextendsoutbythepillarlineadistanceof5timesthesquarerootofthedepthofcover.ThiswidthofAMZwasselectedbecausemeasurementsofabutmentloadfallswithinitsboundaries(MarkandChase,1997).Theproposedmethodisbasedinfiveprinciples(Ghasemietal.,2010a):CalculatingthemaximumloadappliedonthepillarsinAMZ(includingdevelopmentload,abutmentloads),Calculatingtheoverallload-bearingcapacityofpillarsinAMZ,Selectinganappropriatesafetyfactor,Calculatingthepillarwidth,andCorrectingthepillarwidthtofindtheoptimumpillarwidth.Themethodismadeupoftwelvestepswhicharedescribedbelow.Fig,2alsoillustratesdifferentstepsofthismethodinaflow-chartplot.ThesymbolsusedhereareprovidedinTable2.2.1.Step1:GatheringessentialdataEssentialdatatodeterminetheoptimumpillardimensionsinthismethodareasfollowing:Fig.1.SchematicshowoftheAMZ(MarkandChase,1997)Depthofcover:averageoverburdenthicknessoverthepillarsystem.Pillarheight(Miningheight):notethatthevalueofpillarheightisnotnecessarilyequaltotheseamthickness.Entrywidth:entrywidthisusuallydeterminedbaseonroofrockquality,productionrateandoperationalwidthofequipments.Inthismethod,crosscutsareassumedtohavethesamewidthastheentries.Insitucoalstrength.Meanunitweightoftheoverburden.Abutmentangle:theabutmentangledetermineshowmuchloadiscarriedbygob.Measurementoflongwallabutmentloadsindicatedthatanabutmentangle21°isappropriatefornormalcavingconditions.Forexample,ifnocavinghasoccurredabutmentangleis90°namelyzeroloadtransfertothegob(MarkandChase,1997).Panelwidth:panelwidthisusuallydeterminedbaseongeotechnicalconditions,stressstateintheregion,economiccriteria,andenvironmentalconditions.Panelwidthaffectsonstressdistributionloadingconditionsandcavingmechanism.Anincreaseinpanelwidthresultsinanincreaseoftheabutmentloadsappliedonthepillarsadjacenttothegobarea.Thetensionzoneheightdevelopedintheroofofthegobareaalsoincreaseasthepanelwidthincreaseandmayleadtoalargefailureinoverburden(Bieniawski,1987).Basedonwidthtodepthration(P/H),panelaredividedintocategories:·Sub-criticalpanels(P/H<2tanβ),and·Super-criticalpanels(P/H≥2tanβ).CoalMineRoofRating(CMRR):thisindexisusedtoevaluateroofrockquality.In1994theCMRRwasdevelopedtofillthegapbetweengeologiccharacterizationandengineeringdesign(MarkandMolinda,2005).Thisclassificationsystemconsidersgeotechnicalfactorssuchasroofrockstrength,beddingandotherdiscontinuities,moisturesensitivityoftheroofrock,groundwater,etc.CMRRvariesbetweenzeroand100.Basedonthisindex,roofrocksincoalminesareputinthreecategories(Chaseetal.,2002):·Weak(CMRR<45),·Intermediate(45<CMRR<65),and·Strong(CMRR>65).2.2.Step2:CalculatingAMZdimensionsAMZlengthandwidtharedeterminedfromEqs.(1)and(2)respectively: (1) (2)2.3.Step3:CalculatingdevelopmentloadDevelopmentloadareresultedfromtheoverburdenweightoveractiveminingzone.Basedontributaryareatheory,developmentloadsareobtainedfromthefollowingequation: (3)2.4.Step4:CalculatingthemaximumfrontabutmentloadRetreatminingstartswiththeextractionofthepanelpillars.Whenenoughofpillarshavebeenextracted,theoverburdenstrataabovetheextractedpillarsstarttocave.Asaresultofthisroofcaving,theactivegobiscarriedbythegob,butaconsiderableamountoftheoriginaloverburdenloadoverthegobistransferredtothepillarsinAMZandbarrierpillarsasafrontabutmentload(seeFig.1).Frontabutmentloadiscalculatedbasedonabutmentangleconcept(Mark,1992;Tuluetal.,2010)anditsdistributionisdifferentinsub-criticalandsuper-criticalpanels(seeFig.3).Dependingonwhetherthepanelissub-criticalorsuper-critical,themaximumfrontabutmentloadisgivenbuEqs.(4)and(5)respectively(Ghasemietal.,2010a): (4) (5)2.5.Step5:CalculatingsideabutmentloadThegobareabesidetheminingpanelisthesourceofsideabutmentload.Twogobareasmayexistbesideeachminingpanel.ThesideabutmentloadissharedbetweenthebarrierpillarandtheAMZ.Thisloadthesameasfrontabutmentiscalculatedbyabutmentangleconcept.GobareawidthandbarrierwidtharerequiredtocalculatesideabutmentloadappliedonAMZ.DependingloadisgivenbyEqs.(6)and(7)respectively(ARMPShelp,2008): (6) (7)Inbothofthem,regarding Eqs.(8),Ris: (8)FactorRistransferratethatshowsthepercentageoftotalsideabutmentloadthatisappliedtoAMZ.2.6.Step6:CalculatingthemaximumloadonAMZThemaximumloadappliedonthepillarsinAMZiscalculatedbysummationofdevelopmentload,maximumfrontabutmentload,andsideabutmentloadaccordingtothefollowingequation: (9)Fig.2.Flowchartforproposedcoalpillarsdesignmethod2.7.Step7:DeterminingnumberofentriesThenumberofexistingentriesisusuallydeterminedbasedonpanelwidth,rockmechanics,operationequipments,andproductionrate.Atleastfourentriesareneeded;oneforaccommodatingtheconveyor,oneforfreshair,andwoothersintwosidesofpaneltotaketheaieout(Stefanko,1983).Economicallyandoperationally,thisnumberofentriesisnotadequateincontinuous(mechanics)miningmethodandatleastfiveentriesshouldbeplannedwhichthisnumberincreasesuptosevenentriesinmineswithhighproductionrate(Hartman,1987).2.8.Step8:Calculatingtheload-bearingcapacityofAMZTheload-bearingcapacityofthepillarsinAMZiscalculatedbysummingtheload-bearingcapacitiesofallofthepillarswithinitsboundaries.Theload-bearingcapacityofeachpillarisdeterminedbumultiplyingtheirstrengthbytheirload-bearingarea(MarkandChase,1997).Inthismethod,pillarstrengthisestimatedusingtheBieniawski'sstrengthformula.ThenumberofexistingpillarsinAMZiscalculatedaccordingtothefollowingequation: (10)Hence,theoverallload-bearingcapacityofpillarsinAMZisgivenbythefollowingequation: (11)2.9.Step9:SelectinganappropriatesafetyfactorTheselectionofanappropriatesafetyfactorcanbebasedonasubjectiveassessmentofpillarperformanceorstatistcalanalysisoffailedandstablecases(SalamonandMunro,1967;Mark,1992).AccordingtothestudiesbyChaseetal.(2002),Table3providessuggestedsafetyfactorsforstabilityofthepillarsinAMZ.Thesevaluesareobtainedfrom250analysesofpaneldesigninUSandasitisseenfromtable,safetyfactordependsonCoalMineRoofRating(CMRR)aswellasdepth.2.10.Step10:CalculatingpillarwidthInthisstep,puttingthesafetyfactorinEqs.(12)andsolvingit,pillarwidthisobtained: (12)2.11.Step11:CorrectingpillarwidthtodecreasethepillarfailureriskAsitispointedoutbefore,oneifthewaystodecreasepillarfailurerisk,especiallylargepillarcollapse,istochooseapillarwidthtoheightrationlargethan4.Inthisstep,iftherationoftheobtainedwidthfromtheprevioussteptopillarheightissmallerthan4,pillarwidthisincreasedsoapillarwidthtoheightrationlargerthan4isreached.Ofcourse,inordertocontrolandavoidexcessiveincreaseofpillarwidth,therecoveryrateistakenintoconsider.Accordingtoexperimentsandconsideringeconomicpurposesinpreliminaryminingstage,themostsuitablerecoveryratevariesfrom40%to60%.Itshouldbenotice0.5misaddedtothepillarwidtheachtimeinthisstep.Table2 UsedsymbolinproposedcoalpillarsdesignmethodSymbolDescription(unit)AMZActiveminingzoneHDepthofcover(m)Renewaltable2pPanelwidth(m)hPillarheight(m)BEntrywidth(m)Meanunitweightoftheoverburden(KN/m3)Abutmentangle(°)AMZlength(m)AMZwidth(m)Developmentload(KN)Maximumfrontabutmentload(KN)Sideabutmentload(KN)Sidegobwidth(m)Barrierpillarwidth(m)Transferrate(%)MaximumloadappliedonAMZ(KN)Pillarstrength(MPa)NumberofentriesNumberofpillarsinAMZOverallload-bearingcapacityofAMZ(KN)SafetyfactorPillarwidth(m)WidthdifferenceOptimumpillarwidth(m)Fig.3.Abutmentangleconceptinsub-criticalandsuper-criticalpanels(Mark,1992)Table3 SuggestedsafetyfactorforstabilityofthepillarsinAMZDepthofcover(m)Weakandintermediateroof()Strongroof()2.12.Step12:DeterminingtheoptimumpillarwidthInthisstep,thewidthobtainedfrompreviousstepiscorrectedsothattheoptimumpillarwidthisdeterminedbasedonthenumberodpillarsineachrowandthepanelwidth.Inordertoatfirst△shouldbecalculatedusingEqs.(13).If△islessthanorequaltothesumofpillarwidthandentrywidth,theoptimumpillarwidthisobtainedfromEqs.(14).Otherwise,thenumberofentriesisaddeddependingon△valueandcalculatingarerepeatedfromstep8: (13) (14)InthefollowingsectionoptimumpillardimensionsinthemainpaneloftheTabasCentralCoalMine,locatedinmid-easternpartofIran,isdeterminedinordertovalidatetheproposedmethodandresultsareinterpreted.ThismineisthefirstmechanizedoneinIrandesignedasaroomandpillarmine.Thepillarsareleftbehindinthisminearesupposedtobeextractedasretreatmininginfutureafterthepreliminaryminingfinishes.Thereforeaproperpillardesigncanhasaremarkableinfluenceonhighersafetyandefficiencyofthereserverecoveryinthismine.TabasCentralCoalMineTabasCentralCoalMine(TCM)isthecasestudieshere,locatedinTabascoalregionapproximately85kmsouthofTabastowninYazdprovinceinmid-easternpartofIran(Fig.4).ThemineisworkingseamC1byroomandpillarmethodusingcontinuousminerandLHD.TheC1seamgradientis1in5(11°)andseamthicknessisabout2m.Theimmediateroofabovetheseamtypicallyisweak(CMRR=37)andconsistof0.1~0.2mthickmudstone,siltstone/sandstoneinterfacesandsandstonechannelsinsomeareaswithin3mwhichhavepotentialtobewater-bearing.Theimmediatefloorisabout1~1.3mofweakseatearth/mudstoneunderlinebystrongermudstones,siltstones/sandstones.Theminablereserveaccountsfor6milliontonesofcokingcoal(CentralMineDesignReport,2005).Theinsitustrengthofcoal,basedonresultsfromuniaxialcompressivetestsandGsddyequations(Bieniawski,1987),is6MPa.AscanbeseeninFig.4thesuggestedlayoutforthismineincludestwoaccessdrifts,amainpanel,andeasternandwesternpanelsinbothsidesonthemainpanel.Themainpanelisinitiallydevelopedin2004withfiveentriesandpillarswith20×20mdistancebetweencenters.Thispanelisdevelopedwithacontinuoushaulagesystemwith4.5mwideentriesandcrosscuts.So,pillarsleftbehindthispanelaresquareshapedandwidthis15.5m.Becauseofweakfloor,thepillarheightisnotequaltotheseamthicknessandis2.6m.Thecurrentrecoveryrateis40%.AccordingtonegotiationswiththetechnicalofficeandthecavingbehaviorobservedinthemineNo.1(neartheTCM),abutmentangleinTCMis25°,sothemainpanelissuper-critical(Ghasemietal.,2010b).Becauseofextractingthepillarsleftbehindintheeasternandwesternpanelspriortobeginningretreatmininginthemainpanel,gobiscreatedinbothsidesofthispanel.ThereforesideabutmentloadshouldbeconsideredincalculationofthemaximumloadappliedonpillarsinAMZ.Thegobareasaresuper-criticalandthebarrierpillarwidthinbothsidesis30m.Accordingtothedescriptionsgiveninthissection,theparametersrequiredinpillardesigninthemainpaneloftheTCMaresummarizedinTable4.Fig.4.LocationandsuggestedlayoutoftheTCMResultsTheresultsofproposedmethodformainpanelofTCMaresummarizedinTable5.BasedonTCMconditions(i.e.,depthofcover=85mandCRMM=37)theminimumsuitablesafetyfactorforpillarsstabilityis1.5(seeTable3).AscanbeseeninTable5thenumberofentriesequaltosixandoptimumpillarwidthequalto11.6mwereobtained.Incomparisonwithoriginalminelayout,oneunitwasaddedtoentrieswhichcanincreasetheproductionrateifefficientmanagementisapplied.Furthermorepillarwidthwasdecreasedremarkably(about4m)whichcauses8%increaseinrecoveryratethatshowstheproposedlayoutissmoreeconomic.Also,itcanbeseenthatthedevelopmentload,frontabutmentloadandsideabutmentloadconstitutes73%,19%and8%ofthetotalloadappliedonpillarsinAMZrespectively.ThenegligiblesideabutmentloadcanbeattributedtothegreatwidthofbarrierandpillarsinAMZsoasthebarrierpillarswidthincrease,themoreloadwillappliedtothem.Toconfirmtheresultsofproposedmethod,optimumpillarandotherrelatedparametersoftheTCMwereenteredasinputdatatoARMPSprogramandacceptablestabilityfactorswereobtained,whichindicatestheminingoperation,inboththepreliminaryandsecondaryminingstage,issafe.Table4 EssentialdataforpillardesignintheTCMParameterValueParameterValueH85m25KN/m3h2.6mβ25oB4.5mP85mS16MPaCMRR37Table5 SummaryforresultsforTCMParameterValueParameterValueLAMZ80.5mML10.87×106KNWAMZ46.1mNE6DL7.89×106KNwp11.6FL2.05×106KNRr248%SL0.93×106KN5.DiscussionandconclusionsPillardesign,especiallyinroomandpillarmines,isoneofthemostimportanttopicsinthefieldofcoalminegroundcontrol.VariousmethodshavebeensuggestedinrecentyearsmostofwhichlikeclassicmethodandBieniawskimethodneglectabutmentloads
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2026江蘇省城鎮(zhèn)化和城鄉(xiāng)規(guī)劃研究中心招聘2人備考題庫(kù)及答案詳解(奪冠系列)
- 2026廣東江門市臺(tái)山文化旅游集團(tuán)有限公司總經(jīng)理市場(chǎng)化選聘1人備考題庫(kù)及1套參考答案詳解
- 2026廣西南寧市青秀區(qū)荔英中學(xué)春季學(xué)期招聘?jìng)淇碱}庫(kù)及1套參考答案詳解
- 2026上海驅(qū)動(dòng)新區(qū)醫(yī)學(xué)技術(shù)學(xué)院招聘教學(xué)科研人員2人備考題庫(kù)及一套答案詳解
- 2026山東煙臺(tái)萊陽(yáng)市事業(yè)單位招聘?jìng)淇碱}庫(kù)及一套參考答案詳解
- 2026四川廣安市廣安區(qū)圖書館綜合崗招聘1人備考題庫(kù)及答案詳解參考
- 建筑消防設(shè)施檢測(cè)方案
- 設(shè)備檢修方案范本
- 服務(wù)方案承諾書
- 跌倒.墜床報(bào)告制度、應(yīng)急預(yù)案與處理流程
- 公路工地試驗(yàn)室安全培訓(xùn)課件
- 辦公樓裝修施工質(zhì)量控制方案
- GJB1406A-2021產(chǎn)品質(zhì)量保證大綱要求
- 醫(yī)院培訓(xùn)課件:《高血壓的診療規(guī)范》
- 2025亞馬遜云科技中國(guó)峰會(huì):基于Amazon Lambda 的AI應(yīng)用創(chuàng)新 (Featuring Dify)
- 口腔種植醫(yī)生進(jìn)修匯報(bào)
- 內(nèi)蒙古自治區(qū)滿洲里市2026屆中考聯(lián)考英語試題含答案
- 特教數(shù)學(xué)教學(xué)課件
- 高三一??己蠹议L(zhǎng)會(huì)課件
- 2025年云南省中考化學(xué)試卷真題(含標(biāo)準(zhǔn)答案及解析)
- 職業(yè)技術(shù)學(xué)院2024級(jí)智能網(wǎng)聯(lián)汽車工程技術(shù)專業(yè)人才培養(yǎng)方案
評(píng)論
0/150
提交評(píng)論