版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、A,1,WIRE BOND PROCESS INTRODUCTION,A,2,CONTENTS,ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator DEFECT,A,3,封裝簡(jiǎn)介,晶片Die,金線 Gold Wire,導(dǎo)線架 Lead fram,A,4,Wafer Grinding,Die Bonding,Wafer Saw,toaster,Wire Bonding,Die Surface Coating,Molding,Laser Mark,S
2、older Ball Placement,Singulation,Packing,封裝流程,Dejunk TRIM,Solder Plating,Solder Plating,Dejunk TRIM,TRIM/ FORMING,BGA,SURFACE MOUNTPKG,THROUGH HOLE PKG,A,5,Wire Bond 原理,pad,lead,Gold wire,Ball Bond ( 1st Bond ),Wedge Bond ( 2nd Bond ),A,6,Al,B.PRINCIPLE,A,7,銲接條件,HARD WELDING Pressure (Force) Amplify
3、 或著一個(gè)Die上出現(xiàn)不同Pad大小那就是以?xún)蓚€(gè)Pad中心距離為BPP,但是一般我們要取一個(gè)Die上最小的BPP,Bond Pad Pitch,Bond Pad Open,Bond Pad Open,A,73,Ball Size,Ball Thickness,Ball Size Ball Size = y; Area = (y/2) x/(y/2) = z g/mil,A,77,C,Ball bond,Test specimen,Specimen clamp,Shearing ram,Wire,Bond shoulder,Interfacial contact ball bond weld a
4、rea,Bonding pad,h,(A) Unsheared,C,L,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Full ball attached to wire-except for regions of intermetallic voiding,Ball separated at bonding pad- Ball interface-residual intermetallic (and sometimes portion of unalloyed ball and metal) on pad in bond
5、interaction area,(D) Ball bond-bonding pad interface separation (typical Au to Al),C,Test specimen,Specimen clamp,Shearing ram,Wire,Minor fragment of ball attached to wire,Bonding pad,C,L,Ball sheared too high (off line, etc.)only a portion of shoulder and ball top removed,Interfacial contact ball b
6、ond weld area,(B) Wire (ball top and/or side) shear,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Major portion of ball attached to wire,Interfacial contact- ball bond weld area intact,(C) Below center line shear, ball sheared through (typically Au to Au),C,Ball bond,C,L,Test specimen,Spe
7、cimen clamp,Bonding pad,Pad metallization separates from underlying surface,Residual pad on ball ball-pad interface remains intact,(E) Bond pad lifts,Test specimen,Specimen clamp,C,Ball bond,C,L,Bonding pad,Bonding pad lifts, taking portion of underlying substrate material with it,(F) Cratering,Resi
8、dual pad and substrate attached to ball,ball-pad interface remains intact,Shear Failure Modes,A,78,Crater Test,A,79,Calculate (I),UP Time =,(Total Actual Production Times Total Repair Time ),Total Actual Production Time,DOWN TIME RATE=,Total Repair Time,Total Actual Production Times,Total Operator A
9、ctual Repair Time,Total Operator Repair Frequency Stoppages,Total Actual Production Times Total Operator Repair Time,Total Operator Repair Frequency Stoppages,Total Technical Actual Repair Times,Total Technical Repair Frequency Stoppages,MTTS (MEAN TIME TO STOP ) =,MTBS (MEAN TIME BETWEEN STOP)=,MTT
10、A (MEAN TIME TO ASSISTANCE ) =,A,80,Calculate (II),MTBA (Mean Time Between Assistance) =,Total Actual Production Times Total Technican Repair Times,Total Technical Repair Frequency Stoppages,MTBF(Mean Time Between Failure)=,Total Actual Production Times Total Technician Repair Time,Total Change Part
11、s Repair Frequency Stoppage,規(guī)格寬度,製程寬度,規(guī)格上限 - 規(guī)格下限,6 ( 公差),(上限 or 下限 ) - 平均值,三個(gè)公差,CP ( 製程能力指標(biāo)) =,CPK =,=,A,81,Quality,正常品 Material Problem 1st Bond issue (Peeling , Ball Lift , Off Center) 2nd Bond issue (滑針,縫點(diǎn)脫,short tail ) Looping Fail (wire snake wire,sweep wire loop base bent ),A,82,正常品,A,83,Mate
12、rial Problem,A,84,With Ball,Wire,Pad Size,Missing Ball,Wire Broken,Bonding Ball Inspection,Ball Detection,A,85,Ball Size,Pad Center,Ball Center,Ball Placement (X,Y),Ball Off Pad,Bonding Ball Inspection (cont.),Ball Measurement,A,86,Peeling,1st Bond Fail ( I ),A,87,Ball Lift,1st Bond Fail (II),Ball Lift,A,88,Neck Crack,1st Bond Fail ( III ),A,89,Off Center,1st Bond Fail (IV),Off Center Ball,A,90,1st Bond Fail (V),Smash Ball,Smash Ball,A,91,With Weld,Wire,Capillary Mark,Missing Weld,Wire Broken,Lead,Bonding Weld Inspection,Weld Detection,A,92,2nd Bond Fail (
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 電機(jī)與電氣控制技術(shù) 課件 項(xiàng)目6 CA6150型臥式車(chē)床電氣控制電路的檢修
- 《GBT 14786-2008農(nóng)林拖拉機(jī)和機(jī)械 驅(qū)動(dòng)車(chē)輪扭轉(zhuǎn)疲勞試驗(yàn)方法》專(zhuān)題研究報(bào)告
- 《GBT 15306.3-2008陶瓷可轉(zhuǎn)位刀片 第3部分:無(wú)孔刀片尺寸(U級(jí))》專(zhuān)題研究報(bào)告
- 道路安全事故教育課件
- 迪愛(ài)生安全培訓(xùn)課件
- 邊境漁業(yè)安全培訓(xùn)班課件
- 重點(diǎn)行業(yè)企業(yè)用地布點(diǎn)采樣方案常見(jiàn)質(zhì)量問(wèn)題
- 車(chē)隊(duì)安全培訓(xùn)制度課件
- 2026年物資部工作年終總結(jié)范文(2篇)
- 車(chē)間負(fù)責(zé)人培訓(xùn)課件
- 2026年共青團(tuán)中央所屬單位高校畢業(yè)生公開(kāi)招聘66人備考題庫(kù)及參考答案詳解
- 2025內(nèi)蒙古鄂爾多斯市委政法委所屬事業(yè)單位引進(jìn)高層次人才3人考試題庫(kù)含答案解析(奪冠)
- 2025-2026學(xué)年外研版八年級(jí)上冊(cè)英語(yǔ)期末模擬考試題(含答案)
- 洗衣液宣傳課件
- “五個(gè)帶頭”方面對(duì)照發(fā)言材料二
- TTAF 241.1-2024 支持衛(wèi)星通信的移動(dòng)智能終端技術(shù)要求和測(cè)試方法 第1部分:多模天通衛(wèi)星終端
- 奶茶品牌2026年新品研發(fā)上市流程
- 日常飲食營(yíng)養(yǎng)搭配
- 上海醫(yī)療收費(fèi)目錄
- 操作系統(tǒng)安全基礎(chǔ)的課件
- 人教版(2024)八年級(jí)上冊(cè)物理期末復(fù)習(xí)全冊(cè)知識(shí)點(diǎn)提綱
評(píng)論
0/150
提交評(píng)論