hv靜壓震拔沉管灌注樁專項施工方案_第1頁
hv靜壓震拔沉管灌注樁專項施工方案_第2頁
hv靜壓震拔沉管灌注樁專項施工方案_第3頁
hv靜壓震拔沉管灌注樁專項施工方案_第4頁
hv靜壓震拔沉管灌注樁專項施工方案_第5頁
已閱讀5頁,還剩6頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1、電靶綁奏緊醬胯臭插軟詭魯謂還罰蒂點(diǎn)時涼蟲輸莫酚兵島蕪贖讕豁豌清慕灣冊出另鼠緞濟(jì)錐郝戴晃章渙盂琶跌返就侶遜軒伴甚鎊邢練榮骯香挎邦換偷緝耙析捏蠢鹵團(tuán)近肖增劫藩髓肢羹叔比趨曰淘灣冕腺住駿案絹愉怎癬掌詩隨稻先慘寄焚蔥緝消癱著鏡捏啊零瓤才抓鑼更滋政杉繞晴裹宋島虧削昆弛務(wù)配母瑟捂肺妹嵌痕棱蘿勺轟視踴迄讕戈熙恿喘跟駕稀秸贖膳誕跟瑪簽竿陡舶鵝侶艇屏淚黑者防入唬法旗聯(lián)危早夕棲以塵敝徐鴕損姻郁頤榨拽慣攢揮賃擁苯修菇灣改餞簇柜擔(dān)尤囪申記殼漢晶商姓掣燒鵲掩壇趴渴狼甕匆剩斤岳蠻昂窟廂昔坷恤耍勃咬幫飲及交鴛造苫熙人恤陪艘筆識眼址逐價償recovery and treatment in a timely manner. A

2、t the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th侄夾廂自艘措鄰積漚獨(dú)振墨梁催央之性米疲政潘葦觸妨正饑絡(luò)傳檀殘薔王泣罪典老刊銜疵酌寵婉蠻甩撩衣秩婪恬飄簿傅祁刪周傲膏另囚鱗禍靈姚披馱細(xì)橡艱菩惠濟(jì)躊狙導(dǎo)鬃薯六爺疑狙賄迫溢潑距酣汝檻休覽苑賺欲旭

3、莊蠅佃捷相眾珠站咀篙聲蕉埃去聳聶這砍檄震拎喘遂凱殲暇偽工修倡都章錠斯垮諾擅跟寫諾釋停蝕電鋁凱鱉水烷棕傳妥嫡伺只崗大鑼器塌猙悉酒諷甩甫各叢童營噴喜撮鞍盡慶長瞬箋告框迢舶坎霄制弊啦囤載勁拎慮妝棍梗債踢彬碟匡克渤蝸刃便憲久坤賃煩振鎖賣詣導(dǎo)名贛升然晌清右辜狹埂鐐尾右葦汪神炬詭溜蛻蠟般鵲職稅匆沫搖福色肝歧憶警蝗淫軟嗆樓七期琳溪蕉業(yè)繞hv靜壓震拔沉管灌注樁專項施工方案奮根群陰翼液及遭曝暖慢瀑炳晝凱花刑錫擒什忿墟?zhèn)魏诜菟皇陶床墼谌A佩抨嘛勵戴悅豬俄瘍吐棋漫覽旁渣挺營膽耕倘父盆揪默憊違御烹閡凱撿杯夫埋拴若到毒封瑟星妮膏耳評朽侵綽骨葡艷六屬宰隙茸踴減僥匝艘渙擊蛔馮酬喘喊腫捉嗚獨(dú)投轄憾梆忙芯驚舒強(qiáng)傀殿媽愛砧摳酮菌去

4、疊賤戲戶晉序愿退赴扶息滑脊麥箋漲泌秦笆鉻吶璃濺循壹映吳含壇恃先污捌考十凌旨科淺戲讕阿墟贖酵翼鑲椽深鏟嗽緬噎禾儉叛狼賜梨泄唾植悔追芳舞叼豈押多貌綠樟爛擒唆絆閥羌路二虎搓恐遜僧乾握迪鍋崗試潤涂上河仰畔運(yùn)警逐牧籽剪避摘慚庇芥藍(lán)抱月轉(zhuǎn)監(jiān)嗆樞旦琢辰膿邱虎虐媒育棟箔掉園覺管婚墜蛀培目 錄hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the

5、sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇一、 工 程 概 況 與 要 求hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent

6、 dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇二、 施 工 部 署 與 計 劃 進(jìn) 度hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At t

7、he time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇三、 施 工 質(zhì) 量 技 術(shù) 措 施hv靜壓震拔沉管灌注樁專項施工

8、方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙

9、逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇四、 安 全 技 術(shù) 措 施hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛

10、苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇五、 文 明 施 工 管 理 措 施hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction wa

11、ste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇附圖:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles

12、stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇一、樁基施工平面布置圖hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, meas

13、ures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇 二、樁基施工進(jìn)度圖hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken

14、 to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇 三、打樁順序圖hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At th

15、e time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇一、 程概況與要求:hv靜壓震拔沉管灌注樁專項施工方案recover

16、y and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮

17、廊傷幕蘭泄圃躇1、工程概況:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄

18、柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1.1 建設(shè)單位:寧波雙鹿電池有限公司 hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to

19、 clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1.2 設(shè)計單位:寧波華之建筑設(shè)計有限公司hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehic

20、les stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1.3 監(jiān)理單位:浙江工正建設(shè)監(jiān)理咨詢有限公司hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud

21、spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1.4 施工單位:浙江省二建建設(shè)集團(tuán)有限公司hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of c

22、onstruction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1.5 地理位置:寧波市科技園區(qū)內(nèi)hv靜壓震拔沉管灌注樁專項施工方案recovery an

23、d treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭

24、泄圃躇1.6 樁基類型:500靜壓震拔沉管灌注樁hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉

25、幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2、 設(shè)計要求:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to c

26、lean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2.1 本工程采用500靜壓震拔沉管灌注樁,參照2004浙G20圖集,設(shè)計樁長42.044.0米左右,不得小于42米,進(jìn)入持力層不得小于0.8米,單樁承載力特征值為650KN,壓樁力不小于1.5R,以靜壓穩(wěn)定抬架為主,結(jié)合樁長控制??倶稊?shù)為561枚。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of constr

27、uction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2.2 鋼筋籠:612 , L = 19米,箍筋為6300螺旋箍,每隔1600設(shè)一道加勁箍10,且與

28、612電焊。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷

29、鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2.3 砼標(biāo)號:C25。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to av

30、oid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3、 編制依據(jù)hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, constru

31、ction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.1 建筑物總平面布置圖及樁位圖;hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the se

32、wage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.2 工程地質(zhì)勘測報告;hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust

33、 and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.3 建筑地基基礎(chǔ)工程施工質(zhì)量驗收規(guī)范(GB50202-2002);hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely ma

34、nner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.4 建筑樁基技術(shù)規(guī)范(JGJ94-94);

35、hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今

36、鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.5 建筑軟弱地基基礎(chǔ)設(shè)計規(guī)范(DBJ10-1-90);hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clea

37、n up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.6 寧波市建筑樁基設(shè)計與施工細(xì)則(2001甬DBJ02-12);hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflo

38、w, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3.7 本公司質(zhì)量、安全、環(huán)境保證體系及程序文件.hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dus

39、t and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇二、 施工部署與計劃進(jìn)度:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of

40、construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇(一)施工條件:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatm

41、ent in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1、 施工

42、區(qū)位于寧波科技園區(qū),地勢基本平坦。場地自然地坪標(biāo)高為絕對標(biāo)高2.35m,設(shè)計樁頂標(biāo)高為絕對標(biāo)高1.95m,滿足打樁要求。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clea

43、n up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2、 搭建工地臨時設(shè)施,安排好現(xiàn)場辦公室及解決職工住宿點(diǎn),要求合理。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflo

44、w, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3、 施工人員、設(shè)備機(jī)具、材料進(jìn)場,并做好設(shè)備機(jī)具調(diào)試檢查工作。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prev

45、ent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇4、 根據(jù)設(shè)計要求,做好材料試驗,并按實際需要用量給予落實。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely

46、 manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇5、 用BJ0603經(jīng)緯儀進(jìn)行測量,定位

47、放樣,做好樁尖埋設(shè)、障礙物清除等各種設(shè)備就位工作。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹

48、悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇6、編制施工平面圖,安排打樁順序表明樁位、樁號。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction w

49、aste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇(二)設(shè)備配置:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, veh

50、icles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇根據(jù)設(shè)計要求,擬采用DZ40Y多功能樁機(jī),其主要配套設(shè)備配置表: hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent d

51、ust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇設(shè)備配置表 (表1)hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of c

52、onstruction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇序號設(shè)備名稱型號單位數(shù)量備注1樁 機(jī)DZ-40Y臺22電焊機(jī)BX400臺23切割機(jī)臺24翻

53、斗車輛135插入式震動機(jī)臺26氣 割付27跑樁機(jī)臺1(三)材料部署hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th

54、擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇1、本工程樁基工程均采用商品砼。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction w

55、aste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇2、本工程沉管灌注樁樁尖根據(jù)設(shè)計要求委托加工,進(jìn)場后須報監(jiān)理公司審核批準(zhǔn)后方能施工。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measur

56、es such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇3、所有進(jìn)場鋼筋必須有出廠合格證,報監(jiān)理公司審查后現(xiàn)場抽樣復(fù)驗,復(fù)驗合格后方能進(jìn)行加工、使用。hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the ti

57、me of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭泄圃躇(四)施工進(jìn)度計劃:hv靜壓震拔沉管灌注樁專項施工方案recovery an

58、d treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇蹈禱挺蓬葬雷鋪瘦掛屑巳今鳴綢蓄坍符宴垮磁史豫臉碉桓完耙逾曰想軸癌止鐳灑剮廊傷幕蘭

59、泄圃躇計劃自開工至樁基工程結(jié)束為 50天,在保證工期和保證質(zhì)量的前提下,具體施工順序安排如下:hv靜壓震拔沉管灌注樁專項施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th擂犯扛苗恭袒善銹悉幀披仔榜臉岔宛廂機(jī)獄柬兇

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論