版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
adlsongForwardConverterForwardConverter1開關(guān)管導(dǎo)通
LdiL/dt=Vin–Vo
I=(Vin–Vo)ton/L2開關(guān)管關(guān)斷
LdiL/dt=–Vo
I=–Votoff/LI:輸出電感伏秒平衡.輸出電壓:Vo=Vin1Conventionalclamp&resettechnical–MagnetizingcurrentresetbyanextrawindingthatinparallelwithPri-winding2RCDtypeclamp&resettechnicalLosslesssnubber-LCDSnubberCircuitSelfresonantresetSoftSwitching–ActiveClamp/ResetTheforwardconvertertransfersdirectlytheenergyfromtheinputsourcetotheloadduringtheon-timeofthepowerswitch.Duringoff-timeofthepowerswitch,theenergyisfreewheelingthroughtheoutputinductorandtherectifierD2,likeinachopperAforwardregulatorcanberealizedwithasingleswitchstructureorwithadoubleswitchstructure,accordingtothewaytheenergystoredinthetransformerprimaryinductanceisdemagnetized.Forward
convertersarecommonlyusedforoutputpowerupto250WNVinVout=dVinsingleswitches,andupto1kWindoubleswitchstructures.Singleswitchvs.doubleswitchforwardForwardConverterInthesingleswitchforward,themagnetizingenergystoredintheprimaryinductanceisrestoredtotheinputsourcebyademagnetizationwindingNd.Mostcommonly,theprimaryandthedemagnetizationwindingshavethesamenumberofturns.So,atturn-off,thepowerswitchhastowithstandtwicetheinputvoltageduringthedemagnetizationtime,andthen,oncetheinputvoltage.Thedemagnetizationandprimarywindingshavetobetightlycoupledtoreducethevoltagespike-morethanthetheoretical2Vin-occuringatturn-offacrossthepowerswitch.ForwardConverterForwardConverterPowerSwitch:VDDS>Vinmax(1+n)+leakageinductancespikeIDrms>1.2Pin/VinminDmaxIDrms>1.2Pin/VinminDmax1/2Rectifiers:ForwardD1:VRRM>Vinmax/n+leakageinductancespikeIF(AV)>IoDmaxFreewheelingD2:VRRM>Vinmax(Vo+VFD)/VinminDmaxIF(AV)>IoDemagnetizationD3:VRRM>(1+N3/Np)Vinmax(Vo+VFD)/VinminDmaxIF(AV)>ImagpeakDmax/2ForwardConverterDoubleswitchforward,alsocalledasymmetricalhalfbridgeforward,themagnetizingenergystoredintheprimaryinductanceisautomaticallyreturnedtothebulkcapacitorbythetwodemagnetizationdiodesD1andD2.ThetwopowerswitchesanddemagnetizationdiodeshavetowithstandonlyoncetheinputvoltageVin.Asforthedoubleswitchflyback,theasymmetricalhalfbridgeneedsafloatinggatedriveforthehighsideswitch.PowerSwitch:VDDS>VinmaxIDrms>1.2Pin/VinminD1/2Rectifiers:ForwardD1:VRRM>Vinmax(Vo+VFD)/VinminDmaxIF(AV)>IoDmaxFreewheelingD2:VRRM>Vinmax(Vo+VFD)/VinminDmaxIF(AV)>IoForwardConverterDualSwitchesConverters
SelfReverseVoltageClamp&
MagnetismCurrentResetMaxDutybeenlimitsandnotexceeds50%becauseofthemagnetizingcurrentresetLm=LPondualswitchesconvertersForwardConverterTheForwardConverterAReviewofTransformers:Voltageappliedacrossprimaryistransformedintoavoltageacrossthesecondary,withpolarityfollowingthedottedterminals,inaccordancewiththerelation:Vp/Vs=Np/NsCurrentgoingintothedottedprimaryterminalistransformedandgoesoutofthesecondaryterminal,followingtherelation:Ip/Is=Ns/NpAnidealtransformerdoesnotstoreenergy,hence:Pin=PoutorPp=Ps.ForwardConverterTheforwardtopologyisoneofthemostcommonlyused,andhasseveralvariations,themostbasicofwhichisshowninFigure1.9.Theforwardconverterisessentiallyanisolatedversionofthebuckconverteroperatinginthedirectmodeandthebasicsingleswitchversionshowncanbesuccessfullyoperatedoverawidepowerrange.Duetothetransformer,theforwardtopologycanbeusedaseitheranuporadownconverter,althoughthemostcommonapplicationisdownconversion.Thepowertransferredtothesecondaryduringtheon-timeisconductedthroughdiodeD1totheoutputLCfilter.Duringtheoff-time,thesecondarycurrentcirculatesthroughdiodeD2.Thetransformerisresetduringtheofftimebymeansoftheauxiliarywinding,Naux,anddiodeD3.Themainadvantagesoftheforwardtopologyareitssimplicityandflexibility.OutputRippleFrequencyFRelativeCostLowOnecommonvariationontheforwardconverteristhetwotransistorforward.Thisconfigurationaddsanotherswitchelementontheothersideofthetransformerprimaryandtwoclampingdiodes,onefromeachsideoftheprimarytotheoppositeinputvoltageterminal.Inexchangeforthisadditionalcomplexitythetwotransistorforwardreducesthevoltagestressontheswitchelements.ForwardConverter輔助繞組復(fù)位減小Dmax可以開關(guān)管的最大電壓,但會導(dǎo)致次級二極管的電壓應(yīng)力大.寬電壓輸入時:
Dmax=0.45andNp=Nr.開關(guān)管的最大電壓最大占空比RCD復(fù)位DissipativetypeClamp/ResettechnicalVerylowcostdesignofresetcircuitwithdiscretecomponentsR,CandDMax.operatingdutycouldbeslightlyhigherthan50%(upto55~65%),dependingthemagnetizingcurrentresetbyRCconstantCriticalpoint:Higherconsumptionbecausetheenergystorageon“C”shoulddissipatesbypassivecomponent“R”Thetransformervolt/secondbalanceshouldtradeoffbyadjustthevalueof“C”and“R”forClamp/ResetIncaseVDS≤2Vinbutverypossiblehigherthan2VINinworstcaseatopenloopoperatingandmaxdutyexceed50%ToavoidtransformersaturationneedtoevaluatetheDsetmaxofPWMincaseofshortcircuit
RCDresetThesnubbercapacitorvoltageisfixedandalmostindependentoftheinputvoltage,theMOSFETvoltagestresscanbereducedcomparedtotheresetwindingapproachwhentheconverterisoperatedwithawideinputvoltagerange.AnotheradvantageofRCDresetmethodisthatitispossibletosetthemaximumdutyratiolargerthan50%withrelativelylowvoltagestressonMOSFETcomparedtoauxiliarywindingresetmethod,whichresultsinreducedvoltagestressonthesecondaryside.ThemaximumvoltagestressthenominalsnubbercapacitorvoltageElementsofprimaryzenerclampcircuitD1currentPrimarywindingleakagecurrentwithreversecurrentpulloutduetoslowdiodeD1/C2LeakagespikeNormalizedandinvertedsecondarywindingvoltageMagnetizingvoltage
ringatdrainMagnetizingcurrentLCDResetSelfResonantReset要高壓的MOSFETAddAuxiliarySwitchSaBasicRCDClampRemoveResistorComparedwithRCD,CccandischargetoinverselydeeplymagnetizethemagnetizationinductanceviaSc.ActiveClampResetForwardConverter
Sa:
auxiliaryswitch
S1:
mainswitch
Da:
intrinsicparasiticdiodeinsideSa
D1:intrinsicparasiticdiodeinsideS1
C1:intrinsicparasiticcapacitorinsideSa
andexternalcapacitorActiveClampResetForwardConverter
1.Usuallyneedhighsidedriveforhighsideactiveswitch.NeedPchannelMOSFETforLowsidedrive.2.Deadtimeadjustmentinbetweentwoswitches3.ResonantTransitionmodeneedcontroltheinductanceofthemaintransformer.4.ActiveswitchneedselecthighvoltageMOSFETbecausetheenergystoreinCc5.AllowmuchhigherefficiencyoperationbecauseenergyoftransformermagnetizingrecyclesandZVTofthemainswitch.6.Lowervoltageclampwouldreducedthevoltagestressonmainswitch,similarpowertransfertoconventionalsquarewaveswitching7.ReducedEMI/RFIviasoftswitching8.Operateatfixedswitchingfrequency9.Dutycyclesbeyond50%maxareobtainable10.ActivelyresetsmaintransformertothirdquadrantofBHcurveActiveClampResetForwardConverter
S1SavCsipimiCcVinVCcActiveClampResetForwardConverter
M1:t0~t1
S1/DrisonandSa/DcisoffActiveClampResetForwardConverter
LfissohighthatitcanbeactedasconstantcurrentsourceIoM2:t1~t2
S1/Sa/DcisoffandDrisonNormalPWM
Im:Risefrom–to0to+Resonant
Im:RiseM3:t2~t3
S1/Sa/DrisoffandDcison
VNpisnegativesoDrisoffandIocannotreflectedtoprimaryside.
C1andLmresonateandVc1resonateduptoVin+VCcatt3andDaison.ActiveClampResetForwardConverter
Resonant
Im:DownResonant
Im:DownM4:t3~t4
S1/DrisoffandDa/Dcison
VNpis–VCcsoImisdemagnetizedto0andDaisturnedoffnaturallyatt4.SaisZVSduringt3~t4.M5:t4~t5
Sa/DcisonandSa/Drisoff
VNpis-VCcandImincreasesinverselyfrom0.Saisturnedoffatt5.ActiveClampResetForwardConverter
Resonant
Im:RiseinverselyM6:t5~t6
S1/Sa/DrisoffandDcison
LmandC1resonateandC1dischargeandVC1declinedtoVinatt6.Resonant
Im:RiseinverselyM7(veryshort):t6~t7
Sa/S1isoffandDr/Drison
VNpispositivesoDrison.PrimarycurrentisnotenoughtoprovideloadcurrentsoDcisstillonandsecondarysideisshortcircuit.PrimaryinductanceismagnetizedbyVin-VC1andiLmincreasesfromnegative.LeakageinductanceLkismagnetizedbyVin-VC1anditscurrentrisessharplyandisreflectedtosecondaryside.SoiDrincreasesgraduall
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 拉曼光譜生物標(biāo)記-洞察與解讀
- 企業(yè)內(nèi)部審計(jì)制度建設(shè)與風(fēng)險防控措施
- 醫(yī)療咨詢數(shù)據(jù)安全策略-洞察與解讀
- 新型儲能材料設(shè)計(jì)-洞察與解讀
- 催化劑綠色化技術(shù)-洞察與解讀
- 多語言溝通效能-洞察與解讀
- 部編版三年級語文下冊復(fù)習(xí)計(jì)劃、教案
- 幼兒園大班環(huán)保主題活動教案范本
- 初中化學(xué)復(fù)習(xí)課教案設(shè)計(jì)指南
- 生產(chǎn)人員培訓(xùn)管理測試試題
- 高一英語作業(yè)反饋與改進(jìn)計(jì)劃
- 六年級語文下冊《快樂讀書吧》必背知識點(diǎn)
- 鋼架樓梯安裝合同范例
- 太空電梯能源供應(yīng)-洞察分析
- 人教版英語八年級全冊單詞默寫模板
- 環(huán)境影響評估投標(biāo)方案(技術(shù)方案)
- 磚瓦廠脫硝工藝
- GB/T 43731-2024生物樣本庫中生物樣本處理方法的確認(rèn)和驗(yàn)證通用要求
- 《沉積學(xué)復(fù)習(xí)提綱》課件
- 信訪工作課件
- 110kV旗潘線π接入社旗陌陂110kV輸電線路施工方案(OPGW光纜)解析
評論
0/150
提交評論