1、1,Configuration Management,2,Overview of CM,Requirement Schedule for performing these activities CM tools,6,Requirements,d) CM methods and documented procedure(s); e) Organizations and responsibilities assigned to them; f) Level of required control for each configuration item; and g) Points at which
2、 items are brought under configuration management,7,Definition,Configuration: Interrelated functional and physical characteristics of a product as defined in technical documents (product configuration information) Configuration baseline: Configuration of a product, formally established at a specific
3、 point in time, which serves as reference for further activities (established whenever necessary),8,Configuration board (CB): Group of technical and administrative experts with assigned authority and responsibility to make decisions on the configuration and its management, also known as CCB. Configu
4、ration control: Activities comprising the control of changes to a configuration item after formal establishment of its configuration documents,9,Configuration identification(CI): Entity within a configuration that satisfied an end use function Product configuration information: Requirements for prod
5、uct design, realization, verification, operation and support (comprises both product definition & product operational information),10,Configuration status accounting (CSA): Formalized recording and reporting of the established configuration documents, the status of proposed changes and the status of
6、 the implementation of approved changes Configuration item (CI): Aggregation of hardware, software, processed materials, services, or any its discrete portions, that is designed for configuration management and treated as a single entity in the CM process,11,Objectives,To document and provide full v
7、isibility of the products present configuration and on the status of achievement of its physical and functional requirements. Another objective is that everyone working on the project at any time in its life cycle uses correct and accurate documentation,12,CM Process,Configuration identification Cha
8、nge control Configuration status accounting Configuration auditing,13,Organization of CM,CM should be organized with defined responsibilities and sufficient independence and authority to achieve the required CM objectives,14,Configuration board,It has the correct authority in relation to the relevan
9、t configuration baselines,15,CM plans and procedure,CMP: documented, approved, controlled, procedure, defined R & A, conveyed to suppliers Focus on customer requirements for the products, CM process be detailed in a CM plan CM plan may be a stand-alone document, or a part of another document, or com
10、posed of several documents,16,Configuration Identification,A family tree of product structure and selection of configuration items Documentation of configuration items Product configuration information Establishment of configuration baselines,17,Selection of Ci,Regulatory & statutory requirements Ne
11、w or modified technology, design or development Criticality in terms of high risks, safety Interfaces with other configuration items Support and service,18,Selection of Ci,Procurement conditions Logistics and maintenance aspects CIs should be initiated as early as possible in the product life cycle,
12、19,Documentation of Ci,All physical and functional characteristics necessary to define a CI throughout its life cycle should be documented Include specs, design documents, list, software data, manual CI depends on the level of control needs,20,Configuration baselines,Consists of all approved documen
13、ts that present the definition of the product at a specific point Be established whenever it is necessary to define a reference configuration during the product life cycle which serves as a starting point for further activities,21,Change control,Document and justify the changes Evaluate consequences
14、 of the change Approve or disapprove the change Implement and verify the change Process deviations and waivers,22,Change control procedure,All change proposals should be documented: * Config.items & related documents to be changed, name(s) & revision status * Name of the individual preparing the pro
15、posal, the organization and date prepared * Reason & description for the change * Urgency,23,Evaluation of change,The technical merits of the proposed change The impact on interchangeability, interfaces, and the necessity for re-identification The impact on regulatory, risk, contract, schedule, cost
16、, manufacturing, test, inspection method, purchases, stocks, maintenance, user handbooks, spare parts, spare-part manuals, delivery and customer support requirements.,24,Dispositioning Authority,Prior to approval of a change, should verify: The change is necessary The consequences are acceptable The
17、 change has been properly documented and classified The plan for the implementation of the change into documents, HW/SW is satisfactory Also be called a CCB,25,Approval of change,The R&A should be defined The authority for approval/disapproval may vary depending on the significant of the change. A d
18、ecision concerning approval/disapproval should be documented and notified the relevant areas.,26,The implementation and verification of an approved change normally includes following steps: Changes to the CI should be formally approved Appropriate consequential actions by the affected departments sh
19、ould be initiated Compliance should be verified,27,Configuration status accounting,CSA should perform throughout the life cycle of the product CSA should provide information of all CIs and all departures from the specified configuration baselines, it thus enables changes to configuration baselines t
20、o be traceable CSA records and reports should be a by-product of the identification and control activities,28,CSA Records,When: During configuration identification and change control What: Products configuration information (ID, title, effective date, version, change history, part number or build st
21、atus) Status of release of new product Products configuration (P/N, product design or build status) The processing of change,29,CSA Records,How: 8 steps Provide protection from corruptions or unauthorized change Provide means for disaster recovery Permit retrieval .,30,Reporting,A list of configurat
22、ion baselines documents A list of Configuration items and their configuration baselines Current configuration status Status reports on changes, deviations, waivers Status reports on the implementation and verification of changes,31,Configuration audit(CA),CA should be performed in accordance with do
23、cumented procedure to assure the product complies with its contracted or specified requirements and to assure the product is accurately reflected by its configuration documents,32,Configuration audit(CA),Functional CA: a formal examination to verify that a configuration item has achieved the perform
24、ance and functional characteristics specified in its configuration documents Physical CA: a formal examination if the “as-built/produced” configuration of a CI to verify that it conforms to its product configuration documents,33,Configuration audit(CA),CA may be required before the formal acceptance of a configuration item Not intended to replace other forms of verification, review, test o
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 安全員A證考試能力測(cè)試B卷及答案詳解【典優(yōu)】
- 恢復(fù)船舶維修工作方案
- 銷售團(tuán)隊(duì)2026業(yè)績?cè)鲩L與成本壓縮項(xiàng)目分析方案
- 社團(tuán)建設(shè)創(chuàng)新工作室方案
- 種植基地實(shí)施方案范文
- 公民素質(zhì)提升教育實(shí)施方案
- 醫(yī)療投訴工作方案怎么寫
- 消費(fèi)品工業(yè)中試驗(yàn)證平臺(tái)建設(shè)方案與實(shí)施路徑
- GB/T 6346.23-2025電子設(shè)備用固定電容器第23部分:分規(guī)范表面安裝金屬化聚萘二甲酸乙二醇酯膜介質(zhì)直流固定電容器
- 2026年溫州市龍灣區(qū)沙城街道辦事處公開招聘編外工作人員筆試參考題庫及答案解析
- 六年級(jí)寒假家長會(huì)課件
- 物流鐵路專用線工程節(jié)能評(píng)估報(bào)告
- 2026天津市南開區(qū)衛(wèi)生健康系統(tǒng)招聘事業(yè)單位60人(含高層次人才)備考核心試題附答案解析
- 重瞼手術(shù)知情同意書
- DL-T976-2017帶電作業(yè)工具、裝置和設(shè)備預(yù)防性試驗(yàn)規(guī)程
- 《煤礦低濃度瓦斯管道輸送安全保障系統(tǒng)設(shè)計(jì)規(guī)范》
- 換電柜維護(hù)培訓(xùn)課件
- 土石方工程掛靠合同
- 招聘會(huì)會(huì)展服務(wù)投標(biāo)方案(技術(shù)標(biāo) )
- 企業(yè)標(biāo)準(zhǔn)-格式模板
- 軟件售后服務(wù)人員提成方案附表
評(píng)論
0/150
提交評(píng)論