已閱讀5頁,還剩7頁未讀, 繼續(xù)免費閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
附錄 4 外文原文 The high-rise construction life gives the water way to the aqueous system the choice Abstract: Through the high-rise construction life for aqueous system each kind for the water way analysis comparison, thought the basis specialdetails use the top digit water tank reduced pressure are quite economicalreasonable give the water way for the water way or several kinds for thewater way union in at present. Key word: The high-rise construction gives the water for the water way reduced pressure The choice for the water way is the high-rise construction life to the aqueous system design key, it relates directly to the life gives the aqueous system the use and the project construction cost. Regarding the high-rise construction, the city cannot satisfy the high area partial domestic water generally for the water pipe network hydraulic pressure the request, the overwhelming majority uses the district for the water way, namely the low area are partial straight according to by the city for the water pipe network water supply, the high area partially pressurizes by the water pump the water supply. Speaking of the present our country city for the water condition, the hydraulic pressure may satisfiedly construct five six domestic water requests generally, the high area partial water supplies should act according to the special details determination. Construction Gives Water Draining water Design Standard (GBJ15 88) (Hereafter refers to as Standard)2. 3.4Strip stipulation that,“The high-rise construction life for the aqueoussystem vertical district, should act according to the operation requirements,material condition and so on equipment performance, service management, building layer, the union uses outdoor gives the water pipe network the hydraulic pressure reasonable determination. The district lowest health appliance matches the water drop place static hydraulic pressure, the housing, the hotel, the hospital is suitable is300 350KPa; The office building is suitable is350 450KPa。 ”Therefore, stipulated according to Standard the district for the water static hydraulic pressure, the proper attention to both fire prevention for the aqueous system for the water way, the high-rise construction life are partial for the aqueous system high area should carry onthe reasonable vertical district.The city uses to be day by day anxious, urges the high-rise building to the upper air development, the modern science and technology and the modern industry development, also has provided the condition for the high-rise construction,20Century50Since the age, inthe our country big city has constructed one batch of high-rise constructions one after another. Specially80Since the age later our country will haveimplemented the reform and open policy, the economic development willchange with each new day, the high-rise construction in the big or media-sized cities and even small town city like mushroom growth rising straight from the ground, the development will be very quick. According to Shanghai2,002The year statistical count indicated the high-rise construction has reached5,000Yu Dong. The high-rise construction is saving with, the magnificent city and improves aspect the and so on people quality of life superiority has recognized as each person. The high-rise construction fire fighting emergency is not easy to become now the fire to save goal“Three is difficult”O(jiān)ne (“Three is difficult”Is refers to the high-rise construction, the underground project, the petroleum chemical industry three kind of fires), but the high-rise construction fire fire prevention gives the water is thefire fighting foundation, also is difficult to be difficult. The high-rise construction although bases helps oneself, but falls behind helps oneself the system once to malfunction, or helps oneself the system although to be possible to work but cannot satisfy the use potency, the fire fighting also must depend upon the fire brigade the motion facility and equips saves goal.The housing achievement supplies the family housing use the construction, is important place which the humanity must not be possible from bottow to top to lack. In the correct processing housing design meets the fire question, relates directly to peoples life and property safety. At the same time, a reasonable engineering design also needs to consider the items of basic construction the investment construction cost, achieves both safely is suitable, and the economy is reasonable.The high area are partial the district which may use for the water way to include: The top digit water tank gives the water way; The frequency conversion velocity modulation water pump gives the water way for the water way or the barometric pressure pot. High level Civil construction Design Fire protection Standard (GB50045 95)7.4.7Strip stipulation that,“When uses the high pressure for the aqueous system, but does not suppose the top digit fire prevention water tank. When uses the temporary high pressure for the aqueous system, should suppose the top digit fire prevention water tank 。 ”O(jiān)ur country the fire prevention the temporar y high tension system is in the majority at present for the aqueous system in, the general high-rise construction all is equipped with the top digit fire prevention water tank. Increases in not many situations in the top digit water tank dischargeable capacity, the life water storage and the fire prevention store water at the same time stores in a water tank, this both the economy and is advantageous for the management. The top digit water tank has the constant voltage function, causes the cold hot water system hydraulic pressure maintenance balance, facilitates takes a bath. The frequency conversion velocity modulation water pump cannot satisfy the fire prevention to store the water volume, has the small current capacity and the zero current capacity water supply question, at the same time the frequency conversion control stock price is high, uses few in the high-rise construction. The barometric pressure pot is the barometric pressure pot adjustment volume is small for the water way main shortcoming, the similar existence cannot satisfy the question which the fire prevention stores water, the general achievement fire prevention for the aqueous system in regular pressure unit, uses in generally regarding the high-rise construction life for the water time the minority floor hydraulic pressure insufficiency turbo-charged. Because above many reasons, the overwhelming majority high-rise construction uses the top digit water tank at present for the water way, although the top digit water tank existence increase construction load and prevented the domestic water receives the question which two time pollutes. The top digit water tank may according to Standard for the water way to request to use the top digit water tank reduced pressure for the water way, the top digit water tank parallel for the water way or the top digit water tank series for the water way, or uses several kinds according to the special details to give the water way the union. Top digit water tank reduced pressure gives the water way use reduced pressure water tank and the pressure relief valve reduced pressure. The reduced pressure water tank takes the certain floor space, and increased had prevented the domestic water two time polluted the difficulty, had the noise influence. Pressure relief valve construction cost although high, but the area reduces greatly, does not affect the water quality moreover not to have the noise, the domestic pressure relief valve product quality enhances, the performance is reliable, therefore selects the pressure relief valve reduced pressure method to increase day after day. The top digit water tank gives the water way in the practical application to be possible according to the below situation consideration. 1.Construction altitude50mThe about high-rise construction, the high area are partial may use the tankWater pumpRoof water tankThe pressure relief valve gives the water way. If the low area is partially high to the water supply safe request, may direct the next pipe riser directly from the roof water tank to the low area pipe network, on this pipe riser supposes the electrically operated valve and the pressure relief valve, usually the electrically operated valve closure, stops the water supply for the water pipe network turns on the electrically operated valve when the city to the low area water supply. Like chart1Shows. This way water supply safe is reliable, fully has used the city pipe network hydraulic pressure, saves the energy. This way universal use. 2.Construction altitude50 80mThe about high-rise construction, the high area are partial may use the tankWater roof water tankThe pressure relief valve (sees the chart for the water way2) Or the top digit water tank parallel (sees the chart for the water way3) . Parallel for independent gives the aqueous system for the water way various districts, the water supply safely is reliable, water pump centralism arrangement, then management maintenance, movement power Fei Chuansheng. But walks must suppose the water pumpThe water tank two sets of equipment, increased the floor space which the water pump and the water tank took, the construction cost have increased, this especially was remarkable in the big city. Pressure relief valve for water way system simple, equipment expense few, area small, manages the maintenance to be convenient. But its water supply security compared to parallel misses for the water, the movement power cost is high. At present our country each place supplies power the situation to improve gradually, the electrical bill quite is moderate, uses the top digit water tank district reduced pressure to have the big superiority for the water way. This kind of situation ward partially has two districts. This way application are many. Like Chongqing medical college attached first hospital surgical department building which designs by the Chongqing construction university, total floor space 37756m2Underground has two, on has 23, the construction altitude 89.1m. The life uses the district for the aqueous system for the water way, four and below four supplies water directly by the city pipe network, five and above five by tankWater pumpRoof water tankThe pressure relief valve reduced pressure gives the water, the high area partially has two districts. 3.The construction approves highly80 110mThe about high-rise construction, the high area partial recommendations uses the top digit water tank district reduced pressure to give the water way, namely tankWater pumpRoof water tankThe pressure relief valve gives the water way, like chart4Shows. Also may use the top digit water tank parallel to give the water way. This kind of situation high area partially has three districts. 4.The construction surpasses highly110mThe high-rise construction, highest district lift of pump will be able very big, will press the water pipeline to be very long among, for will avoid this kind of situation being supposed to use the top digit water tank series (will not suppose when water tank for the water way to select relay water pump method). The recommendation uses the top digit water tank series to give the water and the reduced pressure to the aqueous phase union way, namely The top digit water tank series is various districts water pump disperses the establishment for the water way characteristic, pumps water respectively from the next district water tank, the next district water tank besides supplies this district at the same time is on a district water source, is suitable for the extra-high building. Its merit was avoids supposing lifts the high water pump and the height of water pressure water pipe, pressed the water pipe not to be able to be very long. Its shortcoming is because equipment dispersible, manages the maintenance to be inconvenient; The water pump supposes quakeproof, sound-insulated in the floor to requests high; On the area water supply the under area influence, the security misses. Series for water and reduced pressure to water union, because the equipment (water pump, water tank) reduce, saves the construction cost, and is advantageous to the management maintenance, also reduced the vibration and the noise influence, thus uses many in the extra-high building. Above four kindof situations also have the exception. Like Chongqing Yangtze river holiday hotel, construction altitude79.65mUnderground, on 23, underground to two by water pumpThe roof water tank union water supply, gives the water equipment turbo-charged water supply 21 to 23 by the barometric pressure. Its low area lowly matches the water drop to receive the static hydraulic pressure to reach0.8MPaAbout, this is because this district was good for the aqueous system material and the equipment bearing pressure ability and has taken the corresponding antivibration sound-insulated measure. In summary, the high-rise construction life should consider the many kinds of factors to the aqueous system for the water way choice. When construction altitude50mWhen about, the low area uses the city for the water pipe network hydraulic pressure direct water supply, the high area usesthe water pumpRoof water tank union water supply; When construction altitude50-80mWhen, the high area uses the top digit water tank pressure relief valve to give the water way; When construction altitude80-110mWhen, the high area uses the top digit water tank district reduced pressureto give the water way: When constructs surpasses highly110mWhen, the high area uses the top digit water tank series to give the water and the reduced pressure to the aqueous phase union way. In brief, should according to Standard to stipulate and to unify local the actual situation and theproject actual situation, the definite economy reasonable gives the water way. 附錄 5 外文譯文 高層建筑生活給水系統(tǒng)給水方式的選擇 摘要: 通過高層建筑生活給水系統(tǒng)各種給水方式的分析比較,認(rèn)為根據(jù)具體情況采用高位水箱減壓給水方式或幾種給水方式的結(jié)合在目前是比較經(jīng)濟合理的給水方式。 關(guān)鍵詞: 高層建筑 給水方式 減壓給水 選擇給水方式是高層建筑生活給水系統(tǒng)設(shè)計的關(guān)鍵,它直接關(guān)系到生活給水系統(tǒng)的使用和工程造價。對于高層建筑,城市給水管網(wǎng)的水壓一般不能滿足高區(qū)部分生活用水的要求,絕大多數(shù)采用分區(qū)給水方式,即低區(qū)部分直按由城市給水管網(wǎng)供水,高區(qū)部分由水泵加壓供水。就目前我國城市給水狀況而言,水壓一般可滿足建筑五六層的生活用水要求,高區(qū)部分的供水應(yīng)根據(jù)具體情況確定。建筑給水排水設(shè)計規(guī)范( GBJ15 88)(以下簡稱規(guī)范)第 2.3.4 條規(guī)定:“高層建筑生活給水系統(tǒng)的豎向分區(qū),應(yīng)根據(jù)使用要求、材料設(shè)備性能、維修管理、建筑物層數(shù) 等條件,結(jié)合利用室外給水管網(wǎng)的水壓合理確定。分區(qū)最低衛(wèi)生器具配水點處的靜水壓,住宅、旅館、醫(yī)院宜為 300 350KPa;辦公樓宜為 350 450KPa?!币虼?,根據(jù)規(guī)范規(guī)定的分區(qū)給水靜水壓,兼顧消防給水系統(tǒng)的給水方式,高層建筑生活給水系統(tǒng)高區(qū)部分應(yīng)進(jìn)行合理的豎向分區(qū)。 城市用地日趨緊張,促使中高層建筑物向高空發(fā)展,現(xiàn)代科學(xué)技術(shù)和現(xiàn)代工業(yè)的發(fā)展,也為高層建筑提供了條件, 20 世紀(jì) 50 年代以來,我國大城市里陸續(xù)興建了一批高層建筑。特別是 80 年代以后我國實行改革開放以來,經(jīng)濟建設(shè)日新月異,高層建筑在大中城市乃至 小城市里如雨后春筍的拔地而起,發(fā)展很快。據(jù)上海市 2002 年統(tǒng)計數(shù)表明高層建筑已達(dá) 5000 余棟。高層建筑在節(jié)約用地、壯觀城市和提高人們生活質(zhì)量等方面的優(yōu)越性已為每人所公認(rèn)。高層建筑滅火搶險不易已成為當(dāng)今火災(zāi)撲救中的“三難”之一(“三難”是指高層建筑、地下工程、石油化工三種火災(zāi)),而高層建筑火災(zāi)的消防給水是滅火的基礎(chǔ),又是難中之難。高層建筑盡管立足自救,但是落后自救系統(tǒng)一旦失靈,或自救系統(tǒng)雖可工作但不能滿足使用效能,滅火還必須依靠消防隊的移動設(shè)施和裝備去撲救。 住宅作為供家庭居住使用的建筑,是人類自下而上必 不可缺的重要場所。正確處理住宅設(shè)計中遇到的消防問題,直接關(guān)系到人民的生命財產(chǎn)安全。同時,一項合理的工程設(shè)計還要考慮建設(shè)項目的投資造價,做到既安全適用,又經(jīng)濟合理。 高區(qū)部分可以采用的分區(qū)給水方式有:高位水箱給水方式;變頻調(diào)速水泵給水方式或氣壓罐給水方式。高層民用建筑設(shè)計防火規(guī)范( GB50045 95)第 7.4.7 條規(guī)定:“采用高壓給水系統(tǒng)時,可不設(shè)高位消防水箱。當(dāng)采用臨時高壓給水系統(tǒng)時,應(yīng)設(shè)高位消防水箱?!蔽覈壳跋澜o水系統(tǒng)中臨時高壓制居多,一般高層建筑都設(shè)有高位消防水箱。在高位水箱有效容積增加不 多的情況下,生活貯水與消防貯水同時貯存于一個水箱中,這既經(jīng)濟又便于管理。高位水箱具有穩(wěn)壓作用,使冷熱水系統(tǒng)水壓保持平衡,方便洗浴。變頻調(diào)速水泵不能滿足消防貯水量,存在小流量和零流量供水問題,同時變頻控制股價格較高,在高層建筑中采用較少。氣壓罐給水方式的主要缺點是氣壓罐調(diào)節(jié)容積小,同樣存在不能滿足消防貯水的問題,一般作為消防給水系統(tǒng)中的經(jīng)常性增壓設(shè)備,對于高層建筑生活給水一般用于少數(shù)樓層水壓不足
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 氫氣專項施工方案(3篇)
- 溝渠圍擋施工方案(3篇)
- 廠房總施工方案(3篇)
- 中秋售賣活動策劃方案(3篇)
- 制作柜子施工方案(3篇)
- 零售行業(yè)庫存管理指南(標(biāo)準(zhǔn)版)
- 培訓(xùn)機構(gòu)如何續(xù)班
- 2025年中職數(shù)控管理(管理技術(shù))試題及答案
- 2025年大學(xué)單板滑雪平行大回轉(zhuǎn)運動與管理(平行大回轉(zhuǎn)技術(shù))試題及答案
- 2025年高職會計(高級財務(wù)會計)試題及答案
- 邀約來訪活動策劃方案(3篇)
- 2025年保險理賠流程操作規(guī)范手冊
- GB/T 8642-2025熱噴涂抗拉結(jié)合強度的測定
- 貴州省貴陽市2024-2025學(xué)年高一上學(xué)期期末監(jiān)測物理試卷(含解析)
- 2025河北省石家莊市公務(wù)員考試常識判斷專項練習(xí)題必考題
- 路燈勞務(wù)施工方案(3篇)
- 湖北省武漢市洪山區(qū)2024-2025學(xué)年五年級上學(xué)期期末數(shù)學(xué)試卷
- 2025年軍事理論知識考核試題及答案
- 甲醇的生產(chǎn)畢業(yè)論文
- 2025秋季新版八上語文新增名著《紅巖》必考考點總結(jié)
- 直招軍官筆試題目及答案
評論
0/150
提交評論