版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Discuss the construction temperature and crack of the concrete lightlyBy G. K. Kululanga, W. Kuotcha, R. McCaffer, Member, ASCE, and F. Edum-Fotwe ,The American Society of Civil EngineersThe summary , In order to prevent the owners of the concrete work of claims, we must do a good job in the constru
2、ction process in the temperature and crack control,through observation live for many years, through consulting the monograph about stress within the concrete, explain to concrete temperature reason , on-the-spot concrete control and measure , prevention of crack of temperature that crack produce. Ke
3、yword Concrete Temperature stress Crack Control 1. The concrete occupies the important position in modern engineering construction. But today, the crack of the concrete is comparatively general, the cracks are nearly omnipresent in the science of bridge building. Though we take various kinds of meas
4、ures in constructing, careful, but the crack still occurs now and then. Tracing it to its cause, it is one of them incompletely that our change to concrete temperature stress pays attention to. In the large volume concrete, temperature stress and temperature control are significant. This is mainly b
5、ecause of the reason of two respects. First of all, concrete often appear the temperature crack in not constructing, influence the globality and durability of the structure. Secondly, in the course of operating, the temperature change has remarkable influence that can't be ignored on the stress
6、state of the structure. We meet to construct temperature crack in mainly, so only to origin cause of formation and treatment measure, concrete of crack make a discussion in constructing this text. Reason of a crack Have many kinds of reasons to produce the crack in the concrete, it is mainly the cha
7、nges of temperature and humidity, fragility and disparity of the concrete, and the structure is unreasonable, the raw materials is not up to standard (if the alkali aggregate react), the template is out of shape, the foundation does not subside etc. evenly . The cement emits a large amount of heat o
8、f hydration when the concrete is hardenned, inside temperature is rising constantly, cause the stress of drawing on the surface. In the course of lowering the temperature , is it congeal foundation pay restrain to mix always later stage, will present the stress of drawing within the concrete . Reduc
9、ing of temperature can surface cause heavy stress of drawing very in concrete too. When these draw the stress and go beyond resisting the ability of splitting of concrete , namely will present the crack . A lot of inside humidity of concrete change very light or change relatively slow, surface humid
10、ity might change heavy the violent change takes placing. Such as maintaining thoroughly, when getting wetter when not doing,contract surface there aren't deformation doing, often cause the crack too. The concrete is a kind of fragility material , tensile strength is about 1/10 of the compression
11、 strength, is it carry on one's shoulder or back limit when draw out of shape to have *104 only , is it carry on one's shoulder or back limit location when stretch out of shape to there is *104 to add for a long time to add a short time. Because raw materials even, water dust than unstable,
12、transport and build phenomenon of emanating of course, its tensile strength is not even in the same concrete, a lot of resist the ability of drawing very low, it is apt to present the weak position of the crack. Among armored concrete , draw stress to undertake by reinforcing bar mainly , concrete b
13、ear stress of keeping just. Or reinforcing bar mix if edge position gone to to congeal present the stress of drawing in the structure in plain concrete, must rely on the concrete oneself to bear . Require to avoid the stress of drawing or only very small stress of drawing appears of the the general
14、design. But the concrete is cooled from maximum temperature to the steady temperature of operating period in constructing, often cause sizable to draw the stress within the concrete. The temperature stress can exceed other outsides and load the stresses caused sometimes, know change law , temperatur
15、e of stress for carry on reasonable structural design and construct extremely important. Analysis of 2 temperature stresses Can be divided into following three stages according to the forming process of the temperature stress: (1)It is early: Build concrete is it is it over basically to send out hea
16、t to cement to begin , generally one one day by oneself. Two characteristics at this stage, first, the cement emits a large amount of heat of hydration, second , mix and congeal the changing sharply of elastic model quantity. Because of the change of elastic model quantity , form the remaining stres
17、s in the concrete in this period. (2)Middle period: Up till the concrete is cooled until stability temperature from cement send out heat function basically when expiring, in this period, the temperature stress is mainly because the cooling of the concrete and external temperature change cause, these
18、 stresses and remnants stresses that is formed in early days are superposed , mix and congeal the elastic mould amount that goes to and does not change much during this period. (3)Later period: Operation period after the complete cooling of concrete. Temperature stress whether external temperature c
19、hange cause mainly, these stresses and first two kinds of remnants stresseses are changed and added . Can be divided into two kinds according to the reason why the temperature stress causes: (1)Spontaneous stress: There are not any restraint or totally static structure at the border, if inside tempe
20、rature is non-linear distribution, temperature stress appearing because structure restrains from each other. For example, the body of mound of the bridge, the physical dimension is relatively large, surface temperature is low when the concrete is cooled, inside temperature is high, present the stres
21、s of drawing on the surface, present the stress of pressing in the middle. (2)Restrain the stress: All of the structure ones or it restrain external one some border,can't out of shape and stress not cause not free. Such as case roof beam roof concrete and guardrail concrete. This two kinds of te
22、mperature stresses draw back stresses caused to act on with the doing of concrete together frequently. It is a more complicated job to want to analyse the distribution , size of the temperature stress accurately according to known temperature. In case of great majority , need to rely on the model te
23、st or the number value to calculate. To is it make temperature stress have sizable limp to creep concrete, at the stress accounting temperature, must consider the influence that creep , calculate concretly that no longer states thinly here. Control and preventing the measure of the crack of 3 temper
24、ature For prevent crack , lighten temperature stress can from control temperature and is it is it set about to restrain terms from two to improve. The measure of controlling temperature is as follows: (1)Is it improve aggregate grade mix , is it do rigid concrete to spend , mix mixture to adopt, is
25、it guide angry pharmaceutical or plastification pharmaceutical ,etc. measure in order to reduce cement consumption of concrete to add; (2)Add water or the water to cool the broken stone in order to reduce the temperature of building of the concrete while mixing and shutting the concrete; (3)Reduce t
26、he thickness of building while building the concrete on hot day, utilize and build the aspect to dispel the heat; (4)Bury the water pipe underground in the concrete, enter the cold water to lower the temperature openly; (5)Stipulate rational form removal time, the temperature keeps warm the surface
27、while lowering suddenly, in case that the rapid temperature gradient takes place in the concrete surface; (6)The concrete with medium and long-term and exposed construction builds a piece of surface or thin wall structure, take the measure of keeping warm in cold season; The measure of improving con
28、dition of restraining is: (1)Divide and sew and divide one rationally ; (2)Prevent the foundation from rising and falling too big; (3)Rational arrangement construction process, prevent the too big discrepancy in elevation and side from exposing for a long time; In addition, improve the performance o
29、f the concrete and improve and resist the ability of splitting, strengthen maintenance , prevent the surface from being done and contracted , especially guarantee the quality of the concrete is very important to preventing the crack, should pay special attention to avoiding producing and running thr
30、ough the crack , the globality resumed its structure after appearing is very difficult, so should rely mainly on preventing the emergence of the running through crack while constructing. In construction of concrete , for raise turnover rate of template , demand concrete form removal as soon as possi
31、ble that build newly often. Should consider form removal time properly when concrete temperature is higher than the temperature, so as not to cause the superficial early crack of concrete. Building the early form removal newly, cause very large stress of drawing on the surface, the phenomenon that &
32、quot; temperature is assaulted " appears. Build initial stage in concrete, because heat of hydration is sent out, the surface causes sizable to draw the stress, surface temperature is also higher than temperature at this moment, remove the template at this moment , surface temperature is lowere
33、d suddenly, must cause temperature gradient , thus add and draw the stress on the surface , change and add with the heat of hydration stress, in addition, the concrete dries and contracts , the superficial stress of drawing reaches very great number value, have danger of causing the crack, but cover
34、 a light-duty heat insulator with on the surface in time after removing the template , for instance foam sponge ,etc., for prevent concrete surface from produce the too big stress of drawing, have remarkable results. Add muscle influence to large volume temperature stress of concrete very light , be
35、cause large volume concrete include muscle to be rate very much low. Just have influence on the general armored concrete. On terms that temperature is not very high and the stress is less than limit of surrendering, every performance of the steel is steady, and have nothing to do with stress state ,
36、 time and temperature. Line bloated coefficient of steel and concrete line bloated coefficient difference very light, take place little internal stress very only between the two while changing in temperature. Because elastic mould amount of steel concrete elastic mould 715 of quantity, reach as inte
37、rior concrete stress tensile strength and when fracturing, the stress of the reinforcing bar will not exceed 10000kg/cm2. . So is it is it prevent tiny appearance difficulty very much of crack from to make use of reinforcing bar to want among concrete. But the crack in the structure generally become
38、s numerous, the interval is little, the width and depth are smaller after adding the muscle. And if diameter of reinforcing bar detailed and when interval dense, to improve concrete resist result of person who split better. Concrete and surface , armored concrete of structure can take place detailed
39、 and shallow crack often, among them the great majority belong to and do and draw back the crack. Though this kind of crack is generally all relatively light, it stills have certain influence on the intensity and durability of the structure. In order to guarantee concrete project quality , prevent f
40、racturing , improve the durability of the concrete, use the admixture to reduce one of the measures that fractures correctly. Whether is it reduce water is it split pharmaceutical to defend , I summarize his main function in practice to use. (1)There is pore Dao of a large number of mao in the concr
41、ete , produce capillary tension in the capillary after water is evaporated, make concrete is it contract out of shape to do. Increasing the thin aperture of hair can reduce the capillary surface tension , but will make the intensity of concrete reduce . This surface tension theory has already been c
42、onfirmed in the world as far back as the sixties. (2)Water dust than influence important factor that concrete shrink, is it reduce water is it split pharmaceutical can make concrete water consumption reduce by 25% to defend to use. (3)Cement consumption important factor, concrete of person who shrin
43、k too, is it add and subtract water is it split concrete reducible 15% of the cement consumption on terms that keep the intensity of concrete of pharmaceutical to defend to mix, its volume is supplemented by increasing aggregate consumption. (4)Reduce water is it split pharmaceutical can improve con
44、sistency of grout , reduce concrete secrete ink to defend, reduce and sink and draw back deforming. (5)Improve glueing the strength of forming of the grout and aggregate, the concrete improved resists the performance of splitting. (6)Concrete is it produce stress of drawing to restrain from while sh
45、rinking, crack when drawing the stress and is greater than concrete tensile strength can produce. Reduce water is it split pharmaceutical effective concrete tensile strength of improvement very to defend , improve resisting the performance of splitting of concrete by a wide margin. (7)It can make th
46、e concrete density good to add the admixture to mix , can improve resisting carbonization of concrete effectively , reduce carbonization to shrink. (8)Is it reduce water is it split slow coagulation time proper concrete under pharmaceutical to defend , on the basis of preventing the fast water of ce
47、ment from sending out heat effectively to mix, prevent the plasticity shrink that brings because the cement is not congealed for a long time from increasing. (9)Mix admixture concrete and getting easy and kind , surface easy to feel flat , form little membrane, reduce the moisture to evaporate, redu
48、ce drily and shrink. A lot of admixture all have the functions of slow coagulation , increasing and apt , improvement plasticity, the experiment that we should carry on in this respect more in the project practice is compared with and studied, than lean against not improving terms more simple,may ge
49、tting simple and more direct, economy. Early maintenance of 4 concrete Practice has proved , the common crack of concrete , most is the surface crack of different depth, main reason its whether temperature gradient cause cold temperature of area lower too easy to form crack suddenly. So say the warm
50、 - keeping of the concrete is especially important to preventing the early crack of surface. From the viewpoint of temperature stress, should reach and require to keep warm followingly: 1)Prevent concrete internal and external temperature poor and concrete surface gradient from , prevent the surface
51、 crack. 2)Prevent concrete from to be ultra and cold , should is it is it make the minimum temperature is not lower than the steady temperature of concrete service time construction time in concrete to try to try one's best. 3)Prevent the old concrete subcooling , in order to reduce the restrain
52、t among the old and new concrete. The early maintenance of the concrete, the main purpose lies in keeping the suitable warm and humid condition , in order to get the result of two respects, on the other hand make the concrete avoid the invasion and attack of the unfavorable and warm , humidity out o
53、f shape, the ones that prevent from harmfully are cold to contract and do to contract. On one hand make cement water function go on smoothly , is in the hope of reaching the intensity designed and resisting the ability of splitting. The suitable warm damp condition is interrelated. Mix warm - keepin
54、g measure paid to congeal often protect wet results too. Analyse , water concrete include moisture can meet demand , cement of water have enough and to spare newly theoretically. But because the reason of evaporating etc. often causes losses of the moisture, thus postpone or hinder water of the ceme
55、nt from, the surface concrete receives this kind of adverse effect easiestly and directly. Key period when maintained in initial a few days after so the concrete is built, should pay attention to conscientiously in constructing. Conclusions Construction temperature and relation of crack in concrete
56、the above carry on preliminary discussion of theory and practice, though the academia has different theories to origin cause of formation and computing technology of the concrete crack, but to concrete prevention and improving the measure suggestion to relatively unify , application in practice resu
57、lt fine too at the same time, concrete to is it observe , compare more more by us to want in constructing, analyse more , summarize more after going wrong , combine many kinds of prevention and deal with the measure, the crack of the concrete can be avoided. 2.Quality control of waterproof concrete
58、constructionCombined with experience, from formwork design, fabrication and installation, assembing reinforoement, pouring and curing of concrete and other aspects construction technology of fair-faced concrete is introduced as well as quality control measures and standards in order to reduce engine
59、ering cost to acquire satisfied economic and social benefits. The factors of influening waterproof- concrete quality are very many Any links does not pay attention to the water-proof concrete of field loss hinders the water function without exception jointly with degree.Engineering construction in the basement adopts secondary form board fabrication and installation, reinforced bar fabrication and bind, concrete stirring and mixing system and transport, concrete concrete covibration beat wit
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 藥物抗性寄生蟲(chóng)機(jī)制
- 語(yǔ)言文字規(guī)范化知識(shí)競(jìng)賽試題及答案
- 2025年醫(yī)療廢物分類(lèi)及管理試題附有答案
- 大學(xué)物理電磁學(xué)教學(xué)中的類(lèi)比教學(xué)法研究報(bào)告教學(xué)研究課題報(bào)告
- 2025年中小學(xué)教師高級(jí)職稱(chēng)專(zhuān)業(yè)水平能力試題庫(kù)(帶含答案)
- 服務(wù)貿(mào)易數(shù)字化創(chuàng)新
- 財(cái)務(wù)數(shù)字化轉(zhuǎn)型
- 初中化學(xué)綠色化學(xué)實(shí)驗(yàn)技術(shù)在環(huán)境教育中的應(yīng)用研究課題報(bào)告教學(xué)研究課題報(bào)告
- 編譯器實(shí)時(shí)性能優(yōu)化技術(shù)-洞察及研究
- 鋁土礦尾渣處理技術(shù)-洞察及研究
- 急性呼吸窘迫綜合征病例討論
- 畢業(yè)設(shè)計(jì)(論文)-自動(dòng)展開(kāi)曬衣架設(shè)計(jì)
- T/CCMA 0164-2023工程機(jī)械電氣線路布局規(guī)范
- GB/T 43590.507-2025激光顯示器件第5-7部分:激光掃描顯示在散斑影響下的圖像質(zhì)量測(cè)試方法
- 2025四川眉山市國(guó)有資本投資運(yùn)營(yíng)集團(tuán)有限公司招聘50人筆試參考題庫(kù)附帶答案詳解
- 2024年山東濟(jì)南中考滿(mǎn)分作文《為了這份繁華》
- 2025年鐵嶺衛(wèi)生職業(yè)學(xué)院?jiǎn)握新殬I(yè)傾向性測(cè)試題庫(kù)新版
- 《煤礦安全生產(chǎn)責(zé)任制》培訓(xùn)課件2025
- 項(xiàng)目進(jìn)度跟進(jìn)及完成情況匯報(bào)總結(jié)報(bào)告
- 民間融資居間合同
- 2024-2025學(xué)年冀教版九年級(jí)數(shù)學(xué)上冊(cè)期末綜合試卷(含答案)
評(píng)論
0/150
提交評(píng)論