ABC 三級質(zhì)控.doc教學(xué)內(nèi)容_第1頁
ABC 三級質(zhì)控.doc教學(xué)內(nèi)容_第2頁
ABC 三級質(zhì)控.doc教學(xué)內(nèi)容_第3頁
ABC 三級質(zhì)控.doc教學(xué)內(nèi)容_第4頁
ABC 三級質(zhì)控.doc教學(xué)內(nèi)容_第5頁
已閱讀5頁,還剩35頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、Good is good, but better carries it.精益求精,善益求善。ABC 三級質(zhì)控.doc-Attachement-1A、B、C三級質(zhì)量控制點一覽表A,B,CTHREEGRADEQUALITYCONTROLPOINT編碼CODE專業(yè)DISICIPLINE檢查內(nèi)容ITEMSTOBEINSPECTED等級GRADETJ-A土建專業(yè)CIVILTJ-A1場地準(zhǔn)備fieldpreparationCTJ-A110平整場地fieldflat標(biāo)高檢查elevationcheckC.RTJ-A120土石方工程earthandstoneworkTJ-A120填方fillingBTJ-A1

2、20挖方excavation坑、槽邊坡、底邊尺寸sideslop&bottomedgedimensionofpit&excavationC土質(zhì)檢查soiltestB.R回填標(biāo)高、密實度、平整度檢查inspectionoffillingelevation,high-densityandlevelingB.R標(biāo)高、平整度elevation,levelingB.RTJ-A130障礙物拆除obstacledemolition障礙物拆除檢查inspectionofobstacledemolitionCTJ-A2道路、地坪roadandgradeBTJ-A3鋼筋砼工程reinforedconcretewo

3、rkTJ-A31鋼筋砼基礎(chǔ)reinforedconcretefoundation現(xiàn)澆鋼筋砼基礎(chǔ)poured-in-placecon-cretefoundation砼澆注pouringofconcrete鋼筋制安fabricationandinstallationofreinforcementTJ-A311支摸formerecting模板及支撐強度、剛度、穩(wěn)定性formworkanditsbracingstrength,rigidityandstabilityC鋼筋、電焊條材質(zhì)檢查reinforcementandweldingrodmaterialcheckC.R回填土質(zhì)、標(biāo)高、密實度、平整度檢

4、checkbackfillingsoil,elevation,densityandlevelC基礎(chǔ)地基標(biāo)高、底邊尺寸檢查checkfoundationsoilelevationandbottomedgesizeC原材料檢查rawmaterialcheckC.R模板拼縫formworksplicingC砼塌落度concretesubsidenceC焊工合格證及焊接試驗檢查checkwelderqualificationcertificateandweldingtestB.R鋼筋的加工允差tolerancedeviationforprocessingofreinforcementB.R砼模板組裝、

5、預(yù)埋鐵件、預(yù)留孔偏差deviationofconcreteform-workassembly,embeddedironparts,andperformedholedeviationC.R砼強度concretestrengthB.R鋼筋安裝、焊接隱蔽檢查reinforcementinstallationandconcealedweldingcheckA/B.R砼外觀檢查concreteappearancecheckC砼外觀允差tolerancedeviationofconcreteappearanceB.R基礎(chǔ)隱隱蔽檢查foundationconcealingcheckBTJ-A312預(yù)制鋼筋砼

6、基礎(chǔ)precastreinforcedconcretefoundation基礎(chǔ)地基標(biāo)高、底邊尺寸檢查checkfoundationsoilelevationandbottomedgesizeC回填土質(zhì)、標(biāo)高、密實度、平整度檢checkbackfillingsoil,elevation,densityandlevelC預(yù)制基礎(chǔ)安裝允差tolerancedeviationofprecastfoundationinstallationB.R預(yù)制基礎(chǔ)分批檢查batchcheckprecastfoundationB.RTJ-A330預(yù)應(yīng)力鋼筋砼pre-stressedreinforcedconcrete

7、預(yù)應(yīng)力結(jié)構(gòu)試驗(必要時)pre-stressedstructuretest(whennecessary)B.R錨夾具性能anchorjigfunctionC.R預(yù)應(yīng)力構(gòu)件允差tolerancedeviationofpre-stressedcomponentB.R后張孔道灌漿強度和試驗post-tensionedholegroutingstrengthandtestB.R預(yù)應(yīng)力筋原材規(guī)格、品種、機械性能specification,varietyandmechanicalpropertyofrawmaterialofpre-stressedbarB.R砼抗壓強度concretecompressiv

8、estrengthB.R預(yù)應(yīng)力筋張拉stretchingofpre-stressedbarC.R預(yù)應(yīng)力筋焊接接頭機械性能weldingjointmechanicalpropertyofpre-stressedbarB.RTJ-A360其它others標(biāo)高竣工測量檢查measureandcheckforelevationcompleteA.R定位竣工測量檢查measureandcheckforlocatingcompleteA.RTJ-A420磚石基礎(chǔ)masonryfoundationTJ-A420磚石基礎(chǔ)砌筑masonryfoundationlaying回填土質(zhì)、標(biāo)高、密實度、平整度檢chec

9、kbackfillingsoil,elevation,densityandlevelC磚石強度檢查checkmasonrystrengthC.R基礎(chǔ)地基標(biāo)高、底邊尺寸檢查checkelevationoffoundationsoilandbottomedgesizeC.R砌筑方法、砂漿飽滿度layingmethodandmortarsatiationB砂漿配比、強度mortarmixratioandstrengthB.R砌體結(jié)構(gòu)允差tolerancedeviationofmasonrystructureB.RTJ-A460鋼筋砼構(gòu)件運輸安裝transportationandinstallatio

10、nofreinforcedconcreteunits構(gòu)件運輸安裝前合格證及強度檢查checkcertificateandstrengthbeforetransportationandinstallationB.R安裝前型號、尺寸、堵孔等檢查checkmodel,sizeandplugholebeforeinstallationC構(gòu)件焊接質(zhì)量weldingqualityofpartsC.R吊裝允差hoistingtolerancedeviationB.R接頭灌漿及灌漿砼抗壓強度jointgroutingandcompressivestrengthofgrouted-aggregateconcre

11、teB.RTJ-A470墻體砌磚wallbrick-laying磚石強度檢查checkmasonrystrengthC.R砌筑方法、砂漿飽滿度layingmethodandmortarsatiationB砂漿配比、強度mortarmixratioandstrengthB.R砌筑方法layingmethodC清水墻勾縫(砌體接搓方法)plainwallpointing(masonryconnectingmethod)C門窗洞、預(yù)流洞標(biāo)高尺寸elevationandsizeofdoor&windowopening,dredgingopeningC砌體結(jié)構(gòu)允許(預(yù)埋拉接鋼筋)masonrystruc

12、tureallows(embeddedtiebar)B.RTJ-A480其它others標(biāo)高竣工測量檢查measureandcheckforelevationcompleteA.R定位竣工測量檢查measureandcheckforlocatingcompleteA.RTJ-A5建筑ARCHITECHTURETJ-A510樓地面buildingfloor基層處理情況檢查checkbasetreatmentC面層與基層粘接情況adhesivityofsurfacingandbasecourseC面層質(zhì)量外觀及允許偏差surfacingqualityappearanceandtolerancede

13、viationB/C.RTJ-A520平瓦鋪設(shè)及允差flattilelayingandtolerancedeviationC.RTJ-A520瓦屋面tiledroofing平瓦質(zhì)量檢查驗收flattilequalityinspectionandacceptanceC.RTJ-A530卷材粘貼rollingmaterialadhesionTJ-A530卷材屋面rollroofing基層處理檢查checkbasecoursetreatmentC卷材、粘接材料質(zhì)量qualityofrollingmaterialandadhesivematerialC.R找平層的坡度slopeoflevelingco

14、urseC保溫(隔熱)層鋪設(shè)檢查insulationcourselayingcheckC找平層的質(zhì)量qualityoflevelcourseB各粘接層質(zhì)量qualityofadhesivecoursesC細部處理detailtreatmentC排水坡度drainageslopeC保護層protectivecourseC卷材搭接寬度rollingmateriallappingwidthC.R卷材的鋪貼方式及搭接長度rollingmateriallayingmethodandlappinglengthB滲漏試驗leakagetestA.RS1-A540玻璃安裝glassinstallation鋼門

15、窗安裝steeldoor&windowinstallation木門窗安裝woodendoor&windowinstallation木門窗制作woodendoor&windowfabricationS1-A540金屬、木門窗metal&woodendoor,window木門窗框與墻體嵌固牢固程度firmnessofwoodendoor&windowframefixedintowallC玻璃安裝外觀glassinstallationappearanceC鋼門窗規(guī)格、質(zhì)量steeldoor&windowspecificationandqualityB.R木門窗木材含水率woodendoor&wind

16、owmaterialwatercontentratioC.R鋼門窗安裝前矯正變形transformationalignmentofsteeldoor&windowbeforeinstallationC木門窗外觀woodendoor&windowappearanceB/C油灰puttyC木門窗五金件metalpartsofwoodendoor&windowC木壓條woodenbeadC鋼門窗框與墻體嵌固牢固程度firmnessofsteeldoor&windowframefixedintowallC窗紗windowscreenC木門窗留縫寬度及間隙woodendoor&windowprepare

17、dseamwidthandspaceC.R膠合制品質(zhì)量veneerwarequalityC木門窗安裝偏差deviationofwoodendoor&windowinstallationB.R鋼門窗開啟openofsteeldoor&windowC鋼門窗油漆質(zhì)量paintingqualityofsteeldoor&windowB木門窗表面質(zhì)量surfacequalityofwoodendoor&windowC鋼門窗安裝允差tolerancedeviationofsteeldoor&windowB.R木門窗制作允差tolerancedeviationofwoodendoor&windowC.RS1

18、-A550抹灰plastering外觀appearanceC表面質(zhì)量surfacequality基層與抹灰層粘接強度adhesivestrengthbetweenbaseandplasteringcourseC抹灰質(zhì)量允差tolerancedeviationofplasteringqualityB.RTJ-A560裝飾抹灰decorationplastering各層粘接、外觀質(zhì)量adhesiveandappearancequalitybetweencoursesC水刷面scrubbedgranolithicfinishB干粘面roughcastfacingB水磨石terrazzoB剁斧石ham

19、meredgranolithicB拉毛灰stuccoC抹水泥plasteringcementC裝飾抹灰允差tolerancedeviationofdecorationplasteringB.RTJ-A570鑲貼面層incrustationsurfacing品種、規(guī)格、顏色、圖案與設(shè)計是否variety,specification,colorandpatterncomplywithdesignornotA/B與基層粘接牢固程度firmnessofadhesivewithbasecourseC凸出物細部處理detailtreatmentofprotrudingC表面質(zhì)量surfacequality

20、C飾面板(磚)安裝允差tolerancedeviationforinstallationofdecorativeveneerA/B.RTJ-A580噴刷漿sprayedmortar顏色colorB外觀檢查要求inspectionrequiredappearanceB.RTJ-A590細木裝飾finewooddecoration木材含水率woodwatercontentratioC.R與基層連接牢固程度firmnessofadhesivewithbasecoursesC細木外觀檢查visualcheckoffinewoodC細木安裝允差tolerancedeviationforinstallat

21、ionoffinewoodB.RTJ-A6防腐蝕工程anti-corrosiveworkTJ-A610玻璃鋼襯里工程GRPliningwork玻璃布原材料檢查及其去蠟處理glassclothrawmaterialcheckanddewaxingC.R粘接材料(各種樹脂)配比mixratioofadhesivematerial(variousresin)C基層處理basecoursetreatmentC與基層粘接牢固程度firmnessofadhesivewithbasecoursesB搭接長度splicinglengthB表面質(zhì)量surfacequalityB.RTJ-A620耐酸磚、板襯里工

22、程liningworkofacidproofbrickandboard耐酸磚、板品種、規(guī)格檢查checkvarietyandspecificationofacidproofbrickandboardB.R粘接膠泥配比、原材料檢查checkmixratioofadhesivemudandrawmaterialC與基層粘接牢固程度firmnessofadhesivewithbasecoursesC凸出物細部處理detailtreatmentofprotrudingC表面質(zhì)量surfacequalityB.R耐酸磚、板安裝允差tolerancedeviationforinstallationofac

23、idproofbrickandboardA/B.RTJ-A630橡膠及塑料板襯里rubberandplasticlining粘接膠泥配比、原材料檢查checkmixratioofadhesivemudandrawmaterialC與基層粘接牢固程度firmnessofadhesivewithbasecoursesC搭接長度檢查splicinglengthC表面質(zhì)量surfacequalityC橡膠板及塑料板粘貼允差tolerancedeviationofadhesiverubberboardandplasticboardA/B.RTJ-F筑爐專業(yè)FURNACETJ-F1一般爐類設(shè)備genera

24、lfacilitiesforfurnaceTJ-F110保溫釘insulationnail材料交接檢查checkmaterialtransferC保溫釘焊接檢查checkweldingofinsulationnailBTJ-F120耐火絕熱砼fireproofinsulationconcrete材料檢查checkmaterialB.R水質(zhì)檢查checkwaterqualityB.R強度strengthB.R砼外觀concreteappearanceB允差tolerancedeviationB.RTJ-F130耐火氈fireprooffelt材料交接檢查checkmaterialtransfer

25、B.R耐火氈粘貼檢查checkadhesiveoffireprooffeltB.R外觀檢查visualcheckATJ-F140磚brick材料交接檢查checkmaterialtransferB.R砌筑方法檢查checklayingmethodC耐火膠泥飽滿度檢查checksatiationoffireproofmudB允差tolerancedeviationB.R外觀檢查appearancecheckATJ-F150耐火砂漿抹灰plasteringoffireproofmortar材料交接檢查checkmaterialtransferC細部處理detailtreatmentC允差toler

26、ancedeviationB.R外觀檢查appearancecheckATJ-F160模板、拱胎制作fabricationofformworkandarchmould模板及支撐強度、剛度、穩(wěn)定性formworkanditsbracingstrength,rigidityandstabilityC模板拼縫檢查checkformworksplincingC模板組裝偏差tolerancedeviationassemblyofformworkBTJ-F2成套爐類設(shè)備completesetsoffurnacefacilitiesTJ-F270烘爐檢查checkfurnaceignitionA.RTJ-H

27、金屬結(jié)構(gòu)專業(yè)metalstructureTJ-H1建筑物金屬結(jié)構(gòu)architecturalmetalstructureTJ-H110建筑物金屬結(jié)構(gòu)制作fabricationofarchitecturalmetalstructure材料交接檢查checkmaterialtransferC.R焊接質(zhì)量外觀weldingqualityappearanceC重要焊接部位無損探傷non-destructivetestforkeyweldedpartsB.R鉚接質(zhì)量外觀rivetingqualityappearanceC螺栓連接螺栓擰緊程度bolttightnessatbolt-connectedC鋼接構(gòu)

28、防腐處理anti-corrosivetreatmentonsteelstructureB構(gòu)件端部銑平允差tolerancedeviationformillingofelementsendsC.R構(gòu)件制作允差tolerancedeviationfabricationofelementB.R焊縫外觀檢查visualcheckweldingseamB.R堆放檢查checkstackingBS1-H120建筑物金屬結(jié)構(gòu)安裝installationofarchitecturalmetalstructure安裝前鋼結(jié)構(gòu)檢查矯正checkandcorrectbeforeinstallationofsteel

29、structureC焊接質(zhì)量weldingqualityB.R螺栓連接擰緊程度tightnessofboltonboltconnectionB.R構(gòu)件安裝檢查checkelementinstallationB.R鋼結(jié)構(gòu)油漆檢查checkpaintingofsteelstructureCTJ-I絕熱專業(yè)disciplineofinsulationTJ-I1設(shè)備絕熱equipmentinsulationTJ-I110設(shè)備保溫equipmentinsulation材料交接檢查checkmaterialtransferB.R表面清潔檢查checksurfacecleaningC保溫層厚度、飽滿度檢查c

30、heckthicknessandsatiationofinsulationlayerB.R保護層檢查checkprotectionlayerC外觀檢查visualcheckBTJ-I120設(shè)備保冷equipmentcoldinsulation材料交接檢查checkmaterialtransferB.R表面清潔檢查checksurfacecleaningC保冷層厚度、飽滿度檢查checkthicknessandsatiationofcoldinsulationlayerB.R保護層檢查checkprotectionlayerC外觀檢查visualcheckBTJ-I2管道絕熱pipingheat

31、isolationTJ-I210管道保溫pipingthermalinsulationBTJ-I220管道保冷pipingcoldinsulationBTJ-I230儀表管保溫instrumentpipethermalinsulationBTJ-M管道專業(yè)disciplineofpipingTJ-M110地下金屬管undergroundmetalpiping坡、底尺寸及支座檢查checkdimensionofslope&bottom,andsupportC材料交接檢查checkmaterialtransferB.R閥門、管件常規(guī)檢查routinecheckvalveandpipefitting

32、sC焊接工藝、焊工資格認證approveforcertificatesofweldingprocessandweldersqualificationC.R管道預(yù)制檢查checkpre-fabricationofpipingB管道內(nèi)清潔度檢查checkinsidepipingcleaningC焊縫探傷檢查checkweldingseamtestC.R管道安裝偏差檢查checkdeviationofpipinginstallationB水壓或試漏hydraulicpressureorleakagetestA.R回填前隱蔽工程檢查checkconcealedworkbeforebackfilling

33、A.R回填土容重、標(biāo)高、平整度volume&weight,elevationandlevelofbackfillingsoilBTJ-M120非金屬管non-metalpipe坡、底尺寸及支座檢查checkslope&bottomsizeandsupportC材料交接檢查checkmaterialtransferB.R閥門、管件常規(guī)檢查routinecheckvalveandpipefittingsC鋪設(shè)檢查checklayingC管道內(nèi)清潔度檢查checkinsidepipecleaningC接口檢查checkconnectionC管道安裝偏差檢查checkdeviationofpipein

34、stallationB水壓或試漏hydraulicpressureorleakagetestA.R回填前隱蔽工程檢查checkconcealedworkbeforebackfillingA.R回填土容重、標(biāo)高、平整度volume&weight,elevationandlevellingofbackfilledsoilBTJ-M130管道予制和安裝pipingfabricationandinstallationTJ-M130襯理管linerpipe回填前隱蔽工程檢查checkconcealedworkbeforebackfillingA.R材料交接檢查checkmaterialtransferC

35、坡、底尺寸及支座檢查checkslope&bottomsizeandsupportC襯理后系統(tǒng)嚴(yán)密度試驗post-linersystemsealingtestA接口閥蘭墊片螺拴檢查checkgasketandboltofconnectingflangeC回填土容重、標(biāo)高、平整度volume&weight,elevationandlevellingofbackfilledsoilB焊接工藝、焊工資格認證approveforcertificatesofweldingprocessandweldersqualificationB.R管道安裝標(biāo)高、水平度、坡度檢查checkelevation,leve

36、landslopeofpipinginstallationC水沖洗或吹掃結(jié)果檢查checkwaterflushingorpurgeresultA.R管段制作檢查checkfabricationofpipesectionsC襯理前管段強度試驗pipingstrengthtestbeforelineredA.R襯理標(biāo)面處理檢查checklinerfacetreatmentC電火花檢查checkelectricsparkleC.R襯理厚度及外觀檢查checklinerthicknessandappearanceCTJ-M2地上管above-groundpipingTJ-M210金屬管道安裝metal

37、pipinginstallation材料規(guī)格和材質(zhì)檢查checkmaterialspecificationandqualityC.R安裝前管內(nèi)清潔度檢查checkinsidepipecleaningC水壓試驗hydraulictestA.R焊接工藝、焊工資格認證approveforcertificatesofweldingprocessandweldersqualificationB.R管道支承和吊架安裝檢查checkinstallationofpipesupportandhangerC嚴(yán)密性試驗(如需要)sealingtest(whennecessary)A.R彈簧吊架調(diào)整adjustspr

38、inghangerC泄漏性試驗(如需要)leakagetest(whennecessary)A.R閥門、管件檢查(checkvalveandpipefitting)C.R焊接材料用前檢查checkweldingmaterialbeforeapplicationC管道無應(yīng)力聯(lián)接檢查checknon-stressconnectionofpipes)B吹掃purgeA.R高壓管加工后檢查checkhighpressurepipeafterprocessingC.R靜電接地測試statisticgroundingtestC.R化學(xué)清洗chemicalflushingA.R焊接環(huán)境條件檢查checkwe

39、ldingenvironmentconditionC伴熱檢查checkheattracingC彈簧吊架和支架的調(diào)整adjustspringhangerandsupportB坡口檢查checkgrooveC最終外觀檢查finalvisualcheckB管道補償器就裝檢查checksiteinstallationofpipecompensatorC.R預(yù)制前管內(nèi)清潔度檢查insidepipecleaningcheckbeforepre-fabricationC試壓前管道安裝檢查checkpipinginstallationbeforepressuretestB管道預(yù)制焊縫外觀檢查visualche

40、ckpipingpre-fabricationweldingseamC.R無損探傷檢查non-destructivetestB.R焊后熱處理(如需要)post-weldingheattreatment(ifnecessary)C.R硬度檢查checkrigidityC.RTJ-M220其它地上管(襯理管)otherabove-groundpipe(linerpipe)襯理后系統(tǒng)嚴(yán)密度試驗post-linersystemsealingtestA.R材料交接檢查checkmaterialtransferC接口閥蘭墊片螺拴檢查checkgasketandboltofconnectingflanges

41、C水沖洗或吹掃結(jié)果檢查checkwaterflushingandpurgeresultA.R焊接工藝、焊工資格認證approveforcertificatesofweldingprocessandweldersqualificationB.R管道安裝標(biāo)高、水平度、坡度檢查checkelevation,levelandslopeofpipinginstallationC管段制作檢查checkfabricationofpipesectionsC襯理前管段強度試驗pre-linerpipingstrengthtestA.R襯理標(biāo)面處理檢查checklinersurfacetreatmentC.R電火

42、花檢查checkelectricsparkleC.R襯理厚度及外觀檢查checklinerthicknessandappearanceCTJ-M3隨機配管、伴管stochasticpipesandaccompaniedpipesTJ-M310隨機配管stochasticpipesTJ-M310試壓pressuretestTJ-M310管道安裝pipinginstallation水壓試驗hydraulictestA.R材料規(guī)格和材質(zhì)檢查checkmaterialspecificationandqualityC安裝前管內(nèi)清潔度檢查insidepipecleaningbeforeinstallati

43、onC焊接工藝、焊工資格認證approveforcertificatesofweldingprocessandweldersqualificationB.R嚴(yán)密性試驗(如需要)sealingtest(ifnecessary)A.R管道預(yù)制焊縫外觀檢查visualcheckofpipingpre-fabricationweldingseamC.R閥門、管件常規(guī)檢查valveandpipefittingsroutinecheckC泄漏性試驗(如需要)leakagetest(ifnecessary)A.R試壓前管道安裝檢查checkpipinginstallationbeforepressurete

44、stB吹掃purgeA.R焊接材料用前檢查checkweldingmaterialsbeforeapplicationC最終外觀檢查finalvisualcheckB坡口檢查groovecheckC預(yù)制前管內(nèi)清潔度檢查insidepipecleaningcheckbeforepre-fabricationC管道預(yù)制焊縫外觀檢查visualcheckpipingpre-fabricationweldingseamC.R無損探傷檢查non-destructivetestB.RTJ-M4金屬結(jié)構(gòu)metalstructureTJ-M430卷管bendedpipestochasticpipes鋼材、焊接

45、材料、連接材料型號規(guī)格typeandspecificationofsteel,weldingmaterialandjointmaterialC.R卷管幾何尺寸檢查checkgeometricdimensionofbendedpipeC焊縫外觀檢查visualcheckofweldingseamC.R焊縫試驗weldingseamtestB.R最終外觀檢查finalvisualtestATJ-N電氣專業(yè)electricTJ-N1動力設(shè)備powerequipmentTJ-N110高壓動力設(shè)備highvoltagepowerequipment設(shè)備及材料交接檢查checkequipmentmateri

46、altransferB土建安裝交接檢查checktransferofcivilinstallationB.R盤、柜安裝檢查checkpanelandcabinetinstallationB接地檢查checklocallyC.R母線連接檢查busconnectioncheckB油/隔離開關(guān)調(diào)整試驗adjusttestofoil/isolationswitchC.R互感/避雷器調(diào)整試驗adjusttestofC.R電容器、計量柜調(diào)試adjustcapacitorandcomputationcabinetC.R受電試驗powerreceivingtestA.RTJ-N120中壓動力設(shè)備mediumv

47、oltagepowerequipmentTJ-N130低壓動力設(shè)備lowvoltagepowerequipment設(shè)備及材料交接檢查checkequipmentandmaterialtransferB土建安裝交接檢查checkcivilinstallationtransferB.R盤、柜安裝檢查checkpanelandcabinetinstallationB接地檢查checkgoundingC.R母線連接檢查checkbusconnectionB盤、柜調(diào)整試驗panelandcabinetadjusttestC受電試驗powerreceivingtestATJ-N2動力電纜、配線powerc

48、ableandwiringTJ-N21電纜敷設(shè)cablelayingTJ-N211地下電纜undergroundcable電纜材料交接檢查checktransferofcablematerialB電纜敷設(shè)檢查checkcablelayingC.R電纜中間接頭檢查checkcableinter-connectorB.R電纜試驗cabletestC.R電纜驗相及接線檢查checkcablephaseandwiringATJ-N212地上電纜abovegroundcableTJ-N22動力配線powerwiringTJ-N221母線bus材料交接檢查checkmaterialtransferB母線安

49、裝檢查checkbusinstallationC母線耐壓試驗busvoltageC受電試驗powerreceivingtestBTI-N222電動機配線motorwiring設(shè)備及材料交接檢查checkequipmentandmaterialtransferB導(dǎo)管、電纜敷設(shè)檢查checklayingofconduitandcableC控制按鈕安裝檢查checkcontrolbuttoninstallationB電機干燥(如需要)motordrying(ifnecessary)C.R電機抽芯檢查(如需要)coreoffcheck(ifnecessary)A.R接地接零檢查groundcheckC

50、接線及防爆密封檢查wiringandexplosiveproofsealingcheckB電機試驗motortestC.R電機空載試運行motoridlingtestrunA.RTJ-N23雜項miscellaneousTJ-N231電纜溝cabletrench電纜溝檢查checkcabletrenchCTJ-N232電纜橋架cablerack材料交接檢查checkmaterialtransferC橋架安裝檢查checkcablerackerectionCTJ-N3照明illuminationTJ-N310車間照明illuminationofshop設(shè)備及材料交接檢查checkequipmen

51、tandmaterialtransferB導(dǎo)管敷設(shè)檢查checkconduitlayingC導(dǎo)線、電纜敷設(shè)檢查checkwireandcablelayingC照明器具安裝檢查checkinstallationoflightingfixtureC防爆及密封檢查explosiveproofandsealingcheckB絕熱檢查insulationcheckC照明試驗lightingtestATJ-N330道路、廠區(qū)照明roadandplantarealighting設(shè)備及材料交接檢查checkequipmentandmaterialtransferC燈柱(桿)安裝檢查lightingcolumn

52、(pole)installationcheckB導(dǎo)管敷設(shè)檢查checkconduitlayingC導(dǎo)線、電纜敷設(shè)檢查wireandcablelayingcheckC燈具安裝檢查checklightingfixtureinstallationC照明試驗illuminationtestATJ-N4電訊系統(tǒng)telecomm-unicationsystemTJ-N430廣播站臺broadcaststation設(shè)備、材料交接檢查checkequipmentandmaterialtransferB設(shè)備安裝檢查checkequipmentinstallationC音響安裝檢查soundinstallatio

53、ncheck線路敷設(shè)檢查circuitlayingcheckC試音檢查soundtestequipmentATJ-N440呼叫聯(lián)絡(luò)設(shè)備paging&contactingequipment設(shè)備、材料交接檢查checkequipmentandmaterialtransferB設(shè)備安裝檢查checkequipmentinstallationC線路敷設(shè)檢查checkcircuitlayingC絕緣、接線檢查checkinsulationandwiringC.R呼叫聯(lián)絡(luò)設(shè)備試驗testofpaging&contactingequipmentATJ-N450報警系統(tǒng)alarmsystem設(shè)備、材料交接檢查

54、checkequipmentandmaterialtransferB設(shè)備安裝檢查checkequipmentinstallationC線路敷設(shè)檢查checkcircuitlayingC絕緣、接線檢查checkinsulationandwiringC.R報警系統(tǒng)試驗testofalarmsystemAS1-N5架空電力輸送系統(tǒng)overheadpowerdeliverysystemS1-N521架空線路金屬附件metalaccessoriesofoverheadline材料交接檢查checkmaterialtransferB安裝檢查checkinstallationBS1-N522架空線路開關(guān)ov

55、er-headlineswitch材料交接檢查checkmaterialtransferB安裝檢查checkinstallationB架空線路開關(guān)試驗testofoverheadlineswitchC.RS1-N523架空線路桿塔架工程pole,towerandrackworkforoverheadlineS1-N523鐵塔架立irontowererectionS1-N523電桿組立setuppolegroup材料交接檢查checkmaterialtransferB鐵塔基礎(chǔ)交接檢查checkirontowerfoundationtransferB電桿基坑檢查checkholeofpolefou

56、ndationC鐵塔材料交接檢查checkirontowermaterialtransferC電桿組立檢查checkpolegroupsetupB鐵塔架立檢查checkirontowererectionB.R隱蔽工程檢查checkconcealedworkA.RS1-N524電纜溝cabletrenchS1-N6接地系統(tǒng)groundingsystemS1-N610接地母線支線、接地groundingbusbranches,ground材料交接檢查checkmaterialtransferC接地網(wǎng)安裝檢查checkgroundingneterectionC.R隱蔽工程檢查checkconceal

57、edworkA.RS1-N620防靜電接地staticelectricity-proofgrounding材料交接檢查checkmaterialtransferC靜電接地安裝檢查checkinstallationofstaticelectricitygroundingC防腐檢查anti-corrosivecheckB接地電阻測定testofgroundingresistanceC.RTJ-N630避雷針(網(wǎng))lightningrod材料交接檢查checkmaterialtransferC接地網(wǎng)安裝檢查checkgroundingneterectionB.R隱蔽工程檢查checkconceale

58、dworkA.R避雷針安裝檢查checklightningrodinstallationC防腐檢查anti-corrosivecheckB接地電阻測定measuregroundingresistanceC.RTJ-N7其它電氣安裝installationotherelectricalequipmentTJ-N710起重設(shè)備電氣安裝installationofelectricalequipmentforhoistingdevice設(shè)備及材料交接檢查checkequipmentandmaterialtransferB管線敷設(shè)檢查checkpipelinelayingC電氣設(shè)備安裝檢查checkin

59、stallationofelectricalequipmentB接地檢查groundingcheckC.R電器設(shè)備調(diào)整試驗adjustmenttestofelectricalequipmentC.R起重設(shè)備試運行hoistingdevicetestrunATJ-N720電梯電氣安裝elevatorelectricinstallation設(shè)備及材料交接檢查checkequipmentandmaterialtransferB導(dǎo)管、導(dǎo)線敷設(shè)檢查checkconduitandwirelayingC電梯電氣安裝檢查checkelevatorelectricinstallationB電梯負荷和超載試運行e

60、levatortestrunwithloadandoverloadA.RTJ-N730陰極保護系統(tǒng)cathodeprotectsystem設(shè)備及材料交接檢查checkequipmentandmaterialtransferB陰極保護安裝調(diào)試檢查adjustandcheckinstallationofcathodeprotectC隱蔽工程檢查checkconcealedworkA.RTJ-N740電機調(diào)速裝置motorspeedregulatingdevice設(shè)備及材料交接檢查checkequipmentandmaterialtransferB電機調(diào)速裝置安裝檢查checkinstallatio

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論