某匝道跨線橋滿堂式施工支架受力計(jì)算書(shū)_第1頁(yè)
某匝道跨線橋滿堂式施工支架受力計(jì)算書(shū)_第2頁(yè)
某匝道跨線橋滿堂式施工支架受力計(jì)算書(shū)_第3頁(yè)
某匝道跨線橋滿堂式施工支架受力計(jì)算書(shū)_第4頁(yè)
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

PAGE某匝道跨線橋滿堂式施工支架受力計(jì)算書(shū)1、底模板下次梁(6×12cm木枋)驗(yàn)算:底模下腳手管立桿的縱向間距為0.9m,橫向間距根據(jù)箱梁對(duì)應(yīng)位置分別設(shè)為0.46

和0.9

m,頂托工字鋼橫梁按橫橋向布置,間距90cm;次梁按縱橋向布置,間距35cm和18cm

。因此計(jì)算跨徑為0.9m,按簡(jiǎn)支梁受力考慮,分別驗(yàn)算底模下斜腹板對(duì)應(yīng)位置和底板中間位置:a、斜腹板對(duì)應(yīng)的間距為18cm的木枋受力驗(yàn)算底模處砼箱梁荷載:P1

=

1.26×26

=

32.7kN

/m2

(按1.26m砼厚度計(jì)算)模板荷載:P2

=

200

kg/m2

=

2

kN

/m2設(shè)備及人工荷載:P3

=

250

kg

/m2

=

2.5

kN

/m2砼澆注沖擊及振搗荷載:P4

=

200

kg/m2

=

2

kN

/m2則有P

=

(P1

+

P2

+

P3

+

P4)=39.2kN

/m2W

=

bh2/6

=

6×122/6

=144

cm3由梁正應(yīng)力計(jì)算公式得:

σ

=

qL2/

8W

=

(39.2×0.18)×1000×0.92

/(

8×144×10-6)=5.6Mpa

[σ]

=

10Mpa

強(qiáng)度滿足要求;由矩形梁彎曲剪應(yīng)力計(jì)算公式得:

τ

=

3Q/2A

=

3×(39.2×0.18)×103×(0.9

/2)/

(2×6×12×10-4)=

0.66Mpa<

[τ]

=

2Mpa(參考一般木質(zhì))強(qiáng)度滿足要求;由矩形簡(jiǎn)支梁撓度計(jì)算公式得:E

=

0.1×105

Mpa;

I

=

bh3/12

=6×123/12=

864cm4f

max

=

5qL4

/

384EI

=

5×(39.2×0.18)×103×103×0.94

/

384×864×10-8×1×1010=

0.69mm<

[f]

=

1.5mm(

[f]

=

L/400

)剛度滿足要求。b、底板下間距為40cm的木枋受力驗(yàn)算中間底板位置砼厚度為0.23m,按0.23m進(jìn)行受力驗(yàn)算,考慮內(nèi)模支撐和內(nèi)模模板自重,木枋間距0.30m,則有:底模處砼箱梁荷載:P1

=

0.23×26

=

5.98kN

/m2

內(nèi)模支撐和模板荷載:P2

=

400

kg/m2

=

4

kN

/m2設(shè)備及人工荷載:P3

=

250

kg

/m2

=

2.5

kN

/m2砼澆注沖擊及振搗荷載:P4

=

200

kg/m2

=

2

kN

/m2則有P

=

(P1

+

P2

+

P3

+

P4)=

14.48

kN

/m2q=14.48×0.40=5.792t/m<35.1×0.18=6.318

t/m表明底板下間距為0.40m的木枋受的力比斜腹板對(duì)應(yīng)的間距為0.18m的木枋所受的力要小,所以底板下間距為0.40m的木枋受力安全。以上各數(shù)據(jù)均未考慮模板強(qiáng)度影響,若考慮模板剛度作用和3跨連續(xù)梁,則以上各個(gè)實(shí)際值應(yīng)小于此計(jì)算值。2、頂托橫梁(I14工字鋼)驗(yàn)算:腳手管立桿的縱向間距為0.9m,橫向間距為0.9m和0.46m,頂托工字鋼橫梁按橫橋向布置,間距90cm。因此計(jì)算跨徑為0.9m和0.46m,為簡(jiǎn)化計(jì)算,按簡(jiǎn)支梁受力進(jìn)行驗(yàn)算,實(shí)際為多跨連續(xù)梁受力,計(jì)算結(jié)果偏于安全,僅驗(yàn)算底模下斜腹板對(duì)應(yīng)位置即可:平均荷載大小為q1=

39.2×0.9=35.28kN/m

另查表可得:WI14

=102×103mm3

;

I

=

712×104mm4

;

S

=

I

/

12跨內(nèi)最大彎矩為:Mmax

=

35.28×0.46×0.46/8=

0.93kN·m由梁正應(yīng)力計(jì)算公式得:

σw

=

Mmax

/

W

=

0.93×106

/

(102

×103

)=9.1Mpa

[σw]

=

145Mpa

滿足要求;撓度計(jì)算按簡(jiǎn)支梁考慮,得:E

=

2.1×105

Mpa;

f

max

=

5qL4

/

384EI

=

5×35.28×1000×0.464×109

/

(384×2.1×105×712×104)=

0.013mm<

[f]

=

2.25mm(

[f]

=

L/400

)剛度滿足要求。

3、立桿強(qiáng)度驗(yàn)算:腳手管(φ48×3.5)立桿的縱向間距為0.9m,橫向間距為0.9m和0.46m,因此單根立桿承受區(qū)域即為底板0.9m×0.9m或0.46m×0.9m箱梁均布荷載,由工字鋼橫梁集中傳至桿頂。根據(jù)受力分析,不難發(fā)現(xiàn)斜腹板對(duì)應(yīng)的間距為0.46m×0.9m立桿受力比其余位置間距為0.9m×0.9m的立桿受力大,故以斜腹板下的間距為0.46m×0.9m立桿作為受力驗(yàn)算桿件。則有P

=

35.1kN

/m2,由于大橫桿步距為1.2m,長(zhǎng)細(xì)比為λ=L/

i

=

1200

/

15.78

=

76,查表可得φ=

0.744

,則有:[

N

]

=

φA[σ]

=0.744×489×215

=

78.22

kN

而Nmax

=

P×A

=39.2×0.46×0.9

=16.23

kN,可見(jiàn)[

N

]

N,抗壓強(qiáng)度滿足要求。另由壓桿彈性變形計(jì)算公式得:(按最大高度14m計(jì)算)

△L

=

NL/EA

=

16.23×103×14×103/2.1×105×4.89×102=2.21mm

壓縮變形很小,完全滿足施工要求。

4、地基容許承載力計(jì)算:立桿基底下部為某高速,為C30混凝土路面,其承載力肯定滿足要求。中央分隔帶為

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論