1、Copyright 2009 Accenture All Rights Reserved.,NGDC Showcase - Solution Architecture,2,Copyright 2009 Accenture All Rights Reserved.,Introduction to the NGDCv3 Services Stack,Focuses on both the Technology and Operations stacks to provide a “top down” Service Oriented Infrastructure,Physical Environm
2、ent,ITIL based framework for Infrastructure Services,ITSM,Business Services,IT Processes,ApplicationMgmt,Infrastructure Services,Application Services,Sec Mgmt,Security Services,Pooled VMware; eGenera From the Storage parameter determine which storage tier to provision from Create the necessary provi
3、sioning requests either directly to the “bare-metal” or via a message-broker/interface to a specific provisioning tool Deliver application server Return neccesary meta-data to the authorised requester,Provide platform from the pool Provision the requested operating system onto the platform Basic ope
4、rating system configuration completed: administrator accounts, network configurations specific to the VLAN, etc,Provide storage from the storage pool according to tier Update data archiving polices Add server to data backup service the relevant backup/recovery policy,Ensure new application server is
5、 monitored by Operations Re-evaluate capacity across the server to identify any limits being reached Update the clients Service List to ensure billing records are accurate,Service Request Mgmnt 7.5 ITSM Suite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,15,Copy
6、right 2009 Accenture All Rights Reserved.,FS-001,Key Functional Specifications include Provision of a new application/server platform according to the selections made from Service Catalogue. This process should decide on what physical components to provision the service, secure those resources and p
7、rovision to the options / parameters provided. The end result is a single “server”, located on the correct QinetiQ VLAN, providing the requested service characteristics (e.g. operating system and storage). Key focus here is the correct sequencing of the individual provisioning requests and ensuring
8、that the entire request is completed fully.,16,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-002: Basic Application Server De-provisioning,Function,Parameters,Deprovision an application server in a secure manner and return the components to the resource pools. Data should b
9、e backed up. Key focus here is the correct sequencing of the individual provisioning requests and ensuring that the entire request is completed fully,Application Server Name: Name,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Manage the end to end provisioning of the servi
10、ce Validate the request and action any due-diligence (e.g. determine if in use; provide a cooling off period) Determine the infrastructure components being used and construct the necessary provisioning requests,Mark as “Out of Service” Move to Quarantine VLANS and “clean” accordingly Deprovision the
11、 platform configuration Return capacity to the pool of available resource,Backup data and mark as archival “Wipe” data and return storage to the pool,Remove server from active monitoring Re-evaluate capacity across the infrasturcture Update the clients Service List to ensure billing records are accu
12、rate,Service Request Mgmnt 7.5 ITSM Suite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,17,Copyright 2009 Accenture All Rights Reserved.,FS-002,Key Functional Specifications Include De-provision an application server in a secure manner and return the components
13、to the resource pools. Data should be backed up. Key focus here is the correct sequencing of the individual provisioning requests and ensuring that the entire request is completed fully,18,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-003: Basic Server Modification,Function
14、,Parameters,Allow an authorised requester to change tiers of service. The changes allowed will be dependant on the current service class/tier,Service Item(s) Old Service Level/Tier New Service Level/Tier,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Manage the end to end c
15、hange Validate the change request and action any due diligence Determine the affected infrastructure components and created the necessary provisioning requests,For VMware this will provide for changes to virtual CPU and allocated memory For Blades move operating system to higher/lower class of serve
16、r Move operating system between physical and virtual infrastructure,Increase/decrease storage allocated Move storage allocation: SAN to NAS and vice versa Change data archiving policies,Update monitoring accordingly Update client billing records to reflect new tariff,Service Request Mgmnt 7.5 ITSM S
17、uite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,19,Copyright 2009 Accenture All Rights Reserved.,FS-003,Key Functional Specifications include Ability to modify a servers characteristics after deployment based on business or computing needs Increase utilizatio
18、n of available resources through improved allocation based on centrally managed infrastructure Ability to change service tier level in response to business requirements relating to that server Immediate update of billing instruction based on requested server changes,20,Copyright 2009 Accenture All R
19、ights Reserved.,Functional Requirement FS-004: Service Creation and Management,Function,Parameters,Allow a “Service” to be created from one or more application servers and define availability and performance characteristics.,Service Name Service Servers: List of application servers Availability: Hig
20、h| Standard Guarantee Performance: Yes | No,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Create Service in the CMDB Orchestrate required provisioning request for clustering of operating system, application or database,Action requests for clustering of Operating system and
21、/or application and/or database,None,Create necessary monitoring rules/alerts Update client billing records,BMC Event and Impact Mgmnt Atrium Core 7.5 BMC Atrium Orchestrator BMC Performance Mnger,BMC Products,21,Copyright 2009 Accenture All Rights Reserved.,FS-004,Key Functional Specifications Incl
22、ude Allow a Service to be created from one or more application servers and define availability and performance characteristics,22,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-005: Maintain Service Through a Platform Failure,Function,Parameters,Predictive Operations will de
23、tect a platform failure and, depending on the services availability class, will either: for Standard availability, raise a trouble ticket to have the outage dealt with manually For High availablity, provide alternate platform for hosting of the application and action automatically,Alert received tha
24、t Platform in the Service has failed,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Determine action to take dependent on Availablity class of the Service: “Standard” should raise a trouble ticket; “High” should initiate automatic repositioning Determine the platform compon
25、ents needed Create archive; decommission) Orchestrate required provisioing workflows in support of service requester decision (above) BMC Notes Use an advanced interface form within SRM and spawn two change requests, one for provisioning, one for de-provisioning In lieu of advanced interface form, w
26、e could create a drop-down questionnaire that will then create two change requests as described above,As for FS-001,As For FS-001,As for FS-001 plus Identify services/servers coming to end of service life and create alert Update client billing records Monitor capacity of long term and on-demand infr
27、astructure,Service Request Mgmnt 7.5 ITSM Suite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,29,Copyright 2009 Accenture All Rights Reserved.,FS-008,Key Functional Specifications Include Similar to FS-001 with the key differentiator being that the service durat
28、ion is short term (typically less than 12 months). This function may become just a parameter to the FS-001 function but is described separately,30,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-009: Manage Scientific Compute Grid Capacity,Function,Parameters,Many parts of th
29、e QinetiQ business require the ability to solve large numerical-based problems. Its anticipated that a block of the shared service infrastructure will be given over to providing a GRID service. The GRID will have a base size but will be able to expand / contract according to work load and schedules.
30、 Key will be the ability to maker temporary use of unsed servers,N/a,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,GRID will effectively be a Service (see FS004) that will scale up/down using the functions for archive, provisioning and reprovisioning of servers/services FS
31、001/002/007) Orchestrate the rapid repurposing of platform nodes,Rapid repurposing of platform to enable GRID capability,As per FS001/002/007) Provide storage to the GRID / reallocate storage to new nodes in the GRID,Monitor GRID service and react to capacity requests (assumed GRID itself will deter
32、mine capacity needs based on workload demands) Monitor live services to determine if they can be archived and used in the GRID Monitor archived services for when they need to come back on line Create alerts for Orchestration to provision/purpose servers,P U A,BMC Products,31,Copyright 2009 Accenture
33、 All Rights Reserved.,FS-009 Business Scenario,Key Functional Specifications Include Many parts of the QinetiQ business require the ability to solve large numerical-based problems. Its anticipated that a block of the shared service infrastructure will be given over to providing a GRID service. The G
34、RID will have a base size but will be able to expand / contract according to work load and schedules. Key will be the ability to maker temporary use of unsed servers,32,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-010: Single Point of Management and Control,Function,Parame
35、ters,Provide a single management console for the Utility Data Centre. Provide “overview” and “Drill down” capability across all services and components.,Time-base trigger,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Provide provisioning metrics to the billing component wi
36、thin Predictive Operations,Provide provisioning metrics to the billing component within Predictive Operations,Provide provisioning metrics to the billing component within Predictive Operations,Ability to accurately bill clients for use of the service,BMC Dashboards BMC Atrium Core 7.5 ITSM Suite 7.5
37、 BMC Event and Impact Mgmnt,BMC Products,33,Copyright 2009 Accenture All Rights Reserved.,FS-010 Business Scenario,Key Functional Specifications Include Provide a single Management console for the Utility Data Centre. Provide Overview and Drill-Down Capability across all services and components,34,C
38、opyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-011: Provisioning of File Shares,Function,Parameters,Provide a file-share for a period of time,Tier of storage Duration required VLAN required to be deployed to,Provisioning Orchestration,Server Platform,Storage,Predictive Operat
39、ions,Validate the request and action any due diligence Identify the infrastructure components Create & orchestrate the required provisioning workflows Send access details to requester,None,Provision the storage Set file/share security options,Ensure file share added to monitoring Monitor for when expiry dates are approaching Maintain client billing records,BMC Products,35,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-012: Usa
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 會議議程安排與時(shí)間控制制度
- 2026年杭州市錢江灣小學(xué)招聘非編語文教師備考題庫及參考答案詳解一套
- 中信證券股份有限公司沈陽市府大路證券營業(yè)部2026年校園招聘備考題庫附答案詳解
- 中學(xué)學(xué)生校園文化活動(dòng)制度
- 2026年陜西中放日昇科技產(chǎn)業(yè)發(fā)展有限公司公開招聘80人備考題庫及一套完整答案詳解
- 養(yǎng)老院物品管理制度
- 2026年首都醫(yī)科大學(xué)附屬北京朝陽醫(yī)院石景山醫(yī)院派遣合同制職工招聘備考題庫參考答案詳解
- 企業(yè)員工培訓(xùn)與職業(yè)規(guī)劃制度
- 企業(yè)辦公設(shè)備采購管理制度
- 交通違法行為記錄與查詢制度
- 【2025秋新版】八年級歷史上冊期末復(fù)習(xí)壓軸必考題
- 腦卒中考試題及答案
- 2025至2030中國異丙醇(IPA)行業(yè)市場占有率及投資前景評估規(guī)劃報(bào)告
- 2025秋季幼兒園工作計(jì)劃
- 譯林版五年級上冊英語單詞
- 鍋爐操作人員培訓(xùn)
- 零工市場(驛站)運(yùn)營管理 投標(biāo)方案(技術(shù)方案)
- 保障性住房智能管理系統(tǒng)解決方案
- 高中物理會考知識點(diǎn)及高中物理會考知識點(diǎn)總結(jié)
- 福特F-150猛禽說明書
- 上海布邦流體過濾產(chǎn)品知識課件
評論
0/150
提交評論