版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas
2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve
3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record
4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a
5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne
6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site
7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c
8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins
9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an
10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co
11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article
12、 46th武定縣2013年通村公路路面硬化工程第四合同段大新橋至香水公路(主線k0+000k4+370)分項(xiàng)開工申請(qǐng) 編 號(hào):LM-KG-01 施工里程:K0+940K1+700 工程名稱:混凝土路面 施工單位:江西贛基集團(tuán)工程有限公司2013年11月12日武定縣2013年通村公路路面硬化工程第四合同段A16 分項(xiàng)(分部)工程開工申請(qǐng)批復(fù)表施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程監(jiān)理有限公司 編 號(hào): 致(總監(jiān)理工程師) 李誠(chéng) : 根據(jù)合同要求,我們已經(jīng)做好下列工程開工前的準(zhǔn)備工作,現(xiàn)申請(qǐng)?jiān)摲猪?xiàng)(分部)工程正式開工,請(qǐng)予批準(zhǔn)。承包人: 年 月 日上一步工作檢
13、驗(yàn)結(jié)果(如果有): 申請(qǐng)開工工程項(xiàng)目: 混凝土路面k0+940k1+700 計(jì)劃開工日期:2013年11月12日計(jì)劃完成日期:2013年11月21日此項(xiàng)工程負(fù)責(zé)人姓名: 附件:1、進(jìn)場(chǎng)施工機(jī)械設(shè)備報(bào)驗(yàn)單; 2、進(jìn)場(chǎng)工程原材料報(bào)驗(yàn)單; 3、人員配備報(bào)驗(yàn)單; 4、施工測(cè)量放樣報(bào)驗(yàn)單; 5、施工方案及主要工藝報(bào)審表; 6、工程分包申請(qǐng)批復(fù)單(如有); 7、相關(guān)試驗(yàn)資料。駐地監(jiān)理工程師意見: 簽字: 年 月 日總監(jiān)理工程師意見: 簽字: 年 月 日武定縣2013年通村公路路面硬化工程第四合同段A16.1 進(jìn)場(chǎng)施工機(jī)械設(shè)備報(bào)驗(yàn)單施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程
14、監(jiān)理有限公司 編 號(hào): 分項(xiàng)(分部)工程名稱混凝土路面施工里程樁號(hào)k0+940k1+700 致(總監(jiān)理工程師) 李誠(chéng) :根據(jù)合同要求,以下施工機(jī)械設(shè)備已經(jīng)進(jìn)場(chǎng)且試運(yùn)行正常,請(qǐng)予查驗(yàn),并準(zhǔn)予使用。承包人: 年 月 日序號(hào)設(shè)備名稱型號(hào)單位數(shù)量進(jìn)場(chǎng)日期技術(shù)狀況1平板振動(dòng)器zp系列臺(tái)42013年10月4日良好2攪拌機(jī)JS450臺(tái)22013年10月4日良好3插入式振動(dòng)器JZ-50A臺(tái)42013年10月4日良好4行走式路面刻紋機(jī)ZQW150*18臺(tái)12013年10月4日良好5抹光機(jī)湖南長(zhǎng)葛900臺(tái)22013年10月4日良好6混凝土切縫機(jī)長(zhǎng)葛HLQ-18臺(tái)12013年10月4日良好7鑫木商砼罐車湖南輛520
15、13年10月4日良好8灑水車5T輛22013年10月4日良好9自卸汽車5T輛22013年10月4日良好10三軸攤鋪平整機(jī)臺(tái)22013年10月4日良好11200KW柴油發(fā)電機(jī)常發(fā)臺(tái)12013年10月4日良好總監(jiān)理工程師意見:簽字: 年 月 日武定縣2013年通村公路路面硬化工程第四合同段A16.2 進(jìn)場(chǎng)工程原材料報(bào)驗(yàn)單施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程監(jiān)理有限公司 編 號(hào): 分項(xiàng)(分部)工程名稱混凝土路面施工里程樁號(hào) k0+940k1+700 致(總監(jiān)理工程師) 李誠(chéng) :下列建筑材料經(jīng)自檢試驗(yàn),符合技術(shù)規(guī)范要求,報(bào)請(qǐng)驗(yàn)證,并準(zhǔn)予進(jìn)場(chǎng)使用。附件: 1、材料
16、出廠合格證書;2、材料試驗(yàn)報(bào)告。 承包人: 年 月 日材料名稱機(jī)制碎石機(jī)制砂PO.42.5材料產(chǎn)地 滑坡料場(chǎng)滑坡料場(chǎng)元謀水泥廠采用標(biāo)準(zhǔn)試驗(yàn)編號(hào) 試驗(yàn)結(jié)果可以使用可以使用可以使用用途(用在何工程或部位)路面路面路面本批材料數(shù)量滿足工程需要滿足工程需要滿足工程需要總監(jiān)理工程師意見:簽字: 年 月 日武定縣2013年通村公路路面硬化工程第四合同段A16.3 人員配備報(bào)驗(yàn)單施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程監(jiān)理有限公司 編 號(hào): 分項(xiàng)(分部)工程名稱混凝土路面施工里程樁號(hào)k0+940k1+700 致(總監(jiān)理工程師) 李誠(chéng) : 下列人員(包括項(xiàng)目負(fù)責(zé)人、技術(shù)負(fù)責(zé)
17、人及質(zhì)量、安全、環(huán)保等施工管理、自檢人員及主要操作人員)已按工程需要配備相關(guān)人員,請(qǐng)予以審查,并準(zhǔn)予批準(zhǔn)。承包人: 年 月 日序號(hào)姓名性別職務(wù)工作崗位備注1李宗菊女助工項(xiàng)目負(fù)責(zé)人2王文科男工程師項(xiàng)目部副總工3李宗雄男助工項(xiàng)目部副經(jīng)理4陳鵬男助工現(xiàn)場(chǎng)施工員5李陽男助工質(zhì)檢員6黃建平男助工安全員7黃明亮男助工施工員8劉斌男助工項(xiàng)目部質(zhì)檢員9李宗營(yíng)男助工機(jī)械管理10羅興明男助工資料員1112總監(jiān)理工程師意見: 簽字: 年 月 日武定縣2013年通村公路路面硬化工程第四合同段A16.4 施工測(cè)量放樣報(bào)驗(yàn)單施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程監(jiān)理有限公司 編 號(hào):
18、 分項(xiàng)(分部)工程名稱混凝土路面放樣部位(樁號(hào)) k0+940k1+700 致(總監(jiān)理工程師) 李誠(chéng) :我單位根據(jù)合同要求,已完成本項(xiàng)工程的施工放線,請(qǐng)給予檢驗(yàn)審批。附件:1、施工設(shè)計(jì)圖紙復(fù)印件;2、實(shí)測(cè)地面縱、橫斷面圖;3、施工放線資料、測(cè)量記錄、計(jì)算表等。項(xiàng)目技術(shù)負(fù)責(zé)人: 年 月 日總監(jiān)理工程師意見: 簽字: 年 月 日 武定縣2013年通村公路路面硬化工程第四合同段A16.5 施工方案及主要工藝報(bào)審表施工單位:江西贛基集團(tuán)工程有限公司 合同號(hào): 四 監(jiān)理單位:云南升盟公路工程監(jiān)理有限公司 編 號(hào): 致(總監(jiān)理工程師) 李誠(chéng) :現(xiàn)上報(bào)下列工程的施工方案及主要工藝,請(qǐng)給予審批。附件:施工方案
19、及主要工藝(包括組織設(shè)計(jì)、施工方案及主要工藝、技術(shù)控制措施、質(zhì)量控制措施、安全生產(chǎn)保證措施、環(huán)境保護(hù)與水土保持措施等)。 項(xiàng)目技術(shù)負(fù)責(zé)人: 年 月 日分項(xiàng)(分部)工程名稱混凝土路面施工樁號(hào) k0+940k1+700 計(jì)劃開工日期2013年11月12日計(jì)劃完工日期2013年11月21日施工方案及主要工藝簡(jiǎn)要說明:施工準(zhǔn)備基層檢驗(yàn)測(cè)量放線安設(shè)模板混凝土拌和混凝土運(yùn)輸攤鋪與振搗安放加強(qiáng)鋼筋養(yǎng)生及拆模駐地監(jiān)理工程師意見:簽字: 年 月 日總監(jiān)理工程師意見: 簽字: 年 月 日混凝土路面施工方案及主要工藝1、遵循規(guī)范水泥混凝土路面是在已完成并經(jīng)監(jiān)理工程師驗(yàn)收合格的基層上鋪筑。施工中嚴(yán)格按公路水泥混凝土路
20、面施工技術(shù)規(guī)范(JTG F30-2003)組織施工。2、材料要求1)水泥。用于水泥混凝土的水泥,應(yīng)采用強(qiáng)度高、收縮性小、耐磨性強(qiáng)、抗凍性好的道路水泥。水泥符合國(guó)家和行業(yè)的現(xiàn)行標(biāo)準(zhǔn),其標(biāo)號(hào)不得低于42.5級(jí)。發(fā)貨:每批水泥出廠前,我單位對(duì)廠家水泥的品質(zhì)進(jìn)行檢查復(fù)驗(yàn),每批水泥發(fā)貨時(shí)均附有出廠合格證和復(fù)檢資料。每批水泥運(yùn)至工地后,試驗(yàn)室會(huì)同監(jiān)理工程師對(duì)水泥進(jìn)行抽樣檢測(cè)。 運(yùn)輸:水泥運(yùn)輸過程中注意其品種和標(biāo)號(hào)不得混雜,采取有效措施防止水泥受潮。儲(chǔ)存:進(jìn)場(chǎng)的水泥按不同品種、標(biāo)號(hào)、出廠批號(hào)、袋裝或散裝等,分別貯放在專用的倉(cāng)庫或儲(chǔ)罐中,防止因貯存不當(dāng)引起水泥變質(zhì)。袋裝水泥出廠日期不超過3個(gè)月,散裝水泥不超過
21、6個(gè)月。2)粗集料碎石。用于混凝土粗集料碎石,質(zhì)地堅(jiān)硬、耐久、潔凈,符合一定級(jí)配,碎石中含有活性骨料、黃銹等時(shí),必進(jìn)行專門試驗(yàn)后,才能使用。3)細(xì)集料用砂。混凝土細(xì)集料用砂,質(zhì)地堅(jiān)硬、清潔,滿足一定的級(jí)配和細(xì)度,級(jí)配良好,細(xì)度模數(shù),在2.43.0范圍內(nèi),有害雜質(zhì)含量少。標(biāo)準(zhǔn)級(jí)配范圍詳見有關(guān)技術(shù)規(guī)范。4)拌和用水。清洗集料、拌和混凝土及養(yǎng)生所用的水不含有影響混凝土質(zhì)量的油、酸、堿、鹽類有機(jī)物等。凡適宜飲用的水均可使用。拌和用水所含物質(zhì)不影響混凝土和易性和混凝土強(qiáng)度的增長(zhǎng),以及引起傳力桿鋼筋和混凝土的腐蝕。5)混凝土外加劑。為改變混凝土的技術(shù)性質(zhì),而采用的外加劑的質(zhì)量符合國(guó)家標(biāo)準(zhǔn)的規(guī)定,并在充分調(diào)
22、查試驗(yàn)和實(shí)地試用后,再?zèng)Q定所選用的外加劑是否適用。6)填縫料。填縫料應(yīng)選用與混凝土粘接力強(qiáng)、回彈性好,能適應(yīng)混凝土的收縮、不溶于水,不滲水,高溫不溢,低溫不脆的耐久性材料。7)鋼筋。用作傳力桿、拉桿及補(bǔ)強(qiáng)的鋼筋,其品種、規(guī)格符合設(shè)計(jì)要求,并順直,不得有裂縫、斷傷、刻痕。表面的油污和顆粒狀或片狀銹蝕清除。3、混凝土配合比設(shè)計(jì)水泥混凝土路面, 設(shè)計(jì)要求混凝土彎拉強(qiáng)度不低于4.0 MPa,用于鋪筑混凝土面層的各種材料在用于工程之前,按公路水泥混凝土路面施工技術(shù)規(guī)范(JTG F30-2003)的有關(guān)規(guī)定,通過試驗(yàn)進(jìn)行混合料配合比設(shè)計(jì)。并根據(jù)現(xiàn)場(chǎng)的實(shí)際情況澆筑條件,比如集料的供應(yīng)情況,攤鋪機(jī)具和氣候條件
23、,進(jìn)行適當(dāng)調(diào)整,提出施工配合比,報(bào)監(jiān)理工程師審批?;炷僚浜媳仍O(shè)計(jì)設(shè)計(jì)程序如圖。砼配合比設(shè)計(jì)程序圖質(zhì)量控制最大強(qiáng)度可能化學(xué)侵蝕或大體積砼密實(shí)性截面尺寸要求的和易性骨料最大粒徑骨料形狀和質(zhì)地平均強(qiáng)度水泥品種達(dá)到預(yù)期強(qiáng)度的齡品種耐久性水灰比骨料比骨料全級(jí)配配合比每盤各級(jí)分重量攪拌機(jī)容量4、施工工藝混凝土路面的施,采取集中制拌、混凝土運(yùn)輸車運(yùn)輸、泵送混凝土入模、振動(dòng)梁機(jī)械振搗、真空吸水技術(shù)、薄膜復(fù)蓋澆水養(yǎng)生。1) 施工工藝框圖見混凝土路面施工施工工藝框圖。水泥混凝土路面施工工藝框圖測(cè)量放樣安裝模板安裝傳力桿、拉桿鋼筋網(wǎng)片等上道工序檢測(cè)運(yùn)送砼攤鋪、振搗砼震動(dòng)梁振平砼培路肩模板加工鋼筋加工砼配合比選定拌
24、制砼制作試件砼真空吸水抹 光砼養(yǎng)生切縫、填縫、刻紋養(yǎng) 生2)混凝土拌和、運(yùn)輸、攤鋪及養(yǎng)生的施工方法及注意事項(xiàng)(1)正常施工前對(duì)基層進(jìn)行質(zhì)量檢驗(yàn)和整修。將監(jiān)理工程師認(rèn)可的基層表面上的雜物浮土予以清除,并進(jìn)行必要的整修。(2)測(cè)量放樣是混凝土路面施工的一項(xiàng)重要工作。據(jù)放好的路中心線和邊線,在現(xiàn)場(chǎng)核對(duì)施工圖紙的混凝土分界線和邊線,保證放樣時(shí),曲線地段混凝土塊橫向分界線與路中心線垂直。測(cè)量放樣須經(jīng)常進(jìn)行復(fù)核,包括在混凝土澆筑過程中,要做到勤測(cè)、勤核、勤糾偏。(3)混凝土在自動(dòng)配料攪拌機(jī)拌和站制拌,混凝土運(yùn)輸車運(yùn)輸?;炷翉臄嚢铏C(jī)出料后運(yùn)到鋪筑地點(diǎn)澆筑完畢的允許最長(zhǎng)時(shí)間,據(jù)實(shí)驗(yàn)室的水泥初凝時(shí)間及施工氣溫
25、確定,并符合公路水泥混凝土路面施工技術(shù)規(guī)范的規(guī)定。(4)模板采用鋼模板,連接牢固、緊密、不漏漿,并按要求的坡度和線向安設(shè)?;旌狭蠑備伹皩?duì)模板進(jìn)行全面檢查,并經(jīng)監(jiān)理工程師認(rèn)可。(5)混凝土采用泵送入模、自行式混凝土全自動(dòng)提漿整平整,配合人工攤鋪,使用前報(bào)監(jiān)理工程師批準(zhǔn)。(6)不能用機(jī)械攤鋪的區(qū)域,經(jīng)監(jiān)理認(rèn)可也可用攤鋪在整個(gè)寬度連續(xù)進(jìn)行。中途因故停工,設(shè)施工縫。攤鋪厚度考慮振實(shí)預(yù)留高度。采用人工攤鋪時(shí)嚴(yán)禁拋擲和耬耙,以防離析。(7)對(duì)混凝土的振搗,每一位置的持續(xù)時(shí)間以混合料停止下沉,不再冒氣泡并泛出砂漿為準(zhǔn)。振搗時(shí)鋪以人工找平,表面平整時(shí),選用較細(xì)的碎石混合料,嚴(yán)禁用純砂漿找平。(8)做面時(shí),嚴(yán)禁
26、在混凝土面板上灑水,撒水泥粉,當(dāng)烈日暴曬或干旱風(fēng)吹時(shí),在遮陰棚下進(jìn)行。并按設(shè)計(jì)要求進(jìn)行表面處理,以保證混凝土路面的抗滑要求。(9)混凝土板做面完畢,及時(shí)養(yǎng)生,采用濕治養(yǎng)護(hù),養(yǎng)護(hù)法需報(bào)監(jiān)理工程師批準(zhǔn)。5、施工縫、脹縫的施工 1)縱向縮縫(本工程設(shè)計(jì)無縱向接縫) 縱向縮縫平行于路中心線,并按圖紙要求的位置設(shè)置。縱向縮縫采用切縫法。在混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的2530時(shí),用切縫機(jī)切割,切割產(chǎn)生的粉末在其干燥前清除干凈??v向縮縫設(shè)置拉桿時(shí),拉桿采用螺紋鋼筋,并設(shè)置在板厚中央。 2)橫向縮縫 橫向縮縫與路面中心線垂直,并符合圖紙要求。設(shè)計(jì)要求設(shè)傳力桿的橫向縮縫,必須按設(shè)計(jì)埋置傳力桿。 橫向縮縫采用切縫法施
27、工。當(dāng)混凝土達(dá)到設(shè)計(jì)強(qiáng)度的2530時(shí),用切割機(jī)進(jìn)行切割。 3)脹縫 脹縫與路面中心線垂直,縫壁必須垂直并符合圖紙要求。 脹縫的縫隙寬度必須一致,縫中不得連漿??p隙上部澆筑填縫料,下部設(shè)置脹縫板。 脹縫傳力桿的活動(dòng)端,可設(shè)在縫的一邊或交錯(cuò)布置,固定后的傳力桿必須平行于板面及路面中心線,其誤差不得大于5mm。多車道路面脹縫應(yīng)做成一條連續(xù)縫。 4)橫向施工縫 每天工作結(jié)束或澆筑工序中斷超過2h混凝土已初凝時(shí),設(shè)置平接橫向施工縫。橫向施工縫位置,宜與脹縫或縮縫設(shè)計(jì)位置吻合,與路面中心線垂直。5)填縫混凝土面板所有接縫凹槽都按圖紙規(guī)定,用填縫料填縫。填縫材料和填縫方法經(jīng)監(jiān)理工程師批準(zhǔn)。 縫槽在混凝土養(yǎng)生
28、期滿后及時(shí)填縫,填縫前必須保持縫內(nèi)干燥清潔,防止砂石等雜物綽人縫內(nèi)。填縫前經(jīng)監(jiān)理工程師檢查。 填縫料與混凝土縫壁粘附緊密,其灌注深度宜為縫寬的2倍,當(dāng)深度大于3040毫米時(shí),可填人多孔柔性襯底材料。在夏季應(yīng)使填縫料灌至與板面齊平。在開放交通前,填縫料有充分的時(shí)間硬結(jié)。6、取樣和試驗(yàn) 為了控制混凝土的質(zhì)量,須制作抗彎折強(qiáng)度試件。當(dāng)監(jiān)理工程師提出要求時(shí),公司還作抗壓強(qiáng)度等試驗(yàn)??拐蹚?qiáng)度采用小梁試件方法測(cè)定,也可采用圓柱劈裂強(qiáng)度推算小梁抗折強(qiáng)度。當(dāng)采用鉆取圓芯檢驗(yàn)的推算強(qiáng)度和小梁抗折強(qiáng)度時(shí),同時(shí)符合規(guī)定的強(qiáng)度要求?;炷量拐蹚?qiáng)度檢驗(yàn)符合以下規(guī)定: 1) 使用正在攤鋪的混凝土拌合物制作試件,試件的養(yǎng)護(hù)
29、條件與現(xiàn)場(chǎng)混凝土板養(yǎng)護(hù)相同。 2) 每天或每鋪筑200m3,同時(shí)制取試件3組(每組9個(gè)),齡期分別為7天和28天。每鋪筑1500 m3混凝土增做一組試件,用于檢查后期強(qiáng)度,齡期不小于90天。 3) 如果試件表明道路水泥混凝土的7天強(qiáng)度達(dá)不到28天(換算成標(biāo)準(zhǔn)養(yǎng)護(hù)條件的強(qiáng)度)強(qiáng)度的60(礦渣水泥混凝土為50)時(shí),檢查分析原因,并對(duì)混凝土配合比作適當(dāng)修正。4) 澆筑完成的混凝土板,檢驗(yàn)實(shí)際強(qiáng)度,可現(xiàn)場(chǎng)鉆取圓柱試件,進(jìn)行圓柱劈裂強(qiáng)度的試驗(yàn),以圓柱劈裂強(qiáng)度推算小梁抗折強(qiáng)度。regular issuance system of internal and external accident cases,
30、organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing the concept of legalization of production safety, establish a people-oriented concept, three do no harm (dont hurt
31、yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with shift operation and tasks for better risk analysis, arranged security account considerations. After class: summarizi
32、ng comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day event organized by the monitor, safety help, workshop leaders and checking activities. Classes (groups) or rotating a
33、safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security incidents, as well as the typical illegal team, analysis of operation environment, there may be a risk factor for th
34、e main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons learned from and the weakness in safety management, accident prevention measures in the study. Meeting was chaired
35、by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys periodic and non-periodic safety checks should be carried out. Periodic inspection includes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, integrated security, analysis of accident law, dra
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 輕鋼龍骨制作工風(fēng)險(xiǎn)評(píng)估與管理考核試卷含答案
- 民族拉弦彈撥樂器制作工崗前崗后考核試卷含答案
- 鑿巖工安全生產(chǎn)基礎(chǔ)知識(shí)能力考核試卷含答案
- 喪葬撫恤委托書
- 2025年胃動(dòng)力藥項(xiàng)目發(fā)展計(jì)劃
- 2025年陳設(shè)藝術(shù)陶瓷制品項(xiàng)目發(fā)展計(jì)劃
- 2026年數(shù)字孿生 航空發(fā)動(dòng)機(jī)運(yùn)維項(xiàng)目建議書
- 2026年環(huán)視全景影像系統(tǒng)項(xiàng)目評(píng)估報(bào)告
- 2025年數(shù)字媒體藝術(shù)專業(yè)考試試題及答案
- 家居環(huán)境適老化評(píng)估量表、適老化改造設(shè)計(jì)方案要點(diǎn)
- 湖南省2025-2026學(xué)年七年級(jí)歷史上學(xué)期期末復(fù)習(xí)試卷(含答案)
- 2026新疆阿合奇縣公益性崗位(鄉(xiāng)村振興專干)招聘44人考試參考試題及答案解析
- 紡織倉(cāng)庫消防安全培訓(xùn)
- 器官移植術(shù)后排斥反應(yīng)的風(fēng)險(xiǎn)分層管理
- 虛擬電廠關(guān)鍵技術(shù)
- 事業(yè)單位清算及財(cái)務(wù)報(bào)告編寫范本
- 護(hù)坡綠化勞務(wù)合同范本
- 臨床績(jī)效的DRG與CMI雙指標(biāo)調(diào)控
- 物料提升機(jī)保養(yǎng)記錄表
- 中華系列期刊目錄
- 馬口鐵空罐檢驗(yàn)標(biāo)準(zhǔn)
評(píng)論
0/150
提交評(píng)論