下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、EPOXIDATION CATALYST PREPARATION SYSTEM EMERGENCY SHUTDOWNNOTE: This is for Training only, and is not intended to be used as a step by step procedure.PO/MTBEEpoxidation Catalyst Preparation System Emergency ShutdownPURPOSEThe purpose of this procedure is to shutdown the Epoxidation Catalyst Preparat
2、ion System to a safe condition in the event of an emergency shutdown.CONDITIONSAn emergency shutdown of the Epoxidation Catalyst Preparation System should occur in the event of a gasket failure, line rupture, fire/explosion, or a utilities failure. In an emergency shutdown condition, only the contro
3、l valves will be closed using the valves controller unless a control valve is suspected of leaking through. In those special cases, a block valve will have to be manually closed to eliminate the leakage.NOTE: This is for Training only, and is not intended to be used as a step by step procedure.PO/MT
4、BEGUIDELINE Close control valve FV-28681 on ethylene glycol into Catalyst Preparation Reactor. Notify operator to shut down the ethylene glycol pump. Close control valve KV-28619 on S4 steam to Catalyst Preparation Reactor. Line up Catalyst Solution to Catalyst Recovery Drum if Catalyst Preparation
5、Reactor has to be de-inventoried due to emergency. Open control valve HV-28687 on Catalyst solution out of Catalyst Preparation Reactor using HS-28687. Close block valve on outlet of 01S0203 Catalyst Solution Filter. Ensure block valves on outlets of 01E0202 and 01E0204 that allow recycle back to th
6、e inlet of 01S0203 are closed. Ensure globe valve on EG/MO catalyst complex line, located on the discharge of 01P0274, to Catalyst Recovery Drum is open. Ensure block valve on EG/MO catalyst by-passing 01D0323 to the OSBL Catalyst Residue tank is closed. Ensure block valve ethylene glycol make-up li
7、ne is closed. Open block valve on the discharge of 01P0259 that will allow deinventory of 01R0286 to the Moly Blowdown system to 01D0231 Catalyst Solution Blowdown pot. Start Catalyst Solution Transfer Pump 01P0259. Monitor level in 01D0231 Catalyst Solution Blowdown pot. Operate 01P0274 Catalyst Solution Blowdown pump as required to control level. Deinventory contents of Catalyst Preparation Reactor if emergency requires. Shutdown Catalyst Solution Transfer Pump 01P0259 and 01P0274 Catalyst Solution Blowdown pump after de-inventory of reactor. Isolate leak. D
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年高職教育測量與評價(評價方法應(yīng)用)試題及答案
- 斑塊穩(wěn)定性增強的干細胞治療策略
- 教體局消防培訓(xùn)課件模板
- 養(yǎng)老院老人生活照顧人員考核獎懲制度
- 養(yǎng)老院老人健康飲食營養(yǎng)師激勵制度
- 養(yǎng)老院入住老人醫(yī)療保健制度
- 2026年開放大學(xué)校長信息化試題含答案
- 2026年邊防巡邏防控技能考核題庫含答案
- 2026年認證認可條例中認證人員行為規(guī)范練習(xí)題及答案
- 2026年公務(wù)員誠信體系建設(shè)試題含答案
- 2026年美團商業(yè)分析師崗位筆試解析與面試問答技巧
- 某高校十五五教育大數(shù)據(jù)治理中心與智慧校園支撐平臺建設(shè)方案
- 2026年山西警官職業(yè)學(xué)院單招綜合素質(zhì)考試備考試題帶答案解析
- (2026春新版)人教版二年級數(shù)學(xué)下冊全冊教學(xué)設(shè)計
- 汽修廠文件檔案歸檔制度
- 高??蒲许椖苛㈨椉肮芾硪?guī)范
- 2026年工業(yè)數(shù)字化能碳管理項目可行性研究報告
- 《事故隱患排查治理資金使用專項制度》
- 肯德基加盟協(xié)議書
- 企業(yè)ERP系統(tǒng)維護操作手冊
- 2025中國機械工業(yè)集團有限公司(國機集團)社會招聘19人筆試參考題庫附答案
評論
0/150
提交評論