內(nèi)容教程案例_第1頁(yè)
內(nèi)容教程案例_第2頁(yè)
內(nèi)容教程案例_第3頁(yè)
免費(fèi)預(yù)覽已結(jié)束,剩余4頁(yè)可下載查看

付費(fèi)下載

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、Drafted Checked Reviewed Approved Modification-BFANGCHENGGANGNUCLEARPOWER PLANT PHASE I (21000MW)文件編DOC. 電氣廠房消防系統(tǒng)手SystemManual-6.66.7作原則和動(dòng)力源故障分Chapter6.6,6.7OperatingPrincipleandSupplyFailure工程Project文件類Document子項(xiàng)Sub-Item設(shè)計(jì)階EngineeringSBDocument A:B:C:深圳中廣核工程設(shè)計(jì)有限公司 NationalAgradeengineeringCertifica

2、tionNO:NationalAgradeengineeringCertificationNO:內(nèi)部編碼Internal This document is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permission of CNPDC 本文件之產(chǎn)權(quán)屬于中廣核工程設(shè)文文件種類SystemManualSystemManualJPLChapter6.6,6.7OperatingPrincipleandSupplyFailureRev.

3、版本記REVISION版日狀編Drafted校Checked審Reviewed批Approved修改說(shuō)Modification-AZengFirstFANGCHENGGANGNUCLEARPOWER PLANT PHASE I (21000MW)電氣廠房消防系統(tǒng)手冊(cè)JPL-Electrical Building Fire Protection System Manual6.6, 6.7 章 操作原則和動(dòng)力源故障分析Chapter 6.6, 6.7 Operating Principle and Supply Failure AnalysisCHINANUCLEARPOWERDESIGNCOMP

4、ANY,LTD(SHENZHEN) FEBRUARY, 2012文件修改記版日章頁(yè)修改范圍及依FirstUpdatetoCFCwithno SystemManualSystemManualJPLChapter6.6,6.7OperatingPrincipleandSupplyFailureRev. SystemManualSystemManualJPLChapter6.6,6.7OperatingPrincipleandSupplyFailureRev.BOPERATING Drynetworkat +11.5mand +15.50mlevel (I&Cequipment The fixed

5、water-spray network is filled in water by manual opening of the two isolating valves. The spraying becomes effective only where the sprinklers have been Wetnetwork at -3,40mand +3.80m(cabledecks and Normally spraying is automatically released by means of fire detection system; neverthelessitispossib

6、letoactuatethisonethroughmanualactiononthepushbutton of the local JDT mimic panel or main control room. Additionally spraying may be directly released in case of incorporated in the automatic deluge valve. This information is also available in the main control room corresponding Safety Fire Volume D

7、isplay.Thedry networkis manuallyshutdown byclosing theisolating Likewise here above the wet network-shutdown requires first the isolating valve closing, then after the cause ceasing (fire or fault) which has induced the actuation, the used bulb must be replaced by a new one.IncidentIn case of fire d

8、etection fault, spraying can be actuated manually by means of a remote control push button for each spraying area, located on the local JDT mimic In case of accidental spraying, as soon as sprinkling alarm has been received in the control room, an operator goes to involved fire valve location, after

9、 affirms the absence of fire then he turns off the isolation valve associated with the flow status lamp located on the local JDT mimic panel.POWER SUPPLY FAILURE Lossof48VDCpowerThe control of deluge valves is lost, in the event of fire, they can only be opened by actuated the quartz bulb in the sprinkler.After power supply recovery, here above electrical function resume their normal Lossof220VACpowerThe control of deluge valves is lost, in the event of fire, they can only be opened by actuated the quartz

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論